[COM] South Road Superway | $842m | 3km

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
rev
SA MVP (Most Valued Poster 4000+)
Posts: 6380
Joined: Sat Nov 11, 2006 12:14 pm

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1231 Post by rev » Wed Apr 11, 2012 8:53 am

Never said anything of the sort.

crawf
Donating Member
Donating Member
Posts: 5527
Joined: Thu Feb 16, 2006 7:49 pm
Location: Adelaide

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1232 Post by crawf » Mon Apr 16, 2012 3:19 am

South Road Superway Project, taken today by me

Image
IMG_0120 by sc2100, on Flickr

Image
IMG_0119 by sc2100, on Flickr

Image
IMG_0117 by sc2100, on Flickr

Image
IMG_0114 by sc2100, on Flickr

Image
IMG_0113 by sc2100, on Flickr

Image
IMG_0111 by sc2100, on Flickr

Image
IMG_0112 by sc2100, on Flickr

Image
IMG_0122 by sc2100, on Flickr

Image
IMG_0125 by sc2100, on Flickr

AdelaideAlive
High Rise Poster!
Posts: 243
Joined: Tue Apr 20, 2010 4:03 pm

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1233 Post by AdelaideAlive » Mon Apr 16, 2012 5:42 pm

come on crawf at least you could of cleaned the bird poop off your windscreen before you took the pics,not asking for too much is it :lol:

User avatar
ynotsfables
High Rise Poster!
Posts: 296
Joined: Tue Aug 14, 2007 11:15 am

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1234 Post by ynotsfables » Mon Apr 16, 2012 9:21 pm

I thought it was a UFO :lol:

User avatar
Norman
Donating Member
Donating Member
Posts: 6488
Joined: Sun Mar 25, 2007 1:06 pm

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1235 Post by Norman » Tue Apr 17, 2012 8:26 am

Video from yesterday:

crawf
Donating Member
Donating Member
Posts: 5527
Joined: Thu Feb 16, 2006 7:49 pm
Location: Adelaide

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1236 Post by crawf » Tue Apr 17, 2012 2:48 pm

AdelaideAlive wrote:come on crawf at least you could of cleaned the bird poop off your windscreen before you took the pics,not asking for too much is it :lol:
Grrr it does too. Oh well it wasn't a planned thing, I just decided to quickly grab out my phone whilst we were driving along South Road.

The sheer size of this is impressive in real life!

AdelaideAlive
High Rise Poster!
Posts: 243
Joined: Tue Apr 20, 2010 4:03 pm

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1237 Post by AdelaideAlive » Tue Apr 17, 2012 3:12 pm

crawf wrote:
AdelaideAlive wrote:come on crawf at least you could of cleaned the bird poop off your windscreen before you took the pics,not asking for too much is it :lol:
Grrr it does too. Oh well it wasn't a planned thing, I just decided to quickly grab out my phone whilst we were driving along South Road.

The sheer size of this is impressive in real life!
haha make sure you learn for next time loll nah well done mate :applause:

User avatar
monotonehell
VIP Member
VIP Member
Posts: 5466
Joined: Fri Feb 01, 2008 12:10 am
Location: Adelaide, East End.
Contact:

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1238 Post by monotonehell » Tue Apr 17, 2012 6:38 pm

Meh, try the Orange Crush on the I5 near Disneyland... ;)


(about 2mins in)

http://maps.google.com.au/maps?q=orange ... s&t=w&z=14

http://en.wikipedia.org/wiki/Orange_Crush_interchange
Exit on the right in the direction of travel.

mutt
High Rise Poster!
Posts: 148
Joined: Tue Apr 17, 2012 7:46 pm

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1239 Post by mutt » Tue Apr 17, 2012 7:57 pm

hi, i've been paying close attention to the south road upgrade/construction

i'm seeing after the elevated section is completed, the next phase is the northern connector, (federal government funding permitting)...and then the section between regency road and anzac highway will be looked at.

i understand this is currently in concept planning phase...

