[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1366 Post by Patrick_27 » Thu Jun 16, 2016 8:58 pm

Plasmatron wrote:Completion is schedule for the second half of... next year? Surely they mean this year. It looks almost finished now.
...You're joking, right? Have a look at the photos above, they're yet to apply the final cladding on the Torrens end, the building is largely a skeleton on the North Terrace end and isn't watertight, which for that reason they haven't even begun the internal fit-out... Whilst I'm hopeful that this will be finished earlier than the second half of next year, if that does happen, it will only be by a couple months.

ghs
Super Size Scraper Poster!
Posts: 1725
Joined: Thu Sep 18, 2008 8:09 am
Location: Brighton

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1367 Post by ghs » Fri Jun 17, 2016 11:21 am

Patrick_27 wrote:
Plasmatron wrote:Completion is schedule for the second half of... next year? Surely they mean this year. It looks almost finished now.
...You're joking, right? Have a look at the photos above, they're yet to apply the final cladding on the Torrens end, the building is largely a skeleton on the North Terrace end and isn't watertight, which for that reason they haven't even begun the internal fit-out... Whilst I'm hopeful that this will be finished earlier than the second half of next year, if that does happen, it will only be by a couple months.
It has to be completed by August next year as the international space conference will be on in September.

User avatar
Kasey771
Legendary Member!
Posts: 603
Joined: Sun Feb 21, 2010 8:56 am

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1368 Post by Kasey771 » Sun Jun 19, 2016 11:55 am

claybro wrote:Thanks for the photos Wayno. It is all coming along so quickly now. Still cant bring myself to like the most recent stages as much as I try not to hate on it. Just looking like a jumbled mess....but that's just me, others may love it.
Yep. I'm one of the ones that likes it. It looks futuristic to me, like a cadre of space ships landed on the banks of the Torrens.
Big infrastructure investments are usually under-valued and & over-criticized while in the planning stage. It's much easier to envision the here and now costs and inconveniences, and far more difficult to imagine fully the eventual benefits.

RiseHigh
High Rise Poster!
Posts: 103
Joined: Wed Apr 23, 2008 6:41 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1369 Post by RiseHigh » Mon Jun 20, 2016 8:29 pm

ghs wrote:
Patrick_27 wrote:
Plasmatron wrote:Completion is schedule for the second half of... next year? Surely they mean this year. It looks almost finished now.
...You're joking, right? Have a look at the photos above, they're yet to apply the final cladding on the Torrens end, the building is largely a skeleton on the North Terrace end and isn't watertight, which for that reason they haven't even begun the internal fit-out... Whilst I'm hopeful that this will be finished earlier than the second half of next year, if that does happen, it will only be by a couple months.
It has to be completed by August next year as the international space conference will be on in September.
Word is on site they are saying that it must be finished by June because there are bookings.
Last edited by RiseHigh on Mon Jun 27, 2016 8:44 pm, edited 1 time in total.

RiseHigh
High Rise Poster!
Posts: 103
Joined: Wed Apr 23, 2008 6:41 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1370 Post by RiseHigh » Mon Jun 27, 2016 8:27 pm

There is some interesting work happening at the moment on site they are building two large turntables with hundreds of seats on them that can turn around to view multiple stages, it's going to be pretty impressive when it's finished.

User avatar
Vee
Legendary Member!
Posts: 1105
Joined: Tue Nov 18, 2008 8:26 pm
Location: Eastern Suburbs

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1371 Post by Vee » Tue Jun 28, 2016 9:46 am

Riverbank Precinct and 'BioMed City' via Adelaide Convention Centre.

The Convention Centre will be able to host much larger conventions soon. This item on their site includes graphics and and a look towards the future of this rapidly emerging Riverbank precinct. This development, and a projected increase in reputation ('BioMed City') should be a huge boost to winning more, and significantly, larger conventions for the Centre.

Bonus: New, state of the art CC buildings, ideal Riverbank Precinct location and proximity to the emerging medical/research/education hub, plethora of hotel accommodation with tram links, the North Terrace Cultural precinct and more( great for partners of attendees).
The Medical Zone, dubbed BioMed City, is Adelaide’s world-class $3 billion health, bioscience and research hub.
The largest of its kind in the Southern hemisphere.

