News & Discussion: Adelaide Metro Trains

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
Waewick
Super Size Scraper Poster!
Posts: 3774
Joined: Tue Jun 10, 2008 1:39 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2626 Post by Waewick » Mon Jun 08, 2015 9:49 pm

Norman wrote:In peak hours there are trains that only stop at Gawler, Smithfield, Elizabeth, Salisbury and Mawson Lakes.
really, I would have thought there would be an express of sorts - whats the time like? the internet suggests a bit over an hr ?

PD2/20
High Rise Poster!
Posts: 388
Joined: Sun Feb 23, 2014 2:32 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2627 Post by PD2/20 » Mon Jun 08, 2015 10:16 pm

Waewick wrote:
Norman wrote:In peak hours there are trains that only stop at Gawler, Smithfield, Elizabeth, Salisbury and Mawson Lakes.
really, I would have thought there would be an express of sorts - whats the time like? the internet suggests a bit over an hr ?
44 min from Gawler, 48 from Gawler Cen.

Waewick
Super Size Scraper Poster!
Posts: 3774
Joined: Tue Jun 10, 2008 1:39 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2628 Post by Waewick » Mon Jun 08, 2015 10:38 pm

PD2/20 wrote:
Waewick wrote:
Norman wrote:In peak hours there are trains that only stop at Gawler, Smithfield, Elizabeth, Salisbury and Mawson Lakes.
really, I would have thought there would be an express of sorts - whats the time like? the internet suggests a bit over an hr ?
44 min from Gawler, 48 from Gawler Cen.
That's not too bad so about 1/2 hr quicker than car.

Sorry for all the questions but would electrification have sped that up?

User avatar
Norman
Donating Member
Donating Member
Posts: 6488
Joined: Sun Mar 25, 2007 1:06 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2629 Post by Norman » Mon Jun 08, 2015 11:26 pm

Yes, there was an estimate of 5-7 minute time saving after electrification, but that could apply only to the all stoppers.

Eurostar
Legendary Member!
Posts: 952
Joined: Thu Jun 24, 2010 3:44 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2630 Post by Eurostar » Sat Jun 13, 2015 1:11 pm

now that the Electric train sets are nearly all here is there plans to finish the roofs at Hallett Cove?

User avatar
[Shuz]
Super Size Scraper Poster!
Posts: 3290
Joined: Sun Apr 10, 2011 5:26 pm

Re: News & Discussion: Trains

#2631 Post by [Shuz] » Wed Jul 08, 2015 8:48 am

Looks like Adelaide Metro is getting a bit slack with graffiti removal on the trains? Quite a number of them are tagged.

Is this a consequence of the recent workers strike and industrial action? Do these workers literally cease doing maintenance work and whinge about pay and conditions whilst not fulfilling the basic tenets of their job descriptions? How is this not grounds for dismissal?
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.

User avatar
Llessur2002
Super Size Scraper Poster!
Posts: 2131
Joined: Mon Mar 17, 2014 4:59 pm
Location: Inner West

Re: News & Discussion: Trains

#2632 Post by Llessur2002 » Wed Jul 08, 2015 9:10 am

I definitely read something about the workers refusing to clean or report graffiti as part of their industrial action.

But I don't know enough about their pay and conditions to comment on whether I support their actions or not...

Will
VIP Member
VIP Member
Posts: 5860
Joined: Fri Sep 16, 2005 6:48 pm
Location: Adelaide

Re: News & Discussion: Trains

#2633 Post by Will » Wed Jul 08, 2015 3:28 pm

[Shuz] wrote:Looks like Adelaide Metro is getting a bit slack with graffiti removal on the trains? Quite a number of them are tagged.

Is this a consequence of the recent workers strike and industrial action? Do these workers literally cease doing maintenance work and whinge about pay and conditions whilst not fulfilling the basic tenets of their job descriptions? How is this not grounds for dismissal?
Workers have a right to engage in industrial action, during which they obviously do not undertake their usual duties.

Waewick
Super Size Scraper Poster!
Posts: 3774
Joined: Tue Jun 10, 2008 1:39 pm

Re: News & Discussion: Trains

#2634 Post by Waewick » Wed Jul 08, 2015 3:54 pm

graffitti is one of my biggest bug bears.

hate it.