Image
The State Government has started a detailed planning study to determine the best solution for the nine kilometre section of South Road between the South Road Superway currently under construction and completed Gallipoli Underpass.
This planning study work began in February 2011 and is expected to take two years to complete. When completed, the study will release a Project Assessment Report identifying a preferred option for a free flowing corridor from the north of Anzac Highway to Regency Park. The study will enable the State Government to make a submission for grants funding to the Australian Government, as South Road is part of the National Land Transport Network, and for consideration by Infrastructure Australia.
Community feedback is vital to the planning study. A range of issues need to be considered and information will be collected from the businesses, residents and communities that use this section of South Road. Community feedback will inform development of concepts for the efficient movement of people and goods during construction of the corridor and when this upgraded section of South Road is completed.
Consultation activities for community and stakeholder involvement will include:
individual interviews and meetings with key stakeholder groups
council briefings
website information, including feedback options
production and wide distribution of information about the study and seeking registrations of interest
localised media

Information gathered from the community, local council and stakeholders through consultation activities will help the project team understand the key issues and inform the Project Assessment Report.
Media Release
Contract builds momentum toward visionary South Road
Contact us
As the study progresses, there will be regular updates on the project and opportunities for you to provide feedback.
If you would like more information, or would like to speak to someone on the project team, please call 1300 794 899 or email [email protected]

So i'm wondering what are the likely solutions to this section? I have a close relative who lives along that section (a couple of house blocks back) and am a bit concerned about the impact.
For my part, i'm thinking the best solution would be to extend the elevated road as this would allow the ground level road to function as per normal when completed as local traffic still needs to access these suburbs. This should minimize the amount of widening necessary as well as impact on the existing buildings along that stretch of road. Also this elevated section should include some sort of sound wall shell to minimize traffic noise.

What are your thoughts? What solutions have already been proposed?

crawf
Donating Member
Donating Member
Posts: 5527
Joined: Thu Feb 16, 2006 7:49 pm
Location: Adelaide

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1240 Post by crawf » Wed Apr 18, 2012 2:42 pm

mutt wrote:hi, i've been paying close attention to the south road upgrade/construction

i'm seeing after the elevated section is completed, the next phase is the northern connector, (federal government funding permitting)...and then the section between regency road and anzac highway will be looked at.

i understand this is currently in concept planning phase...

Image
The State Government has started a detailed planning study to determine the best solution for the nine kilometre section of South Road between the South Road Superway currently under construction and completed Gallipoli Underpass.
This planning study work began in February 2011 and is expected to take two years to complete. When completed, the study will release a Project Assessment Report identifying a preferred option for a free flowing corridor from the north of Anzac Highway to Regency Park. The study will enable the State Government to make a submission for grants funding to the Australian Government, as South Road is part of the National Land Transport Network, and for consideration by Infrastructure Australia.
Community feedback is vital to the planning study. A range of issues need to be considered and information will be collected from the businesses, residents and communities that use this section of South Road. Community feedback will inform development of concepts for the efficient movement of people and goods during construction of the corridor and when this upgraded section of South Road is completed.
Consultation activities for community and stakeholder involvement will include:
individual interviews and meetings with key stakeholder groups
council briefings
website information, including feedback options
production and wide distribution of information about the study and seeking registrations of interest
localised media

Information gathered from the community, local council and stakeholders through consultation activities will help the project team understand the key issues and inform the Project Assessment Report.
Media Release
Contract builds momentum toward visionary South Road
Contact us
As the study progresses, there will be regular updates on the project and opportunities for you to provide feedback.
If you would like more information, or would like to speak to someone on the project team, please call 1300 794 899 or email [email protected]

So i'm wondering what are the likely solutions to this section? I have a close relative who lives along that section (a couple of house blocks back) and am a bit concerned about the impact.
For my part, i'm thinking the best solution would be to extend the elevated road as this would allow the ground level road to function as per normal when completed as local traffic still needs to access these suburbs. This should minimize the amount of widening necessary as well as impact on the existing buildings along that stretch of road. Also this elevated section should include some sort of sound wall shell to minimize traffic noise.

