Waewick
- Super Size Scraper Poster!
- Posts: 3797
- Joined: Tue Jun 10, 2008 1:39 pm
#1216
Post
by Waewick » Fri Feb 03, 2012 3:15 pm
rev wrote:The only land that would have been acquired is probably a slice of the golf course near days road.
There aren'y any houses along that part of South Road, and I haven't noticed any businesses that have lost land.
Anzac Hwy underpass though they did acquire some property/land.
check again....
-
Aidan
- Super Size Scraper Poster!
- Posts: 2148
- Joined: Fri Dec 08, 2006 3:10 am
- Location: Christies Beach
#1217
Post
by Aidan » Fri Feb 03, 2012 6:11 pm
Waewick wrote:rev wrote:The only land that would have been acquired is probably a slice of the golf course near days road.
There aren'y any houses along that part of South Road, and I haven't noticed any businesses that have lost land.
Anzac Hwy underpass though they did acquire some property/land.
check again....
Having checked again on
Nearmap, Rev's almost right - apart from the golf course, most of the land acquired has been from a watercourse beside South Road. Some businesses have lost a bit of land, but no buildings appear to have needed demolishing - though I can't be 100% sure because in industrial areas like that, buidings are constructed and demolished all the time.
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.
-
Waewick
- Super Size Scraper Poster!
- Posts: 3797
- Joined: Tue Jun 10, 2008 1:39 pm
#1218
Post
by Waewick » Sat Feb 04, 2012 12:05 am
there may or may not have been a significant piece of land acquired....
-
AG
- VIP Member
- Posts: 2099
- Joined: Thu Jul 21, 2005 9:44 am
- Location: Adelaide SA
#1219
Post
by AG » Sat Feb 04, 2012 12:20 am
Quite a bit of land was acquired on the western side of South Road between Days Road and Grand Junction Road for the site office and casting yards for the concrete segments. Also, some land on the western side north of Grand Junction Road has also been acquired for temporary road.
-
adamd
- Sen-Rookie-Sational
- Posts: 9
- Joined: Fri Dec 16, 2011 9:52 pm
#1220
Post
by adamd » Mon Feb 13, 2012 9:13 pm
AG wrote:If anyone wants to see a big detour of a diversion of South Road, check out the section just north of Grand Junction Road on Nearmap (14th Jan). I would hate to be a semi driver negotiating those four 90 degree turns one after another!
If you mean the north bound diversion that wraps around the Caltex service station, if you check Feb 1 Nearmap you will see both lanes run northbound and they have placed a lane specifically for a truck to use, with all 4 corners widened to facilitate turning. Having driven it numerous times, the lanes are quite flowing and generous in their dimensions, these are not detour 'goat tracks'
-
crawf
- Donating Member
- Posts: 5521
- Joined: Thu Feb 16, 2006 7:49 pm
- Location: Adelaide
#1221
Post
by crawf » Mon Feb 13, 2012 9:44 pm
Went through South Road the other day, and this thing is huge. Will look great once it's completed
-
Paulns
- Donating Member
- Posts: 470
- Joined: Sun Sep 02, 2007 11:55 am
#1222
Post
by Paulns » Thu Apr 05, 2012 4:13 am
Has anyone got any latest photos of what's happening at this site? Would be much appreciated!
"SA GOING ALL THE WAY".
-
rev
- SA MVP (Most Valued Poster 4000+)
- Posts: 6456
- Joined: Sat Nov 11, 2006 12:14 pm
#1223
Post
by rev » Thu Apr 05, 2012 1:17 pm
Quite a lot has been happening.
The elevated section near Days Road is almost all joined up. Well the first two piers or so anyway leading back to the bit the road elevation thing from south road. It looks impressive in person. Very imposing on the surrouding landscape.
The support piers are going to be going up very soon a little further up South Road just past BP and around Grand Junction road.
The area near the Port River expressway has had some earthworks done and yesterday they were laying bitumen, so I guess some new lanes. There's still earthworks going on the western side.
-
Waewick
- Super Size Scraper Poster!
- Posts: 3797
- Joined: Tue Jun 10, 2008 1:39 pm
#1224
Post
by Waewick » Thu Apr 05, 2012 1:54 pm
is there any indication that the feds will cough up for more money to keep it going? (I'm assuming a few people around here have some insight into this)
-
Nort
- Super Size Scraper Poster!
- Posts: 2305
- Joined: Tue Feb 09, 2010 2:08 pm
#1225
Post
by Nort » Thu Apr 05, 2012 5:20 pm
Waewick wrote:is there any indication that the feds will cough up for more money to keep it going? (I'm assuming a few people around here have some insight into this)
The areas past where it currently ends are a bit too residential for a project like this I would think.
-
mattblack
- Legendary Member!
- Posts: 1108
- Joined: Fri Feb 15, 2008 11:20 am
#1226
Post
by mattblack » Fri Apr 06, 2012 9:42 am
Nort wrote:Waewick wrote:is there any indication that the feds will cough up for more money to keep it going? (I'm assuming a few people around here have some insight into this)
The areas past where it currently ends are a bit too residential for a project like this I would think.
A study is underway in the whole section between this and the Gallipoli underpass. Should be hearing something this year I would think. Funding is another matter though.
-
AdelaideAlive
- High Rise Poster!
- Posts: 243
- Joined: Tue Apr 20, 2010 4:03 pm
#1227
Post
by AdelaideAlive » Fri Apr 06, 2012 10:58 am
if it cost $800 mill approx for a stretch aprox 3km how much money and timeframe would it take to do the rest, unfort it may take at least another 10 years to be completed
-
ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2780
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
-
Contact:
#1228
Post
by ChillyPhilly » Sun Apr 08, 2012 10:56 pm
The State Government has set a target of 2020 by which to have the whole South Road project completed. Eight years left. Fingers crossed!
I'd like to see them tackle Regency Road to Anzac Highway in one hit. But if they were to do that hypothetically, that would mean creating an alternate north-south route while works are in progress. If that ever becomes the case, I would go with Hanson/Kilkenny/Holbrooks/Marion Roads or something. From my knowledge, quite a few homes around the immediate area of David Terrace in Woodville Park are owned by DTEI or some branch of government.
Our state, our city, our future.
All views expressed on this forum are my own.
-
rev
- SA MVP (Most Valued Poster 4000+)
- Posts: 6456
- Joined: Sat Nov 11, 2006 12:14 pm
#1229
Post
by rev » Tue Apr 10, 2012 10:17 pm
AdelaideAlive wrote:if it cost $800 mill approx for a stretch aprox 3km how much money and timeframe would it take to do the rest, unfort it may take at least another 10 years to be completed
It depends on what they do for the rest of South Road.
This bit cost $800 million because of what it is, an elevated highway.
The cost probably increases slightly when they keep the majority of the road open so traffic continues to flow and they work around it.
That would probably slow construction down a bit as opposed to closing that section of South Road down entirely and working with unfettered access for construction crews.
-
ml69
- Legendary Member!
- Posts: 1009
- Joined: Mon Jan 03, 2011 11:16 pm
- Location: Adelaide SA
#1230
Post
by ml69 » Wed Apr 11, 2012 12:02 am
rev wrote:AdelaideAlive wrote:if it cost $800 mill approx for a stretch aprox 3km how much money and timeframe would it take to do the rest, unfort it may take at least another 10 years to be completed
It depends on what they do for the rest of South Road.
This bit cost $800 million because of what it is, an elevated highway.
The cost probably increases slightly when they keep the majority of the road open so traffic continues to flow and they work around it.
That would probably slow construction down a bit as opposed to closing that section of South Road down entirely and working with unfettered access for construction crews.
There's no obvious solution, but shutting down South Rd for months or years would not be an option.
What about the hundreds of businesses fronting South Rd?