[COM] Adelaide Convention Centre - Stage 3 | $350m
-
- Gold-Member ;)
- Posts: 51
- Joined: Fri Feb 18, 2011 10:31 pm
[COM] Re: U/C: Adelaide Convention Centre | $350m
Is it $350 million for this building alone or does that amount also include the other expansion destined further toward King William?
[COM] Re: U/C: Adelaide Convention Centre | $350m
Three fiddy mill for da whole lot.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
-
- Legendary Member!
- Posts: 522
- Joined: Thu Oct 30, 2008 9:32 pm
[COM] Re: U/C: Adelaide Convention Centre | $350m
Damn Loch Ness Monster! Get away from my family![Shuz] wrote:Three fiddy mill for da whole lot.
- monotonehell
- VIP Member
- Posts: 5466
- Joined: Fri Feb 01, 2008 12:10 am
- Location: Adelaide, East End.
- Contact:
[COM] Re: U/C: Adelaide Convention Centre | $350m
I knew what you meant, even if no one else noticed.peas_and_corn wrote:Damn Loch Ness Monster! Get away from my family![Shuz] wrote:Three fiddy mill for da whole lot.
Exit on the right in the direction of travel.
[COM] Re: U/C: Adelaide Convention Centre | $350m
south parkmonotonehell wrote:I knew what you meant, even if no one else noticed.peas_and_corn wrote:Damn Loch Ness Monster! Get away from my family![Shuz] wrote:Three fiddy mill for da whole lot.
Code: Select all
Signature removed
-
- High Rise Poster!
- Posts: 240
- Joined: Thu Sep 24, 2009 5:13 pm
[COM] Re: U/C: Adelaide Convention Centre | $350m
Why had it taken almost a year to do virtually nothing?
[COM] Re: U/C: Adelaide Convention Centre | $350m
Exactly.Tonsley213 wrote:Why had it taken almost a year to do virtually nothing?
[COM] Re: U/C: Adelaide Convention Centre | $350m
Tonsley213 wrote:Why had it taken almost a year to do virtually nothing?
[COM] Re: U/C: Adelaide Convention Centre | $350m
try building over a railway line
assume will speed up now the station is closed -- not sure if its has been a year anyway.
this will defiiely be ready well before the general election next year
assume will speed up now the station is closed -- not sure if its has been a year anyway.
this will defiiely be ready well before the general election next year
-
- High Rise Poster!
- Posts: 240
- Joined: Thu Sep 24, 2009 5:13 pm
[COM] Re: U/C: Adelaide Convention Centre | $350m
They already reduced the amount of trains going into the station so they could build the CC. And out of the 10 of construction. Very little of the work that required to reduced trains was completed, or if it was only the supporting concrete structures that are in between some of the tracks, then they could have returned the trains back to full service around August.
-
- Sen-Rookie-Sational
- Posts: 33
- Joined: Thu Aug 25, 2005 7:25 pm
- Location: Adelaide
[COM] Re: U/C: Adelaide Convention Centre | $350m
It's always a good laugh to read some of the stuff on here..
[COM] Re: U/C: Adelaide Convention Centre | $350m
Hey guys, long time lurker here, finally decided to create a Forum Account and actually post on something. Awesome forums btw, just had to throw that out there.
I have to ask, does anyone know why these metal beams are being placed around the railroads on the western side of the Morphett St bridge (visible in Xaragmata's pic below)? Are they there for future developments to be built over the western side of the bridge, or are they there purely for the usage of Adelaide Metro/Adelaide Railway Station?
I have to ask, does anyone know why these metal beams are being placed around the railroads on the western side of the Morphett St bridge (visible in Xaragmata's pic below)? Are they there for future developments to be built over the western side of the bridge, or are they there purely for the usage of Adelaide Metro/Adelaide Railway Station?
Whilst I'm on the topic, does anyone know if the plans to actually build over the western side of the Morphett St bridge (pictured below) are anything more than plans or are just the pipe-dream of a designer who decided it would look nice?Xaragmata wrote:
"Mono, you're a knob. <3"
- Port Adelaide Fan
- High Rise Poster!
- Posts: 387
- Joined: Wed May 30, 2007 1:46 pm
- Contact:
[COM] Re: U/C: Adelaide Convention Centre | $350m
It is for Electrification of the Adelaide Rail Network.Phantom wrote:I have to ask, does anyone know why these metal beams are being placed around the railroads on the western side of the Morphett St bridge (visible in Xaragmata's pic below)? Are they there for future developments to be built over the western side of the bridge, or are they there purely for the usage of Adelaide Metro/Adelaide Railway Station?
http://www.sensational-adelaide.com/for ... f=9&t=1327
Who is online
Users browsing this forum: No registered users and 8 guests