[COM] 316-320 South Terrace | 51m | 14lvls | August Towers
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
More piling being done in the basement. This part of the site looks very wet compared to the rest of the site.
- Attachments
-
- 20160612_hutt st 1.jpg (440.85 KiB) Viewed 7325 times
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
The actual basement floor was poured today. There is a service core right up against the lane way on the northern side (in front of the worker with the helicopter float) .Unfortunately I could not fit it into the picture.
- Attachments
-
- 20160625_hutt st.jpg (297.21 KiB) Viewed 7069 times
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
I believe they have applied to add another level.
- Plasmatron
- High Rise Poster!
- Posts: 401
- Joined: Sun Sep 09, 2007 5:16 pm
- Location: St Georges, Adelaide, SA
- Contact:
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
Only one extra level? Oh well, beggars can't be choosers.
https://www.youtube.com/UltraVibeProductions
- monotonehell
- VIP Member
- Posts: 5466
- Joined: Fri Feb 01, 2008 12:10 am
- Location: Adelaide, East End.
- Contact:
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
Who is begging? ;PPlasmatron wrote:Only one extra level? Oh well, beggars can't be choosers.
Exit on the right in the direction of travel.
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
Some pre fab concrete walls have been erected up to the first floor. Still no sign of a crane base and no idea where one would even go.
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
I believe this one will have a core mounted crane.Ben wrote:Some pre fab concrete walls have been erected up to the first floor. Still no sign of a crane base and no idea where one would even go.
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
I agree with Pikey in that the crane could be mounted in the core. Pre cast columns were erected for the lower (of the 2 level) basement car park. Picture 7/7/16
- Attachments
-
- 20160707_HUTT ST 1.jpg (427.09 KiB) Viewed 6333 times
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
This project will have 2 basement levels. Picture from Saturday 23 July shows work on the floor level between the 2 basement levels
with a service core at the bottom of the picture. Still no sign of a crane base.
with a service core at the bottom of the picture. Still no sign of a crane base.
- Attachments
-
- 20160723_hutt st 1.jpg (489.74 KiB) Viewed 6163 times
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
The lower floor in previous picture was concreted today Thursday 28 July.
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
After the floor between the 2 basements was poured on Thursday the columns for the upper basement were installed Friday. Picture today (30/7/16)
- Attachments
-
- 20160730_hutt st.jpg (405.73 KiB) Viewed 5876 times
-
- Legendary Member!
- Posts: 870
- Joined: Sun Jul 15, 2007 5:51 pm
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
Work has now reached the street level. The bondek is now in place for the ground floor and the re-inforcement is ready to be placed and and the concrete should poured this week .If the crane is to be located in the service core it should go up in the next couple of weeks (?)
- Attachments
-
- 20160813_hutt st 1.jpg (198.17 KiB) Viewed 5538 times
-
- 20160813_hutt st 2.jpg (187.91 KiB) Viewed 5538 times
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
The ground floor level was poured today (Saturday 20 /8/16). The South Tce side is less developed. with just steel work only. The service core is located in the bottom right hand corner of picture 1.
- Attachments
-
- 20160820_hutt st 1.jpg (271.47 KiB) Viewed 5311 times
-
- 20160820_hutt st 2.jpg (443.94 KiB) Viewed 5311 times
-
- 20160820_hutt st 3.jpg (469.46 KiB) Viewed 5311 times
[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers
Spoke with a worker this morning. Apparently no permanent crane will be used. He's unsure of the crane type to be used, but he said they are mobile and will recurringly arrive onsite when required.