COM: Seaford Rail Extension | $291m | 5.5km
- 85trainfan
- High Rise Poster!
- Posts: 107
- Joined: Sat Feb 06, 2010 9:26 pm
Re: #UC: Noarlunga - Seaford rail extension
A family member is working on the project and their contact runs out in 2014, so I'm assuming it was scheduled for 2013, but with extra time allowed in the contracts and this is now happening.
Next time i see him or speak with a project manager i shall ask.
Next time i see him or speak with a project manager i shall ask.
Regards Jarrod
Any posts made are my own opinion and do not represent any organisation with which I am associated.
Any posts made are my own opinion and do not represent any organisation with which I am associated.
Re: #UC: Noarlunga - Seaford rail extension
Aldinga rail line delay announced in State Budget
by: Lia Harris - Messenger Community News
From: AdelaideNow May 31, 2012 3:12PM
ALDINGA residents will have to wait at least another two years for work to start on the promised train line to their suburb.
Treasurer Jack Snelling today announced a halt to plans to start buying land to link Aldinga to the Noarlunga line.
The delay will save the government $12.9 million in 2012/13.
The plan to extend the rail line was first announced in the 2008/9 budget.
At the time, about $34 million was set aside to buy land.
Today's decision is the second time the project has been delayed.
The government will still press ahead with plans to release 100ha of land at Aldinga for more housing this year.
Onkaparinga Council had previously said more houses should not be built until the train line extension was complete.
Plans to extend the Noarlunga line from Seaford to Aldinga are part of the government's 30 Year Plan.
Meanwhile, $135.8 million will be spent on the electrification of the Noarlunga line in 2012/13.
Work on the project is expected to be finished by late next year.
Re: #UC: Noarlunga - Seaford rail extension
so Noarlunga line still gets electrification under the new state budget?
Re: #UC: Noarlunga - Seaford rail extension
Adelaide to Seaford will be electrified, and all other lines will remain diesel-operated for the time being.mutt wrote:so Noarlunga line still gets electrification under the new state budget?
Re: #UC: Noarlunga - Seaford rail extension
that's fine, this is the only line I care about!Alyx wrote:Adelaide to Seaford will be electrified, and all other lines will remain diesel-operated for the time being.mutt wrote:so Noarlunga line still gets electrification under the new state budget?
- SouthAussie94
- Legendary Member!
- Posts: 583
- Joined: Tue Mar 27, 2012 10:03 pm
- Location: Southern Suburbs
Re: #UC: Noarlunga - Seaford rail extension
What will they call the line once the Seaford extension is complete? Will it still be called the Noarlunga line or will the name be changed to the Seaford line?
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
-
- Super Size Scraper Poster!
- Posts: 2140
- Joined: Fri Dec 08, 2006 3:10 am
- Location: Christies Beach
#UC: Noarlunga - Seaford rail extension
The Seaford Line. Generally the lines are referred to by their destination.SouthAussie94 wrote:What will they call the line once the Seaford extension is complete? Will it still be called the Noarlunga line or will the name be changed to the Seaford line?
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.
- 85trainfan
- High Rise Poster!
- Posts: 107
- Joined: Sat Feb 06, 2010 9:26 pm
Re: #UC: Noarlunga - Seaford rail extension
Regards Jarrod
Any posts made are my own opinion and do not represent any organisation with which I am associated.
Any posts made are my own opinion and do not represent any organisation with which I am associated.
- 85trainfan
- High Rise Poster!
- Posts: 107
- Joined: Sat Feb 06, 2010 9:26 pm
Re: #UC: Noarlunga - Seaford rail extension
Hi All
A bit more detailed update today.
No more work has progressed between Noarlunga Centre and the Onkaparinga rail bridge, With all the Overhead support poles in place in this section. 2 sets of insulated joints sit in the middle of each line awaiting installation just south of the Platforms.
The Southern Deck of the Onkaparinga Rail Bridge is just one span short of the meeting point, while the Northern Deck is still 3 spans away. Permanent Hand/guard rails have been installed on approximately half the Southern Deck (didn't have a closer look at the northern deck)
The Seaford Meadows Maintenance Centre, has the Northern Rail gates installed now, with all the lights and Security cameras installed. The main Maintenance building has Sliding doors now over the Eastern Track, while the Western track just had the door frames up. The doors have a small cut out to allow the overhead contact wire to pass through. Workers today were working on the Train wash?? (or cleaning bay).