Patrick_27
Super Size Scraper Poster!
Posts: 2558
Joined: Tue Mar 05, 2013 4:41 pm
Location: Adelaide CBD, SA

Re: News & Discussion: Trains

#2635 Post by Patrick_27 » Wed Jul 08, 2015 5:20 pm

So Shuz, rather than have a crack at those who print the graffiti on the train, you instead stab the maintenance workers for not cleaning it up?

User avatar
[Shuz]
Super Size Scraper Poster!
Posts: 3290
Joined: Sun Apr 10, 2011 5:26 pm

Re: News & Discussion: Trains

#2636 Post by [Shuz] » Wed Jul 08, 2015 5:35 pm

That's correct.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.

User avatar
PeFe
Super Size Scraper Poster!
Posts: 1677
Joined: Mon Dec 07, 2009 9:47 am

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2637 Post by PeFe » Sun Jul 12, 2015 12:44 am

Please explain...what is unfinished about the roofs at the Hallet Cove railway stations? Last time I was out that way (March) the roof covered the entire platform, arching over any in station train if my memory is correct.

Westside
High Rise Poster!
Posts: 252
Joined: Tue May 12, 2009 4:30 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2638 Post by Westside » Mon Jul 13, 2015 12:28 pm

PeFe wrote:Please explain...what is unfinished about the roofs at the Hallet Cove railway stations? Last time I was out that way (March) the roof covered the entire platform, arching over any in station train if my memory is correct.
The original design was to have the roof cover from platform to platform (tracks included). This was purposely left off while Diesels still run along the line. The question is whether the original plan to completely cover the station will be done given the line is now electrified.

My feeling is not for a while as there is still a chance they may need to run diesels through the station, even if only in an emergency type situation.

User avatar
SouthAussie94
Legendary Member!
Posts: 583
Joined: Tue Mar 27, 2012 10:03 pm
Location: Southern Suburbs

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2639 Post by SouthAussie94 » Mon Jul 13, 2015 3:23 pm

Westside wrote:
PeFe wrote:Please explain...what is unfinished about the roofs at the Hallet Cove railway stations? Last time I was out that way (March) the roof covered the entire platform, arching over any in station train if my memory is correct.
The original design was to have the roof cover from platform to platform (tracks included). This was purposely left off while Diesels still run along the line. The question is whether the original plan to completely cover the station will be done given the line is now electrified.

My feeling is not for a while as there is still a chance they may need to run diesels through the station, even if only in an emergency type situation.
What real benefit is there to completely covering the station?

I used to catch the train from Hallet Cove Beach. When it rains a small portion of the platform gets wet due to water coming from above the tracks. I significantly larger amount comes in from the open sides of the platform. Unless the sides are also enclosed, the platforms will still get wet when it rains..
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"

Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6382
Joined: Sat Nov 11, 2006 12:14 pm

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

#2640 Post by rev » Mon Jul 13, 2015 4:42 pm

SouthAussie94 wrote:
Westside wrote:
PeFe wrote:Please explain...what is unfinished about the roofs at the Hallet Cove railway stations? Last time I was out that way (March) the roof covered the entire platform, arching over any in station train if my memory is correct.
The original design was to have the roof cover from platform to platform (tracks included). This was purposely left off while Diesels still run along the line. The question is whether the original plan to completely cover the station will be done given the line is now electrified.

My feeling is not for a while as there is still a chance they may need to run diesels through the station, even if only in an emergency type situation.
What real benefit is there to completely covering the station?

I used to catch the train from Hallet Cove Beach. When it rains a small portion of the platform gets wet due to water coming from above the tracks. I significantly larger amount comes in from the open sides of the platform. Unless the sides are also enclosed, the platforms will still get wet when it rains..
Does the rain always blow in sideways in your world?
This isn't a dig at you, but really can this state stop it's fucking whinging about every damn thing possible?
What's next, people are going to want outdoor heaters and air conditioning installed at train stations? How about couches and flat screen tvs with foxtel and chefs on hand to cook for people?

Post Reply

Who is online

Users browsing this forum: No registered users and 2 guests