[COM] Adelaide Convention Centre - Stage 3 | $350m

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
User avatar
Pikey
VIP Member
VIP Member
Posts: 2477
Joined: Wed Jul 13, 2005 7:41 am
Location: Sitting Down

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1321 Post by Pikey » Thu Feb 25, 2016 9:21 am

Will wrote:
EBG wrote:This is the crane that replaced the crawler crane on the river bank side of the project.
Does this qualify for the CBD crane count? Thoughts?
I would say no, its a self erecting crane that isn't fixed. I'd say only tower cranes should count in the tally.
Walking on over....

| Sensational-Adelaide.com Moderator |

crowdoc
Gold-Member ;)
Posts: 58
Joined: Sun Apr 14, 2013 4:17 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1322 Post by crowdoc » Wed Mar 02, 2016 8:37 pm

This has been looking like porn for structural engineers for a while. They have now started cladding with glass installed at the front of the lower level and a coating now being applied on the section between levels. It seems to have an adhesive paper coating the underlying material which has a yellow colour shows on the some edges.
Attachments
20160302_185548.jpg
20160302_185548.jpg (2.53 MiB) Viewed 4615 times

EBG
Super Size Scraper Poster!
Posts: 3096
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1323 Post by EBG » Thu Mar 10, 2016 10:30 pm

Here are some picture of the cladding and the glazing as at 10 Mar 2016. This building already looks infinitely better than stage 2 with its awkward angles.
Attachments
20160310_CC 1.jpg
20160310_CC 1.jpg (345.65 KiB) Viewed 4391 times
20160310_CC 2.jpg
20160310_CC 2.jpg (412.68 KiB) Viewed 4391 times

User avatar
Matt
Legendary Member!
Posts: 1125
Joined: Wed Feb 07, 2007 12:36 pm
Location: London

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1324 Post by Matt » Sat Mar 19, 2016 12:05 am

Would LOVE some updated pics of this one if someone is passing by and would be so kind as to oblige?

:)

Looks a hell of a lot bigger than I expected it to.

crowdoc
Gold-Member ;)
Posts: 58
Joined: Sun Apr 14, 2013 4:17 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1325 Post by crowdoc » Sat Mar 19, 2016 10:39 am

20160319_100716-1.jpg
19th March
20160319_100716-1.jpg (1.85 MiB) Viewed 4051 times

ml69
Legendary Member!
Posts: 1005
Joined: Mon Jan 03, 2011 11:16 pm
Location: Adelaide SA

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1326 Post by ml69 » Sat Mar 19, 2016 2:21 pm

Matt wrote:Would LOVE some updated pics of this one if someone is passing by and would be so kind as to oblige?

:)

Looks a hell of a lot bigger than I expected it to.
I drove over the Morphett St bridge yesterday, that's exactly what I thought.

Echoing what others have said, the wall and roof cladding will make or break this building. It could look fantastic or really awkward.

Honey of a City
High Rise Poster!
Posts: 265
Joined: Tue Oct 15, 2013 6:42 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1327 Post by Honey of a City » Sat Mar 19, 2016 3:50 pm

If the cladding's identical to the pictures on the fence near the site it should be awesome.

EBG
Super Size Scraper Poster!
Posts: 3096
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1328 Post by EBG » Sat Mar 19, 2016 9:42 pm

Here is a general picture of stage 3 and its surroundings as at 19 Mar 16.
Attachments
20160319_CC.jpg
20160319_CC.jpg (412.19 KiB) Viewed 3893 times

User avatar
ynotsfables
High Rise Poster!
Posts: 296
Joined: Tue Aug 14, 2007 11:15 am

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1329 Post by ynotsfables » Sun Mar 20, 2016 3:35 pm

Oh yeh this is going to look good, good shot too EBG compliments the bridge.

Patrick_27
Super Size Scraper Poster!
Posts: 2554
Joined: Tue Mar 05, 2013 4:41 pm
Location: Adelaide CBD, SA

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1330 Post by Patrick_27 » Mon Mar 21, 2016 1:10 am

I already prefer it to Stage 2, more glass means it relates better to the original (central) building.

User avatar
SRW
Donating Member
Donating Member
Posts: 3650
Joined: Fri Jun 08, 2007 9:42 pm
Location: Glenelg

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1331 Post by SRW » Mon Mar 21, 2016 10:30 am

It's meant to be clad with some sort of brown sheeting, yeah? It'll be interesting to see how that goes. Right now, the silver and glass is making it look pleasingly harmonious with the main convention building.
Keep Adelaide Weird

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2744
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1332 Post by ChillyPhilly » Wed Mar 23, 2016 11:17 pm

Image

Image
Our state, our city, our future.

All views expressed on this forum are my own.

EBG
Super Size Scraper Poster!
Posts: 3096
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1333 Post by EBG » Sun Apr 03, 2016 10:35 pm

A progress update as at Sat 2/4/2106. Cladding has been added to the eastern side (towards the festival centre). PS I hope all these new gum trees along the river banks don't get too big, (see also picture from 19 th Mar).
Attachments
20160402_CC2.jpg
20160402_CC2.jpg (354.18 KiB) Viewed 3152 times
20160402_CC1.jpg
20160402_CC1.jpg (333.32 KiB) Viewed 3152 times

EBG
Super Size Scraper Poster!
Posts: 3096
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1334 Post by EBG » Sun Apr 17, 2016 1:38 pm

Some more recent pictures of stage 3.Note the self erecting crane has gone.
picture 1 North-east corner.
picture 2 western side not as advanced as the east side.
picture 3 general view - almost every thing here has been built recently.
Attachments
20160416_cc 2.jpg
20160416_cc 2.jpg (313.87 KiB) Viewed 2877 times
20160416_cc 6.jpg
20160416_cc 6.jpg (319.61 KiB) Viewed 2877 times
20160416_cc8.jpg
20160416_cc8.jpg (382.99 KiB) Viewed 2877 times

User avatar
omada
Donating Member
Donating Member
Posts: 686
Joined: Mon Jul 16, 2007 10:03 am
Location: Eden Hills

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1335 Post by omada » Mon Apr 18, 2016 8:57 am

I wonder if it's deliberate, but this extension appears to reference the Festival Centre, look at the angular roof line.

Post Reply

Who is online

Users browsing this forum: Ahrefs [Bot] and 6 guests