The new traffic light installation is somewhat confusing for vehicles turning right from South Road into Grange Road. When they have turned and are on the bridge they are faced with red lights which only apply to traffic from Manton St. Cars were coming to a halt even though there is no stop line before the northbound lanes of South Rd. Last evening there were a couple of personnel standing behind the barrier on the south side of the bridge frantically waving the right turn traffic from South Rd through the junction.
Another observation from yesterday was that the 66kV power lines along the east side of South Rd from Pym St have been removed from the poles south of Torrens Rd and and have been diverted across South Rd to the new underground cable which runs from the north side of Torrens Rd beside the west surface road to Croydon substation.
Another observation from yesterday was that the 66kV power lines along the east side of South Rd from Pym St have been removed from the poles south of Torrens Rd and and have been diverted across South Rd to the new underground cable which runs from the north side of Torrens Rd beside the west surface road to Croydon substation.
[U/C] Re: News & Discussion: South Road / North-South Corridor
I think this will only be an issue while the temporary barriers are in place. The right turn looks like it will sweep more into Grange Rd once they are removed.PD2/20 wrote:The new traffic light installation is somewhat confusing for vehicles turning right from South Road into Grange Road. When they have turned and are on the bridge they are faced with red lights which only apply to traffic from Manton St. Cars were coming to a halt even though there is no stop line before the northbound lanes of South Rd. Last evening there were a couple of personnel standing behind the barrier on the south side of the bridge frantically waving the right turn traffic from South Rd through the junction.
[U/C] Re: News & Discussion: South Road / North-South Corridor
Some pictures of the railway bridge project as at 27 Nov 2016. (1) A very heavy lift crawler crane has been set up on the vacant land between the railway line and the transformer Station. (2)the base for one of the supporting columns for the new bridge, (3) the retaining wall on the south western side in Euston Tce Croydon.
- Attachments
-
- 20161126_crane.jpg (138.18 KiB) Viewed 4258 times
-
- 20161126_south rd 2.jpg (230.05 KiB) Viewed 4258 times
-
- 20161126_soutth rd 1.jpg (263.19 KiB) Viewed 4258 times
-
- High Rise Poster!
- Posts: 447
- Joined: Tue Jul 08, 2014 7:23 pm
[U/C] Re: News & Discussion: South Road / North-South Corridor
From https://www.facebook.com/DPTISA/
SOUTH ROAD / PORT ROAD INTERSECTION
The T2T Project team will be installing bridge beams this weekend to construct the second half of the Port Road bridge.
Due to this work, speed and lane restrictions will be in place around the Port Road intersection with South Road from 7pm Friday 2 December to 6am Monday 5 December.
Please allow some extra travel time and take care when driving through the area.
I Follow The Port Adelaide Football Club
https://www.facebook.com/IFollowThePAFC/
https://www.facebook.com/IFollowThePAFC/
- Llessur2002
- Super Size Scraper Poster!
- Posts: 2131
- Joined: Mon Mar 17, 2014 4:59 pm
- Location: Inner West
[U/C] Re: News & Discussion: South Road / North-South Corridor
Overpass sections are being assembled.
[U/C] Re: News & Discussion: South Road / North-South Corridor
New video is up:
https://youtu.be/4MvGOTeV8Sk
-A lot of the high voltage power lines are gone.
-New western alignment is progressing to allow construction of the Torrens Road bridge.
-New Grange Road intersection
https://youtu.be/4MvGOTeV8Sk
-A lot of the high voltage power lines are gone.
-New western alignment is progressing to allow construction of the Torrens Road bridge.
-New Grange Road intersection
[U/C] Re: News & Discussion: South Road / North-South Corridor
I've now also uploaded the Darlington section here: https://youtu.be/oJKbvcguwu8
- Shows new road alignment between Marion Road and Flinders Drive
- All houses have been cleared
- Shows new road alignment between Marion Road and Flinders Drive
- All houses have been cleared
- Llessur2002
- Super Size Scraper Poster!
- Posts: 2131
- Joined: Mon Mar 17, 2014 4:59 pm
- Location: Inner West
[U/C] Re: News & Discussion: South Road / North-South Corridor
The west-bound Port Road bridge deck is taking shape...
[U/C] Re: News & Discussion: South Road / North-South Corridor
From what I've seen on road projects in Perth, they've got a lot of steel reinforcing to place on those beams before pouring the deck.
-
- High Rise Poster!
- Posts: 447
- Joined: Tue Jul 08, 2014 7:23 pm
[U/C] Re: News & Discussion: South Road / North-South Corridor
From https://www.facebook.com/DPTISA/
Major works have started on the Northern Connector project at the Southern Interchange!
The Southern Interchange will link the Northern Expressway with the South Road Superway and Port River Expressway.
If you are interested in working on this six-lane, 15.5km motorway visit www.northhub.sa.gov.au
Learn more about the Northern Connector Project at www.infrastructure.sa.gov.au/nsc/northern_connector
I Follow The Port Adelaide Football Club
https://www.facebook.com/IFollowThePAFC/
https://www.facebook.com/IFollowThePAFC/
[U/C] Re: News & Discussion: South Road / North-South Corridor
Still no update to the Northern Connecter designs on the project site.
There is however a glimpse of the current southern interchange design at the 30 second mark of the sod turning video.
https://www.youtube.com/watch?v=eJIgV7Vbqhw
There is however a glimpse of the current southern interchange design at the 30 second mark of the sod turning video.
https://www.youtube.com/watch?v=eJIgV7Vbqhw
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2745
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: News & Discussion: South Road / North-South Corridor
Screenshot of the design. Adelaide catching up with the other cities with an interchange like this.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: News & Discussion: South Road / North-South Corridor
There's another shot of a design map at the 13 second mark of a 9 News segment,
The video resolution is unfortunately quiet poor so it's hard to see what it is. Renders shown later in the video are from earlier (currently published) designs.
https://www.youtube.com/watch?v=MtXV0Iauy5g
The video resolution is unfortunately quiet poor so it's hard to see what it is. Renders shown later in the video are from earlier (currently published) designs.
https://www.youtube.com/watch?v=MtXV0Iauy5g
- Llessur2002
- Super Size Scraper Poster!
- Posts: 2131
- Joined: Mon Mar 17, 2014 4:59 pm
- Location: Inner West
[U/C] Re: News & Discussion: South Road / North-South Corridor
Another (I think the longest of the three) rail overpass section being assembled...
[U/C] Re: News & Discussion: South Road / North-South Corridor
Another traffic switch will occur this weekend at the Torrens Road/South Road intersection. This is in preparation for the construction of the Torrens Road bridge.
More details: http://www.t2talliance.com.au/wp88/wp-c ... ersion.pdf
More details: http://www.t2talliance.com.au/wp88/wp-c ... ersion.pdf
Who is online
Users browsing this forum: Ahrefs [Bot] and 2 guests