What are your thoughts? What solutions have already been proposed?
Tunnel it :)

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6380
Joined: Sat Nov 11, 2006 12:14 pm

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1241 Post by rev » Wed Apr 18, 2012 2:50 pm

I think what we are most likely to get is more underpasses. The elevated bit they are building now is for freight transport. It is being built in Regency Park/Wingfield section of South Road because that areas is primarily industrial.
What they need to do is to limit access to South Road from side/back streets. Block them off.
The only access to South Road should be from other main roads, Torrens, Regency, etc.
I think that will go a long way to making it a proper non-stop north-south corridor.

mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1242 Post by mattblack » Wed Apr 18, 2012 3:21 pm

What about all the driveways?

Tunnel would be the best but im not sure if we have the money any time soon. Widening looks like the most likely option which in my books would be an awful outcome.

mutt
High Rise Poster!
Posts: 148
Joined: Tue Apr 17, 2012 7:46 pm

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1243 Post by mutt » Wed Apr 18, 2012 4:22 pm

mattblack wrote:What about all the driveways?

Tunnel would be the best but im not sure if we have the money any time soon. Widening looks like the most likely option which in my books would be an awful outcome.
exactly all the driveways...hence widening is not a solution and nor are underpasses if it is to become an expressway grade arterial road

tunnels and/or elevated is the only solution if that is that outcome otherwise it'll just be a main road at 60km with no stop lights/intersections...which would be a disaster for anyone trying to get onto the road

tunnels would probably be too expensive as i'd imagine elevated roads are cheaper

User avatar
rhino
Super Size Scraper Poster!
Posts: 3090
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1244 Post by rhino » Wed Apr 18, 2012 4:37 pm

mutt wrote: otherwise it'll just be a main road at 60km with no stop lights/intersections...which would be a disaster for anyone trying to get onto the road
Can't say i agree with this. A 60km/h non-stop route would not be a disaster at all. On the contrary, it would allow travel from Bedford Park to Regency Road in approx 17 minutes, which, in my view, is quite acceptable, while still allowing organic growth along the route, without the downsides that freeway slashes bring to suburbs - apart from dividing suburbs (wrong side of the tracks mentality) they are ugly, loud, take up heaps of space, and that 17-minute trip will be reduced by only 8 minutes (at 110km/h), and that's only if you do the whole trip! If you're going from the southern suburbs to the city, it will only save 4 minutes! And look at what the inner western suburbs have to put up with for that 4 minutes! Totally not worth it if you can have a 60km'h non-stop road instead.
cheers,
Rhino

mutt
High Rise Poster!
Posts: 148
Joined: Tue Apr 17, 2012 7:46 pm

[COM] Re: South Rd Upgrades - News & construction ONLY | U/C: Supe

#1245 Post by mutt » Wed Apr 18, 2012 4:43 pm

rhino wrote:
mutt wrote: otherwise it'll just be a main road at 60km with no stop lights/intersections...which would be a disaster for anyone trying to get onto the road
Can't say i agree with this. A 60km/h non-stop route would not be a disaster at all. On the contrary, it would allow travel from Bedford Park to Regency Road in approx 17 minutes, which, in my view, is quite acceptable, while still allowing organic growth along the route, without the downsides that freeway slashes bring to suburbs - apart from dividing suburbs (wrong side of the tracks mentality) they are ugly, loud, take up heaps of space, and that 17-minute trip will be reduced by only 8 minutes (at 110km/h), and that's only if you do the whole trip! If you're going from the southern suburbs to the city, it will only save 4 minutes! And look at what the inner western suburbs have to put up with for that 4 minutes! Totally not worth it if you can have a 60km'h non-stop road instead.
you forget about all the houses and businesses with driveways onto this road. if there is steady traffic running along it constantly with no lights you'll almost never be able to back onto this road

Post Reply

Who is online

Users browsing this forum: Bing [Bot] and 2 guests