Not sure about a carpark, but there will definitely be a basement. On the part of the site that they're drilling in the pictures above. Any idea where the loading doc for the hospital will be?Ben wrote:I thought the hospital was having basement car parking? If it's not this will go up a lot quicker.
[COM] New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pulteney
-
- Super Size Scraper Poster!
- Posts: 2585
- Joined: Tue Mar 05, 2013 4:41 pm
- Location: Adelaide CBD, SA
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
From the plans there was three levels of underground carpark, so going to be a lot of soil removed. Not sure why they have levelled the block - maybe some part of the process to determine final levels for installing parameter piling?
Entrance to carpark will be from the old Bath Lane entrance. Loading dock entrance was up on the western side next to the SAPOL building
Entrance to carpark will be from the old Bath Lane entrance. Loading dock entrance was up on the western side next to the SAPOL building
-
- Legendary Member!
- Posts: 1233
- Joined: Thu Jan 24, 2013 1:26 am
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
-
- Super Size Scraper Poster!
- Posts: 2585
- Joined: Tue Mar 05, 2013 4:41 pm
- Location: Adelaide CBD, SA
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
Sounds about right, they are currently installing meshing for the concrete pylons on the eastern end of the block. They looked deep...how good is he wrote:Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
car park opposite to what exactly?how good is he wrote:Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
Opposite the hospital, on the other side of Angas Street.Algernon wrote:car park opposite to what exactly?how good is he wrote:Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
A picture of the piling rig (14 Aug 16) . It is nearly 4 stories high compared to the 2 story building on the right hand side. They have bored a series of piles along the fence fronting onto Pulteny St. Sorry about the picture quality (too late in the day)
- Attachments
-
- 20160814_calvery 2.jpg (161 KiB) Viewed 5094 times
-
- 20160814_calvery.jpg (137.8 KiB) Viewed 5094 times
-
- Super Size Scraper Poster!
- Posts: 2585
- Joined: Tue Mar 05, 2013 4:41 pm
- Location: Adelaide CBD, SA
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
Didn't have a chance to grab any pictures (wasn't really that exciting anyway), but they've levelled parking lot on the other side of Angus Street ready for the multi-level replacement.
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
Here is a picture of the car park site mentioned by Patrick_27 . It is just behind the on the run service station on Angus St. There are several work sheds on the footpath and the existing bitumen serface has been cleared so it looks like serious work is about to start.
- Attachments
-
- 20160820_calv 1.jpg (375.47 KiB) Viewed 4731 times
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
I wonder if this site will also have a crane, i would assume so at 8 levels?
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
Piling was taking place along the edge of Angas St on Saturday 24/9/16.
- Attachments
-
- 20160922_pulteny st.jpg (210.98 KiB) Viewed 4282 times
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
Yes there is a basement, they are excavating on the north (western) side.
- Attachments
-
- 20161004_ calv 2.jpg (382.37 KiB) Viewed 4016 times
- monotonehell
- VIP Member
- Posts: 5466
- Joined: Fri Feb 01, 2008 12:10 am
- Location: Adelaide, East End.
- Contact:
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
Fixed it for you.EBG wrote:Yes there is a swimming pool, they are excavating on the north (western) side.
Exit on the right in the direction of travel.
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
A partial basement with sloping floor has been dug over the southern part of the car park site opposite the hospital site. Meanwhile the hospital basement swimming pool is filling quite well thanks to the recent rain. Picture from Princess Street 16 Oct 16.
- Attachments
-
- 20161016_angas st car park.jpg (456.24 KiB) Viewed 3627 times
[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene
Update as at 30 Oct 16. A lot of work has been done on digging out the basement. Picture looking north west to rear of fire station.
- Attachments
-
- 20161030_calvery 1.jpg (396.72 KiB) Viewed 3357 times
Who is online
Users browsing this forum: abc, prometheus2704 and 13 guests