COM: McLaren Vale Overpass | $18m
-
- Legendary Member!
- Posts: 522
- Joined: Sun Aug 26, 2012 10:54 am
- Location: Morphett Vale
Re: U/C: McLaren Vale Overpass | $18m
The overpass is open now! Went over it not before. Left turn into mclaren vale is now closed for earth works, and southbound access is via Martins road and onto the overpass. Northbound is similar, using Martins then the overpasses. Both ways out of Mclaren Vale are to final design plan.
Looking forward to a free-flowing Adelaide!
Re: U/C: McLaren Vale Overpass | $18m
neoballmon wrote:
It was good to see the traffic crossing via the overpass when I went through about 0730 this morning Decent length merging lanes help.The overpass is open now!
- HeapsGood
- High Rise Poster!
- Posts: 266
- Joined: Mon May 10, 2010 10:54 am
- Location: At the Adelaide Airport thankfully now not having to use a Dyson Airblade
Re: U/C: McLaren Vale Overpass | $18m
I see from that video they said the overpass was built in mind with future duplication of the road to take place. Anyone got pics of the whole span over the road?
*Looks at Dyson Airblade Factory* "I say we take off and nuke the entire site from orbit, it's the only way to be sure"
- HeapsGood
- High Rise Poster!
- Posts: 266
- Joined: Mon May 10, 2010 10:54 am
- Location: At the Adelaide Airport thankfully now not having to use a Dyson Airblade
Re: U/C: McLaren Vale Overpass | $18m
Looks great, thanks
*Looks at Dyson Airblade Factory* "I say we take off and nuke the entire site from orbit, it's the only way to be sure"
Re: U/C: McLaren Vale Overpass | $18m
I see the 80km/h speed limit has been reinstated, bollards gone, painted median strips added and signage updated. The left turn into McLaren Vale has been upgraded. I guess roadworks essentially complete apart from some landscaping...
-
- Legendary Member!
- Posts: 522
- Joined: Sun Aug 26, 2012 10:54 am
- Location: Morphett Vale
Re: U/C: McLaren Vale Overpass | $18m
Yes, it does look almost complete, but I would assume that from the bottom of the hill to Martins Road, they will be installing a wire barrier down the center of the road. It's wide enough to fit it in. I would say they've just made it 80km/h again for the Xmas break while workers are off, to provide less inconvenience to the many tourists heading to the Victor Harbor Region.
Looking forward to a free-flowing Adelaide!
Re: U/C: McLaren Vale Overpass | $18m
Another project finished ahead of time and within budget - that's 2 in 2 weeks - well done to all involved!
cheers,
Rhino
Rhino
Who is online
Users browsing this forum: Ahrefs [Bot], Norman and 5 guests