Seaford Meadows Station now looks a bit futuristic, with the overhead walkway frame in place, and work starting on the ramps and lifts. Workers were continuing with concreting the Down platform, with half the Up platform now in place. Both Platforms have a small section of shelter installed, surprisingly almost under the overhead walkway. The "excel" loo is onsite too , just awaiting installation. The Northern car park of the Park "N" Ride now has lights (which are incredibly tall). With the Southern section still being used as a work depot by the wall shoring contractors.
The Seaford Rd bridge, now has the Southern section complete, and bitumen laid on the approaches to bring it level. Shouldn't be too long before the road is shifted onto its final alignment.
The cutting between Seaford Rd and lynton Tce now has drainage contractors working in it close to Seaford Station, while the wall shoring contractors work on the retaining walls further along.
Seaford Station, has the Platform area completely dug out now, with the piles for the Platforms now visible. Over the last few days, The frames for the Overhead walkway have been delivered. 3 parts are now onsite (saw a convoy headed south yesterday with the 2nd piece, while the 3rd arrived today). Workers were starting to place temporary floors inside these structures.
No more work appears to taken place on the Park "N" ride car-park.
A bit more detailed update today.
No more work has progressed between Noarlunga Centre and the Onkaparinga rail bridge, With all the Overhead support poles in place in this section. 2 sets of insulated joints sit in the middle of each line awaiting installation just south of the Platforms.
The Southern Deck of the Onkaparinga Rail Bridge is just one span short of the meeting point, while the Northern Deck is still 3 spans away. Permanent Hand/guard rails have been installed on approximately half the Southern Deck (didn't have a closer look at the northern deck)
The Seaford Meadows Maintenance Centre, has the Northern Rail gates installed now, with all the lights and Security cameras installed. The main Maintenance building has Sliding doors now over the Eastern Track, while the Western track just had the door frames up. The doors have a small cut out to allow the overhead contact wire to pass through. Workers today were working on the Train wash?? (or cleaning bay).
Seaford Meadows Station now looks a bit futuristic, with the overhead walkway frame in place, and work starting on the ramps and lifts. Workers were continuing with concreting the Down platform, with half the Up platform now in place. Both Platforms have a small section of shelter installed, surprisingly almost under the overhead walkway. The "excel" loo is onsite too , just awaiting installation. The Northern car park of the Park "N" Ride now has lights (which are incredibly tall). With the Southern section still being used as a work depot by the wall shoring contractors.
The Seaford Rd bridge, now has the Southern section complete, and bitumen laid on the approaches to bring it level. Shouldn't be too long before the road is shifted onto its final alignment.
The cutting between Seaford Rd and lynton Tce now has drainage contractors working in it close to Seaford Station, while the wall shoring contractors work on the retaining walls further along.
Seaford Station, has the Platform area completely dug out now, with the piles for the Platforms now visible. Over the last few days, The frames for the Overhead walkway have been delivered. 3 parts are now onsite (saw a convoy headed south yesterday with the 2nd piece, while the 3rd arrived today). Workers were starting to place temporary floors inside these structures.
No more work appears to taken place on the Park "N" ride car-park.
Regards Jarrod
Any posts made are my own opinion and do not represent any organisation with which I am associated.
Any posts made are my own opinion and do not represent any organisation with which I am associated.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2744
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
Re: #UC: Noarlunga - Seaford rail extension
Awesome stuff! Good to see the project moving along nicely. Thanks for the update.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
Re: #UC: Noarlunga - Seaford rail extension
Good post 85trainfan (Shane?). Thanks for the info and pics.
cheers,
Rhino
Rhino
Re: #UC: Noarlunga - Seaford rail extension
Realise the Seaford to Aldinga rail extension has been deferred, but was a route map & station location ever published? just interested...
Opportunity is missed by most people because it is dressed in overalls and looks like work.
#UC: Noarlunga - Seaford rail extension
It wasn't for the construction of the rail line, rather just buying land that was deferred.
Re: #UC: Noarlunga - Seaford rail extension
Pretty sure they will be deferring construction of the rail line, in that case. They usually buy the land before construction.
cheers,
Rhino
Rhino
Re: #UC: Noarlunga - Seaford rail extension
As far as I'm aware, the only land that the State Govt actually owns is the reserve that is clearly visible in Seaford itself. There is no corridor (yet) from Seaford to Aldinga.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.