I can hear the trees crying. Make it stop.Wayno wrote:Oh the humanity...
News & Discussion: O-Bahn
Re: News & Discussion: O-Bahn
Re: News & Discussion: O-Bahn
Some pictures taken 10 Apr 2016.
1 laying bitumen on hackney Rd where the centre island used to be.
2 piling on Dequetteville Tce just south of Botanic Rd
3 the path cleared through the parklands from Grenfell St looking east. On the right hand side (under the big tree) where the land slopes down on each side is where the original tram track used to be.
1 laying bitumen on hackney Rd where the centre island used to be.
2 piling on Dequetteville Tce just south of Botanic Rd
3 the path cleared through the parklands from Grenfell St looking east. On the right hand side (under the big tree) where the land slopes down on each side is where the original tram track used to be.
- Attachments
-
- 20160410_obahn 3.jpg (354.62 KiB) Viewed 3972 times
-
- 20160410_obahn 2.jpg (327.53 KiB) Viewed 3972 times
-
- 20160410_obahn1.jpg (182.1 KiB) Viewed 3972 times
- The Scooter Guy
- Super Size Scraper Poster!
- Posts: 1666
- Joined: Sat Aug 08, 2009 7:45 pm
- Location: Anywhere!
- Contact:
Re: News & Discussion: O-Bahn
FACT:
If you could do away with the O-Bahn City Access Project, then you could do away with over 50,000 jobs.
The Festival State that we all fondly love is in dire need of jobs and the new O-Bahn Tunnel from Hackney Rd to Grenfell St is a definite Must-Have!
If you could do away with the O-Bahn City Access Project, then you could do away with over 50,000 jobs.
The Festival State that we all fondly love is in dire need of jobs and the new O-Bahn Tunnel from Hackney Rd to Grenfell St is a definite Must-Have!
For starters, my avatar is the well-known Adelaide Aquatic Centre insignia from 1989.
https://www.youtube.com/channel/UCWk8YPx2zHziHgvyPy_9fxQ
http://www.flickr.com/photos/ryanthescooterguy/
http://ryansbedroom.tumblr.com/
https://www.youtube.com/channel/UCWk8YPx2zHziHgvyPy_9fxQ
http://www.flickr.com/photos/ryanthescooterguy/
http://ryansbedroom.tumblr.com/
Re: News & Discussion: O-Bahn
The Scooter Guy wrote:FACT:
If you could do away with the O-Bahn City Access Project, then you could do away with over 50,000 jobs.
The Festival State that we all fondly love is in dire need of jobs and the new O-Bahn Tunnel from Hackney Rd to Grenfell St is a definite Must-Have!
It's a bit late now to be debating whether we do it or not
Re: News & Discussion: O-Bahn
Yep got to love those long term sustainable jobs.The Scooter Guy wrote:FACT:
If you could do away with the O-Bahn City Access Project, then you could do away with over 50,000 jobs.
The Festival State that we all fondly love is in dire need of jobs and the new O-Bahn Tunnel from Hackney Rd to Grenfell St is a definite Must-Have!
Re: News & Discussion: O-Bahn
wut.The Scooter Guy wrote:FACT:
If you could do away with the O-Bahn City Access Project, then you could do away with over 50,000 jobs.
The Festival State that we all fondly love is in dire need of jobs and the new O-Bahn Tunnel from Hackney Rd to Grenfell St is a definite Must-Have!
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
Re: News & Discussion: O-Bahn
RAA advocacy.
How the O-Bahn Tunnel will cut travel times to the city
http://www.raa.com.au/community-and-adv ... ahn-update
How the O-Bahn Tunnel will cut travel times to the city
Road congestion, delays.Motorists are being urged to be patient while work on the O-Bahn Tunnel is rolled out....
... with the project to see the O-Bahn system extended from the end of the busway at Gilberton into the cross-city priority bus lane on Grenfell Street.
"Given this project will take at least a year to complete, we anticipate many motorists who regularly use this route will find it challenging at times,” said Charles Mountain, RAA Senior Manager Road Safety.
However, we must remember the sheer size of this project, and the long-term benefits it will create for commuters – both on the road and on public transport – once it’s completed.”
RAA:DPTI reports show the average bus speeds on Hackney Road can be as low as 20km/h, and even lower at 8km/h on North Tce, with 25 per cent of the delays being clocked up at intersections.
"Buses are currently getting stuck in traffic with general commuters and at intersections, while passengers are regularly delayed by peak hour traffic and city bound traffic is queuing back all the way to Bundeys Road along Hackney Road."
"These issues can be alleviated by taking the O-Bahn under Rundle Street and Rymill Park, as is proposed.”
The project will also include the creation of priority bus lanes along Hackney Road, with an expected completion date for the entire project in the second half of 2017.
More than 31,000 O-Bahn bus passengers and more than 79,000 vehicles travel this section of the city ring route daily.
"The O-Bahn tunnel will provide a quicker and more reliable route for bus commuters, and reduce traffic congestion and delays for vehicles using the Inner City Ring Route,” said Mr Mountain.
http://www.raa.com.au/community-and-adv ... ahn-update
Re: News & Discussion: O-Bahn
A view behind the green shade cloth fence on Dequeteville Tce . The bitumen surface has been removed along the piling alignment for the tunnel edge .
- Attachments
-
- 20160424_ ob 2.jpg (340.85 KiB) Viewed 3325 times
Re: News & Discussion: O-Bahn
An other view of the piling on Dequeteville Tce, picture taken from the opposite (southern end). And the western (Grenfell St) end of the tunnel entrance. All pictures 30 April 2016.
- Attachments
-
- 20160430_obahn 1.jpg (356.57 KiB) Viewed 3113 times
-
- 20160430_obahn 2.jpg (217.15 KiB) Viewed 3113 times
-
- 20160430_obahn 3.jpg (548.77 KiB) Viewed 3113 times
-
- High Rise Poster!
- Posts: 287
- Joined: Mon Dec 29, 2014 12:01 pm
Re: News & Discussion: O-Bahn
All O-Bahn services,plus 645/646 routes have resumed their normal timetables as from this morning.
-
- High Rise Poster!
- Posts: 240
- Joined: Thu Sep 24, 2009 5:13 pm
Re: News & Discussion: O-Bahn
Sheet piling is taking place on Dequeteville Tce. These piles interlock with one another and are then driven to the required depth to protect the tunnel walls .
- Attachments
-
- 20160508_obahan.jpg (181.44 KiB) Viewed 2851 times
Re: News & Discussion: O-Bahn
some more pictures of the Obahn project in the parklands. picture 1 taken from the public path on top of the where the tunnel entrance will be in the middle of the park lands where the green shade cloth is in the picture from last week. Picture 2 on Dequetiville Tce looking southwest to Rundle Rd.
- Attachments
-
- 20160515_obahn 2.jpg (188.49 KiB) Viewed 2644 times
-
- 20160515_obahn 1.jpg (366.25 KiB) Viewed 2644 times
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2745
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
Re: News & Discussion: O-Bahn
Apparently the footbridge idea has been scrapped.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
Re: News & Discussion: O-Bahn
Quite disappointing indeed.ChillyPhilly wrote:Apparently the footbridge idea has been scrapped.