Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2026 Post by Tonsley213 » Fri Jun 28, 2013 6:57 pm

The article loses all credibility in the title.

Extension joints???? Shouldn't that be Expansion Joints?

Clearly the writer has no idea what they are talking about.

Brazer
Sen-Rookie-Sational
Posts: 40
Joined: Thu May 09, 2013 10:00 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2027 Post by Brazer » Sat Jun 29, 2013 11:32 am

Are we supposed to have the delivery of the trains by now??? it is now late June...


Calling all train buffs... I can't wait to see pics! :D

User avatar
Norman
Donating Member
Donating Member
Posts: 6488
Joined: Sun Mar 25, 2007 1:06 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2028 Post by Norman » Sat Jun 29, 2013 11:45 am

Just as a side note, the minister has advised that the electification of the Seaford line is scheduled to be completed in February 2014. Whether that means that electric trains will start running then I have no idea.

Archer
High Rise Poster!
Posts: 152
Joined: Mon Jun 09, 2008 11:44 am

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2029 Post by Archer » Sat Jun 29, 2013 6:43 pm

Norman wrote:Just as a side note, the minister has advised that the electification of the Seaford line is scheduled to be completed in February 2014. Whether that means that electric trains will start running then I have no idea.
I'm fairly sure that one of the recent video's posted on Youtube by DPTI mentioned the first Electric trains are now expected in July. Judge for yourself the accuracy of that source. :D

User avatar
SRW
Donating Member
Donating Member
Posts: 3650
Joined: Fri Jun 08, 2007 9:42 pm
Location: Glenelg

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2030 Post by SRW » Sun Jun 30, 2013 12:30 am

Shahkar wrote:
"...obviously, the bridge goes through a commissioning stage and that commissioning stage has found some things to be remedied,'' he said in answer to questions by Opposition transport spokeswoman Vickie Chapman.

"As part of the contract the contractor is completing them and remedying the problems and delivering it to the Government in an acceptable state.''
Right. Nothing to see here, folks.
Keep Adelaide Weird


User avatar
Xaragmata
Super Size Scraper Poster!
Posts: 1613
Joined: Thu Jul 19, 2007 2:08 pm
Location: Adelaide / West
Contact:

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2032 Post by Xaragmata » Sun Jul 07, 2013 12:59 am

Pics of Keswick / Wayville, Monday:

Image

Image

Image

Image

User avatar
[Shuz]
Super Size Scraper Poster!
Posts: 3290
Joined: Sun Apr 10, 2011 5:26 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2033 Post by [Shuz] » Sun Jul 07, 2013 11:47 am

Thanks for the photos Mr. X.

The whole thing is progressing at a very fast rate now, obviously to ready the tracks for Belair in a few days time, and Seaford in only a few weeks time.

I do wonder if the new Wayville Station has been designed to accommodate for a fourth platform where the ARTC line is, if ever, in the future the freight line is re-routed on the other side of the Mount Lofty Ranges / Adelaide Hills to the north, and the existing track becomes the duplicated Belair line.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.

Dazzeland
High Rise Poster!
Posts: 106
Joined: Sat Dec 22, 2012 4:04 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2034 Post by Dazzeland » Sun Jul 07, 2013 12:37 pm

[Shuz] wrote:Thanks for the photos Mr. X.

The whole thing is progressing at a very fast rate now, obviously to ready the tracks for Belair in a few days time, and Seaford in only a few weeks time.

I do wonder if the new Wayville Station has been designed to accommodate for a fourth platform where the ARTC line is, if ever, in the future the freight line is re-routed on the other side of the Mount Lofty Ranges / Adelaide Hills to the north, and the existing track becomes the duplicated Belair line.
It would be easy to convert the Belair line to Standard Gauge, as in a few years time it will be the only non electrified line on our network meaning we can convert all of the diesel rail cars to standard gauge without having to worry about the other lines. It could also leave the door open for new intra and inter state rail services to Mt Barker, Murray Bridge, Melbourne etc.

bay transit
High Rise Poster!
Posts: 139
Joined: Wed Oct 17, 2007 8:30 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2035 Post by bay transit » Fri Jul 12, 2013 8:17 pm

Reopening of Belair Rail Line has been delayed due to signalling issues.Announced by Head of PTS Emma Thomas on Adelaide Metro website.
Substitute bus services will continue until the problem is fixed.
When train services are resumed,the substitute bus services will continue for 48 hours as well.

User avatar
Port Adelaide Fan
High Rise Poster!
Posts: 387
Joined: Wed May 30, 2007 1:46 pm
Contact:

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2036 Post by Port Adelaide Fan » Sat Jul 13, 2013 10:12 pm

Belair Line Re-opening Delayed
The resumption of rail services on the Belair line scheduled for this Sunday 14 July will be delayed due to a signalling issue.
http://www.adelaidemetro.com.au/Announc ... ng-Delayed

Shahkar
High Rise Poster!
Posts: 380
Joined: Wed Dec 26, 2012 2:22 am
Location: Adelaide CBD

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2037 Post by Shahkar » Sun Jul 14, 2013 11:43 pm

First of 22 Bombardier electric trains to arrive in Adelaide this week

Image

THE first of 22 new electric trains will arrive in Adelaide this week ahead of electrified services starting on the Seaford line next year.

The Bombardier A-City 4000 train will make the journey from the company's Dandenong factory to Adelaide by road and is expected to arrive on Friday. It will be the state's first new passenger train in about 20 years.

Once here, it will be commissioned and made ready for track and driver testing over coming months.

The first electric services are expected to run on the Seaford line early next year.

Transport and Infrastructure Minister Tom Koutsantonis said the train's arrival was a landmark occasion.

"I am excited and I hope that the commuters who have patiently endured substitute bus services since January will be just as excited when they see the first of the A-City rail cars being track-tested during the next few months," he said.

The three-car trains will seat about 240 passengers and have standing room for up to 300 more.

Features of the trains include CCTV cameras front, back and inside, high capacity airconditioning, and a maximum speed of 110km/h.

Brucetiki
Legendary Member!
Posts: 995
Joined: Tue Apr 17, 2012 6:20 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2038 Post by Brucetiki » Mon Jul 15, 2013 12:51 pm

And the whiners are out in force about the trains - they'll be overcrowded, why aren't the bigger (obviously never heard of coupling :roll: ), they weren't built in Adelaide, they'll be vandalised, they're going to sit and collect rust until next year (obviously didn't read the part about testing).

Some people need to engage their brain before writing crap like that.

User avatar
Nathan
Super Size Scraper Poster!
Posts: 3816
Joined: Tue Feb 03, 2009 1:09 pm
Location: Bowden
Contact:

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2039 Post by Nathan » Mon Jul 15, 2013 12:58 pm

Brucetiki wrote:And the whiners are out in force about the trains - they'll be overcrowded, why aren't the bigger (obviously never heard of coupling :roll: ), they weren't built in Adelaide, they'll be vandalised, they're going to sit and collect rust until next year (obviously didn't read the part about testing).

Some people need to engage their brain before writing crap like that.
I liked the comments about power outages and that they should have solar panels on the top :sly:

User avatar
metro
Legendary Member!
Posts: 970
Joined: Mon Sep 21, 2009 10:11 pm
Location: Sydney

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2040 Post by metro » Mon Jul 15, 2013 1:19 pm

Good to see the first new train will be arriving soon!

and the Belair line is still not open. How is it that in 7 months with no trains and stuff-all track work that they are having signalling issues when they had all that time? :roll: