COM: Glenelg Tramline Upgrade

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
User avatar
Will409
Legendary Member!
Posts: 1037
Joined: Sat Feb 17, 2007 7:12 am
Location: Parafield Gardens

Re: Glenelg Tram Line Upgrade

#751 Post by Will409 » Sat Jul 07, 2007 7:22 pm

I made another run to the city this afternoon. No new track has been laid yet in Victoria Square but because of the rain, this is probably to allow for the underbase to soldify. To summarised what has happened since the last update:

-Erection of the overhead masts has been just about completed with just one more to be currently put up in Victoria Square. King William Street is still awaiting the masts to be erected but they are delivered ready to go.
-The last intersection (King William Street - Angas/Gouger Streets) has now got overhead span wires installed. Since these are over the current 'live' overhead for the existing alingnment, the overhead wires do look very complex. This is an interim arrangement until the final link up.
-Brackets have also been installed on nearly all the overhead masts on North Terrace. When I there, only two more on North Terrace needed to be done and they are probably done by now.

Plenty of the photos in this update.

Image
Double brackets for the double track section.

Image
Single bracket arm near Morphett Street Bridge. Sorry for the slightly out of focus shot.

Image
Image
Image
City West. Other then the overhead, nothing has really happened here since early May.

Image
Double brackets before the wires to the pole are installed.

Image
Wires at the top of the mast.

Image
Image
Work equipment outside of Parliment House. From what I could tell, some median strip work was also being undertaken.

Image
Poles along the southern end of Victoria Square.

Image
The very southern end of the alignment looking north.

Image
Overhead wiring at the end of Victoria Square at present.
Image LINK TO YOUTUBE PROFILE.

User avatar
Shuz
Banned
Banned
Posts: 2538
Joined: Sat Jun 02, 2007 1:48 pm
Location: Glandore

Re: Glenelg Tram Line Upgrade

#752 Post by Shuz » Sat Jul 07, 2007 8:03 pm

I would hope amongst all this, that there are plans to redo the wiring and platforms down the southern end of KWS.

User avatar
Tom
High Rise Poster!
Posts: 126
Joined: Tue Aug 01, 2006 5:43 pm
Location: Adelaide

Re: Glenelg Tram Line Upgrade

#753 Post by Tom » Sun Jul 08, 2007 12:31 am

momentkiller wrote:I would hope amongst all this, that there are plans to redo the wiring and platforms down the southern end of KWS.
No there will be no upgrading of the Southern End of King William St. Upgrading the City South tram stop was looked at, but ruled out as lack of use.
South Tce. will receive a new siding for the "bline tram"
Garno!
Image

User avatar
rhino
Super Size Scraper Poster!
Posts: 3093
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

Re: Glenelg Tram Line Upgrade

#754 Post by rhino » Mon Jul 09, 2007 8:28 am

Tom wrote: No there will be no upgrading of the Southern End of King William St. Upgrading the City South tram stop was looked at, but ruled out as lack of use.
South Tce. will receive a new siding for the "bline tram"
Well, hopefully that will change. Part of the idea of this tramline is to get people back to the southern end of the city, so one would imagine that the "lack of use" excuse won't be valid for much longer. Having said that, if you want to increase activity in an area, you have to make it an attractive place to go to. The catenery over the southern end of KWS, and the lack of trees because of it, make the southern end of KWS look like the northern end's poor cousin who no-one wants to visit.
cheers,
Rhino

User avatar
jk1237
Donating Member
Donating Member
Posts: 1756
Joined: Wed Jan 17, 2007 11:22 pm
Location: Adelaide

Re: Glenelg Tram Line Upgrade

#755 Post by jk1237 » Wed Jul 11, 2007 8:09 pm

just noticed in todays paper, from Transport SA. They are starting the South Tce siding from Mon 16th jul, and you wont be able to park near the stop from Mon and have said that the Gouger St intersection will be done in early Aug. Would be good if they can do the final concreting along King Will St soon, those metal barriers are awful

User avatar
Will409
Legendary Member!
Posts: 1037
Joined: Sat Feb 17, 2007 7:12 am
Location: Parafield Gardens

Re: Glenelg Tram Line Upgrade

#756 Post by Will409 » Sat Jul 14, 2007 8:20 am

I have had a flip on the TransportSA website and found this.
TransportSA wrote: Temporary changes to traffic conditions on Peacock Road, Adelaide

Temporary changes to traffic conditions on Peacock Road, Adelaide will be implemented from Monday, 16 July 2007 to allow works associated with the tramline extension project to be undertaken adjacent to the existing tramline corridor.

The following temporary changes will take place:

The parking lane on the western side of Peacock Road will be unavailable (for approximately 175 metres south of South Terrace) until Monday, 6 August 2007.
To provide a safe alternative footpath during these works, pedestrians will be redirected to the car parking lane which will be delineated from traffic by barriers.
Tramline services, the bicycle lane and the two northbound traffic lanes along Peacock Road will not be affected by these works, which are expected to be complete by Monday, 6 August 2007.

For further details of the Peacock Road works, please download the traffic management plan

The Department for Transport, Energy and Infrastructure thanks city commuters, residents and businesses in the area for their patience during extension of the tramline.
TransportSA wrote: Further major construction works
Construction works for the tramline extension are progressing well, with works within the tramline corridor in Victoria Square, King William Street and North Terrace to continue over the coming weeks with minimal impact on pedestrians and motorists.

Following the track works adjacent to Peacock Road, the final stage of major works will involve major track laying across Angas / Gouger Streets and track modifications in the vicinity of South Terrace and Peacock Road over a weekend in early August 2007.

