[U/C] M2 North-South Motorway
[U/C] Re: News & Discussion: South Road / North-South Corridor
Work on the Taylor bridge widening has halted (a few weeks ago I think, as none of the earthmoving equipment nearby has moved for a while) & been postponed until 'early 2018', and linear path will be temporarily reinstated under the bridge from Dec 15 (until an unspecified later date when it will be closed again). In the original bridge construction schedule released in May it should have been fully completed in September, so it seems that something significant has happened to cause them to pause work & fall so far behind schedule.
- Mr Smith
- High Rise Poster!
- Posts: 146
- Joined: Fri May 18, 2012 4:41 pm
- Location: Parkside Lunatic Asylum
[U/C] Re: News & Discussion: South Road / North-South Corridor
Doing this work on Taylor Bridge tends to suggest that the section south from Susan Street will likely be one of the final segments undertaken. Is the plan to go over Taylor Bridge and Ashwin Pde/W Thebarton Road in an elevated Superway build?Listy wrote: ↑Tue Dec 05, 2017 12:36 pmWork on the Taylor bridge widening has halted (a few weeks ago I think, as none of the earthmoving equipment nearby has moved for a while) & been postponed until 'early 2018', and linear path will be temporarily reinstated under the bridge from Dec 15 (until an unspecified later date when it will be closed again). In the original bridge construction schedule released in May it should have been fully completed in September, so it seems that something significant has happened to cause them to pause work & fall so far behind schedule.
There doesn't seem to be enough width at grade to replicate the T2T section around the bend/bridge due to close proximity of the cemetery.
[U/C] Re: News & Discussion: South Road / North-South Corridor
I think that the cemetery leases are being bought out one by one as each of them comes up to expiry.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2744
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: News & Discussion: South Road / North-South Corridor
The preference is for an elevated structure, but at-grade is a possibility.Mr Smith wrote:Doing this work on Taylor Bridge tends to suggest that the section south from Susan Street will likely be one of the final segments undertaken. Is the plan to go over Taylor Bridge and Ashwin Pde/W Thebarton Road in an elevated Superway build?Listy wrote: ↑Tue Dec 05, 2017 12:36 pmWork on the Taylor bridge widening has halted (a few weeks ago I think, as none of the earthmoving equipment nearby has moved for a while) & been postponed until 'early 2018', and linear path will be temporarily reinstated under the bridge from Dec 15 (until an unspecified later date when it will be closed again). In the original bridge construction schedule released in May it should have been fully completed in September, so it seems that something significant has happened to cause them to pause work & fall so far behind schedule.
There doesn't seem to be enough width at grade to replicate the T2T section around the bend/bridge due to close proximity of the cemetery.
As for a lack of room for the corridor, there's space to the west. I'm sure some property acquisition will be involved.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: News & Discussion: South Road / North-South Corridor
Brickworks -just- got redeveloped. There's about 5m of land west available (if that) that can be utilised. I'm going to hedge my bets the land acquisition will be to the east and be a tunnel portal through to SBR.
There is no way in hell there'll be an elevated structure, trench or at grade freeway through this section. I'll eat my hat and run down King William Street naked if anything else comes of otherwise.
There is no way in hell there'll be an elevated structure, trench or at grade freeway through this section. I'll eat my hat and run down King William Street naked if anything else comes of otherwise.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
[U/C] Re: News & Discussion: South Road / North-South Corridor
Just need the front of the cemetery and a few warehouses. The question is where does the it end, if It's elevated would it go all the way to the ANZAC highway underpass?[Shuz] wrote: ↑Tue Dec 05, 2017 6:36 pmBrickworks -just- got redeveloped. There's about 5m of land west available (if that) that can be utilised. I'm going to hedge my bets the land acquisition will be to the east and be a tunnel portal through to SBR.
There is no way in hell there'll be an elevated structure, trench or at grade freeway through this section. I'll eat my hat and run down King William Street naked if anything else comes of otherwise.
-
- Legendary Member!
- Posts: 1233
- Joined: Thu Jan 24, 2013 1:26 am
[U/C] Re: News & Discussion: South Road / North-South Corridor
I can’t see it being elevated. It would cost a fortune and residents opposition would be huge both for noise and aesthetically. It worked at Grand Junction Rd etc as it was all commercial properties surrounding it. The “cheap”/quick answer suggested was to put underpasses only at the main road intersections [H Beach Rd, Sir DB, Richmond Rd etc].
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2744
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: News & Discussion: South Road / North-South Corridor
This is a whip-up I did a while ago, based on the preferences listed by the Scoping Report.how good is he wrote: ↑Tue Dec 05, 2017 9:18 pmI can’t see it being elevated. It would cost a fortune and residents opposition would be huge both for noise and aesthetically. It worked at Grand Junction Rd etc as it was all commercial properties surrounding it. The “cheap”/quick answer suggested was to put underpasses only at the main road intersections [H Beach Rd, Sir DB, Richmond Rd etc].