Currently located within the Zone is the South Australian Health and Medical Research Institute (SAHMRI), an iconic building and institution that’s attracting the world’s best and brightest medical researchers.
Read more:
Adelaide CC:
https://www.adelaidecc.com.au/happening ... ical-zone/

Mpol
High Rise Poster!
Posts: 130
Joined: Thu Aug 27, 2009 9:03 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1372 Post by Mpol » Tue Jun 28, 2016 10:36 am

Any images of the cladding? Keen to see if it will look like the renders. Really liked the design.

User avatar
Llessur2002
Super Size Scraper Poster!
Posts: 2130
Joined: Mon Mar 17, 2014 4:59 pm
Location: Inner West

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1373 Post by Llessur2002 » Tue Jun 28, 2016 12:54 pm

Hard to tell if it's the cladding proper or another layer of insulation going on. Whatever it is it's got a white vinyl covering on it so can't tell the final finish at this stage as far as I can see. Looks good though - the cladding smooths out the angles of the building.

User avatar
Nathan
Super Size Scraper Poster!
Posts: 3816
Joined: Tue Feb 03, 2009 1:09 pm
Location: Bowden
Contact:

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1374 Post by Nathan » Tue Jun 28, 2016 2:39 pm

I assume thats waterproofing going on at the moment.

Mpol
High Rise Poster!
Posts: 130
Joined: Thu Aug 27, 2009 9:03 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1375 Post by Mpol » Tue Jun 28, 2016 3:56 pm

Thanks for clarifying guys. Any chance we can rework the stage two facade? It still looks so out of place and cheap.

User avatar
SRW
Donating Member
Donating Member
Posts: 3650
Joined: Fri Jun 08, 2007 9:42 pm
Location: Glenelg

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1376 Post by SRW » Tue Jun 28, 2016 8:53 pm

Mpol wrote:Thanks for clarifying guys. Any chance we can rework the stage two facade? It still looks so out of place and cheap.
Swap out the brown alucobond panels for copper or some other material/colour and it might be saved.
Keep Adelaide Weird

EBG
Super Size Scraper Poster!
Posts: 3100
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1377 Post by EBG » Tue Jun 28, 2016 11:37 pm

Picture from yesterday for Mpol. From the left is the original layer then moving to the right there are 2 additional layers but as Llessur 2002 said hard to what the final colour is because there is a protective film on one layer. The orange mobile crane (right side) is working on the Play House roof upgrade.
Attachments
20160627_CC 1.jpg
20160627_CC 1.jpg (371.25 KiB) Viewed 3595 times

Mpol
High Rise Poster!
Posts: 130
Joined: Thu Aug 27, 2009 9:03 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1378 Post by Mpol » Wed Jun 29, 2016 8:09 am

EBG wrote:Picture from yesterday for Mpol. From the left is the original layer then moving to the right there are 2 additional layers but as Llessur 2002 said hard to what the final colour is because there is a protective film on one layer. The orange mobile crane (right side) is working on the Play House roof upgrade.
Thank you so much mate! :)

Patrick_27
Super Size Scraper Poster!
Posts: 2554
Joined: Tue Mar 05, 2013 4:41 pm
Location: Adelaide CBD, SA

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1379 Post by Patrick_27 » Wed Jun 29, 2016 7:43 pm

EBG wrote:Picture from yesterday for Mpol. From the left is the original layer then moving to the right there are 2 additional layers but as Llessur 2002 said hard to what the final colour is because there is a protective film on one layer. The orange mobile crane (right side) is working on the Play House roof upgrade.
From this angle it looks great, however looking at it from the west or front on, the building looks detached, which is why the previous design trumped this. It'd just a shame that they couldn't have merged the original building with this extension a little better.

Patrick_27
Super Size Scraper Poster!
Posts: 2554
Joined: Tue Mar 05, 2013 4:41 pm
Location: Adelaide CBD, SA

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1380 Post by Patrick_27 » Wed Jun 29, 2016 7:46 pm

Also, what are the InterContinental doing about that side of their building? I know that the plans for the festival plaza upgrade state that the loading dock will be lowered and accessible via the new underground roadway but will there be any activation of the new area above between the casino and the convention centre? Perhaps a new entry or restaurants?