Further details of the next stage of major construction works will be provided shortly on this website.
http://www.transport.sa.gov.au/tramexte ... _4_Opt.pdf
Image LINK TO YOUTUBE PROFILE.

User avatar
Will409
Legendary Member!
Posts: 1037
Joined: Sat Feb 17, 2007 7:12 am
Location: Parafield Gardens

Re: Glenelg Tram Line Upgrade

#757 Post by Will409 » Sun Jul 15, 2007 11:22 am

Another day, another round of updates. More work on the verhead has continued along North Terrace. All the cross brackets are now inplace. The brackets at the eastern end of North Terrace (ie closest to King William Street) have already been tentioned with rope. That really does give you an idea of how it will all look not that long from now.

No progress has yet to be made at City West stop.

New conduits have been put in at the Pirie Street stop. Same at Rundle Mall.

Much work has been made at Victoria Square with the overhead coming very close to completion. Half of the masts have brackets installed and up while the other half have been installed but not put up. The stop at Victoria Square is also nearly completed. Filling has been put in with no pavers (yet). All conduits have been installed and are sticking out of the platform. The crossover at the southern end of the platform has also been installed.

I was told by one of the contractors that the southern half of Victoria Square will be operational and in regular use before the rest of the route is in early August when they make the 'cut and shut' to the new line. That is why progress is moving at a faster rate at the southern end. The rest of the line may very well be ready to use about 5 weeks afterwards.

Image
Image
Bracket arms tensioned on North Terrace. No wires but ropes at the moment.

Image
Conduits being laid at Pirie Street stop. Work was just starting at Rundle Mall stop at that time also.

Image
Victoria Square.

Image
Victoria Square stop well and truly underway.

Image
The old to the right, the new to the left.

Image
Newly laid crossover that had been concreted only that morning.

Image
Curve at the southern end of Victoria Square stop.

Image
Earth works underway at the northern end of the square.

Image
Railway Station stop underway.
Last edited by Will409 on Sun Jul 15, 2007 9:00 pm, edited 1 time in total.
Image LINK TO YOUTUBE PROFILE.

User avatar
AtD
VIP Member
VIP Member
Posts: 4579
Joined: Wed Jul 20, 2005 7:00 pm
Location: Sydney

Re: Glenelg Tram Line Upgrade

#758 Post by AtD » Sun Jul 15, 2007 11:54 am

Thanks 409. I noticed yesterday Traffic Control Systems were installing new signals on the Hindley Street intersection. Hindley Street now has left/right turning arrows, and diagonal crossing lines for the scramble.

Also spotted these on the North Tce/King William intersection:

Image

citywatcher
Legendary Member!
Posts: 870
Joined: Sun Jul 15, 2007 5:51 pm

Re: Glenelg Tram Line Upgrade

#759 Post by citywatcher » Sun Jul 15, 2007 5:56 pm

Any truth to the rumour that the reason none of those big brown poles not appearing along KW street as yet is becuase the workers have uncovered an old pipeline beneath the surface and the engineers don't know what to do about it?

User avatar
Will409
Legendary Member!
Posts: 1037
Joined: Sat Feb 17, 2007 7:12 am
Location: Parafield Gardens

Re: Glenelg Tram Line Upgrade

#760 Post by Will409 » Sun Jul 15, 2007 7:29 pm

On the very last day of April, that is exactly what they were doing. There was a water pipe that was underneath the median strip that had been made redundant by the extension. I have some photos of the work crew digging it up, just have a look back a few pages.
Image LINK TO YOUTUBE PROFILE.

Captain Howdy
Sen-Rookie-Sational
Posts: 38
Joined: Fri Nov 10, 2006 2:39 pm

Re: Glenelg Tram Line Upgrade

#761 Post by Captain Howdy » Fri Jul 20, 2007 12:20 am

yaaay! thanks for the pics guys can't wait till this is completed!!! will have to jet over to SA to see the final product soon!!!

User avatar
Norman
Donating Member
Donating Member
Posts: 6485
Joined: Sun Mar 25, 2007 1:06 pm

Re: Glenelg Tram Line Upgrade

#762 Post by Norman » Sat Jul 21, 2007 10:12 pm

Woah, nice work Will! I'm coming back into Adelaide tomorrow, looking forward to seeing the progress :)

BillD
High Rise Poster!
Posts: 210
Joined: Thu Mar 22, 2007 9:57 pm

Re: Glenelg Tram Line Upgrade

#763 Post by BillD » Sat Jul 21, 2007 11:10 pm

Here's Flexity 104 passing the new South Tce siding works and a shot of some nice new overhead which has been installed before the track.

Bill

Image

Image

User avatar
Norman
Donating Member
Donating Member
Posts: 6485
Joined: Sun Mar 25, 2007 1:06 pm

Re: Glenelg Tram Line Upgrade

#764 Post by Norman » Sun Jul 22, 2007 2:40 pm

In Berlin (where I was recently) they use an older model of the Flexity I think... check it out.
Attachments
P1010265.JPG
P1010265.JPG (136.25 KiB) Viewed 3764 times

User avatar
Will409
Legendary Member!
Posts: 1037
Joined: Sat Feb 17, 2007 7:12 am
Location: Parafield Gardens

Re: Glenelg Tram Line Upgrade

#765 Post by Will409 » Sun Jul 22, 2007 6:04 pm

I have some bad news for everyone here. I made a run to the city and also South Terrace to get photos of the extension as usual. Unfortunatly, the first 10 photos I got were of less then idea quality and the rest were 'blacked out' by the camera completely. After a total of nearly 8000 photos from the camera, it has packed up completely. Because of my almost non existant budget (caused by a trip to Melbourne later this year), I cannot get a new camera.

This means that my weekly update series will have to come to an end.
Image LINK TO YOUTUBE PROFILE.

Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest