#421 Post by Pikey » Tue Jul 21, 2015 8:07 am

Nice to see a return to numbered floors too.

Image
Walking on over....

| Sensational-Adelaide.com Moderator |

EBG
Super Size Scraper Poster!
Posts: 3106
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#422 Post by EBG » Sat Jul 25, 2015 11:17 pm

Picture of the ground floor from the rear.
Attachments
20150725_155 kw.jpg
20150725_155 kw.jpg (224.72 KiB) Viewed 5570 times

Ben
VIP Member
VIP Member
Posts: 7567
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#423 Post by Ben » Mon Jul 27, 2015 5:32 pm

This one is climbing fast now. Core rise every week. Up to 4 now.

EBG
Super Size Scraper Poster!
Posts: 3106
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#424 Post by EBG » Mon Aug 03, 2015 4:00 pm

2 floors are complete at the rear. This site is going to be hard to get good pictures at least until it rises above its neighbours. Pic Sunday 2/8/15
Attachments
20150802_115kw.jpg
20150802_115kw.jpg (191.45 KiB) Viewed 5213 times

Dvious
Legendary Member!
Posts: 641
Joined: Wed Aug 17, 2011 11:46 pm

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#425 Post by Dvious » Mon Aug 03, 2015 9:23 pm

You can see why the construction cost is so cheap! Barely anything going on structurally.

serca
High Rise Poster!
Posts: 335
Joined: Mon Sep 26, 2011 11:46 pm

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#426 Post by serca » Mon Aug 03, 2015 10:15 pm

It does seem to be taking longer than it should. Having said that this is the same Company building Vue and that is going gang busters, you could even say ahead of schedule. I own a building company and by no means do we do projects of this size but I know from experience the nature of a site, it's access and egress and project management of trades due to how awkward or small a site is can most certainly have implications on time frames and projects just don't move along as they should.

Ben
VIP Member
VIP Member
Posts: 7567
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#427 Post by Ben » Mon Aug 03, 2015 10:19 pm

I think it's moving along quite fast now. Core rose every 5 days and one floor per week too. Up to level 5 now.

User avatar
HeapsGood
High Rise Poster!
Posts: 266
Joined: Mon May 10, 2010 10:54 am
Location: At the Adelaide Airport thankfully now not having to use a Dyson Airblade

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#428 Post by HeapsGood » Thu Aug 06, 2015 4:04 pm

Fairly small site? is this going to be extended into the back lane or the Ambassador outdoor area by any chance?
*Looks at Dyson Airblade Factory* "I say we take off and nuke the entire site from orbit, it's the only way to be sure"

Will
VIP Member
VIP Member
Posts: 5860
Joined: Fri Sep 16, 2005 6:48 pm
Location: Adelaide

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#429 Post by Will » Thu Aug 06, 2015 7:36 pm

HeapsGood wrote:is this going to be extended into the back lane or the Ambassador outdoor area by any chance?
No.

User avatar
mshagg
Legendary Member!
Posts: 568
Joined: Sun Jan 23, 2011 10:50 pm

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#430 Post by mshagg » Thu Aug 06, 2015 7:37 pm

serca wrote:It does seem to be taking longer than it should. Having said that this is the same Company building Vue and that is going gang busters, you could even say ahead of schedule. I own a building company and by no means do we do projects of this size but I know from experience the nature of a site, it's access and egress and project management of trades due to how awkward or small a site is can most certainly have implications on time frames and projects just don't move along as they should.
It looks like a nightmare, turning trucks around and backing them into waymouth place with morning peak traffic shuffling its way down Waymouth St.

Smithy85
High Rise Poster!
Posts: 274
Joined: Mon Jan 26, 2015 11:31 am

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#431 Post by Smithy85 » Tue Aug 11, 2015 9:01 pm

Core up to level 6 now. There will also have to be a crane height rise very soon as the core cannot go up another level until this is done.

EBG
Super Size Scraper Poster!
Posts: 3106
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#432 Post by EBG » Wed Aug 12, 2015 10:27 pm

The lane (Hall Court) at the rear is not a dead end. It does a left hand turn (twice) and comes back out on to Waymouth Street. but this is suitable only for cars not trucks. The lane way is open to public cars on weekends, (well small cars at least). Check it on Google earth web site. Yes it is a very congested site and relies heavily on the "just in time " deliveries.

User avatar
Pikey
VIP Member
VIP Member
Posts: 2481
Joined: Wed Jul 13, 2005 7:41 am
Location: Sitting Down

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#433 Post by Pikey » Sat Aug 15, 2015 10:11 pm

As mentioned, core is up to level 6, the floor plates up to level four.

Image

Image

Image
Walking on over....

| Sensational-Adelaide.com Moderator |

Smithy85
High Rise Poster!
Posts: 274
Joined: Mon Jan 26, 2015 11:31 am

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#434 Post by Smithy85 » Mon Aug 24, 2015 8:53 pm

Core up to level 7 and the crane height was increased slightly over the weekend.

Ben
VIP Member
VIP Member
Posts: 7567
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

[COM] Re: 115 King William Street | 90m | 26lvls | Office

#435 Post by Ben » Tue Sep 01, 2015 5:17 pm

Another core rose today. Up to level 8. Will need a crane rise now before another one can happen.