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
-
- Sen-Rookie-Sational
- Posts: 44
- Joined: Mon Jan 10, 2011 10:57 am
[U/C] Re: News & Discussion: South Road / North-South Corridor
I wonder if they’ll add an extra northbound lane? n the June 2017 construction newsletter it did say 3 x southbound lanes and 2 x northbound lanes with a completion date of December 2017.Listy wrote:Work on the Taylor bridge widening has halted (a few weeks ago I think, as none of the earthmoving equipment nearby has moved for a while) & been postponed until 'early 2018', and linear path will be temporarily reinstated under the bridge from Dec 15 (until an unspecified later date when it will be closed again). In the original bridge construction schedule released in May it should have been fully completed in September, so it seems that something significant has happened to cause them to pause work & fall so far behind schedule.
Sent from my iPhone using Tapatalk Pro
- Mr Smith
- High Rise Poster!
- Posts: 146
- Joined: Fri May 18, 2012 4:41 pm
- Location: Parkside Lunatic Asylum
[U/C] Re: News & Discussion: South Road / North-South Corridor
I strongly doubt they will run a tunnel portal that far. From the readings it indicates 'short tunnels under HBR and SDBD' which tends to indicate 2 tunnels rather than 1 long one.[Shuz] wrote: ↑Tue Dec 05, 2017 6:36 pmBrickworks -just- got redeveloped. There's about 5m of land west available (if that) that can be utilised. I'm going to hedge my bets the land acquisition will be to the east and be a tunnel portal through to SBR.
There is no way in hell there'll be an elevated structure, trench or at grade freeway through this section. I'll eat my hat and run down King William Street naked if anything else comes of otherwise.
I cant see the big deal going over the top in that area. It basically Brickworks, an oval and a pub plus some run down old shops and the cemetery. It's hardly the eastern suburbs.
[U/C] Re: News & Discussion: South Road / North-South Corridor
If an extra lane is built on the eastern side, I doubt it will happen soon - To the immediate north of the river is the cemetery (state heritage listed), with grave plots just a few metres from the footpath to be moved, and to the south is a fairly new building built right up to the edge of South Rd & the river bank. Canon only just moved in there a few months ago & I'm guessing they won't want to move out again in a hurry - I imagine the lease would be at least 5 years.rockthenation wrote: ↑Wed Dec 06, 2017 3:24 amI wonder if they’ll add an extra northbound lane? n the June 2017 construction newsletter it did say 3 x southbound lanes and 2 x northbound lanes with a completion date of December 2017.Listy wrote:Work on the Taylor bridge widening has halted (a few weeks ago I think, as none of the earthmoving equipment nearby has moved for a while) & been postponed until 'early 2018', and linear path will be temporarily reinstated under the bridge from Dec 15 (until an unspecified later date when it will be closed again). In the original bridge construction schedule released in May it should have been fully completed in September, so it seems that something significant has happened to cause them to pause work & fall so far behind schedule.
Sent from my iPhone using Tapatalk Pro
- Llessur2002
- Super Size Scraper Poster!
- Posts: 2130
- Joined: Mon Mar 17, 2014 4:59 pm
- Location: Inner West
[U/C] Re: News & Discussion: South Road / North-South Corridor
Until you get just south of Brickworks where the area becomes very residential which, especially on the eastern side, includes many character properties just like the eastern suburbs. No one wants a freeway flyover within spitting distance of their home. A lowered road would be acceptable, as would a tunnel but that still leaves big questions over land acquisitions of character properties.Mr Smith wrote: ↑Wed Dec 06, 2017 9:04 amI strongly doubt they will run a tunnel portal that far. From the readings it indicates 'short tunnels under HBR and SDBD' which tends to indicate 2 tunnels rather than 1 long one.[Shuz] wrote: ↑Tue Dec 05, 2017 6:36 pmBrickworks -just- got redeveloped. There's about 5m of land west available (if that) that can be utilised. I'm going to hedge my bets the land acquisition will be to the east and be a tunnel portal through to SBR.
There is no way in hell there'll be an elevated structure, trench or at grade freeway through this section. I'll eat my hat and run down King William Street naked if anything else comes of otherwise.
I cant see the big deal going over the top in that area. It basically Brickworks, an oval and a pub plus some run down old shops and the cemetery. It's hardly the eastern suburbs.
Just south of Brickworks there's the brand new community centre on the western side of the road and the heritage-listed West Thebarton Hotel immediately opposite on the eastern side. Further south there's the Thebarton Theatre and Municipal Hall (both state heritage listed) directly opposite St George College. Just north of those there are several local heritage listed buildings (Queen of Angels Church and the former Thebarton Town Hall and Police Station) on the eastern side South Road opposite about 1 km worth of contributory heritage listed properties. All directly fronting South Road. How do those dilemmas get solved? Not easily or without significant backlash by local residents/heritage groups etc.
[U/C] Re: News & Discussion: South Road / North-South Corridor
Goodsy your green line on your image completely misses the Taylors Bridge, which is in the middle of being widened to accommodate this roadwork as we speak. While it is a nice smooth curve, I think you have it in the wrong place.
cheers,
Rhino
Rhino
[U/C] Re: News & Discussion: South Road / North-South Corridor
the bridge will still need to be there for the surface road
Who is online