[U/C] Westfield Tea Tree Plaza (Extension)
[U/C] Re: Tea Tree Plaza Upgrade | $190m
Pics from last week, carpark entirely dug up and already preparing for the foundations. Seems like they're demolishing those fire escape stairs
- Attachments
-
- Construction.jpg (223.88 KiB) Viewed 6688 times
-
- Untitled-2.jpg (200.82 KiB) Viewed 6688 times
[U/C] Re: Tea Tree Plaza Upgrade | $190m
Title should be changed to either SWP or UC.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
- monotonehell
- VIP Member
- Posts: 5466
- Joined: Fri Feb 01, 2008 12:10 am
- Location: Adelaide, East End.
- Contact:
[U/C] Re: Tea Tree Plaza Upgrade | $190m
Maybe... but is this the same upgrade that this thread was started with in 2006? This seems to be a completely different plan to then.
Exit on the right in the direction of travel.
-
- Super Size Scraper Poster!
- Posts: 2559
- Joined: Tue Mar 05, 2013 4:41 pm
- Location: Adelaide CBD, SA
[U/C] Re: Tea Tree Plaza Upgrade | $190m
No change should be made... There wasn't a change of title for the Marion extension and the same should apply here.monotonehell wrote: ↑Sat Nov 11, 2017 5:02 pmMaybe... but is this the same upgrade that this thread was started with in 2006? This seems to be a completely different plan to then.
[U/C] Re: Tea Tree Plaza Upgrade | $190m
VIS: VISion (not yet submitted to authority)
PRO: PROposed (submitted to authority, awaiting approval)
APP: APProved by authority
DEF: DEFerred by authority
REJ: REJected by authority
ONH: ON Hold
SWP: Site Works in Progress
- foundation work commenced; including the excavation of forms for foundations
- Note any site preparation, demolition of existing structures, clearing / leveling soil, ribbon cutting or sod turning ceremonies do not count as starting of site works in progress
U/R: Under Renovation
- where not a new build, old structure is undergoing external renovation
U/C: Under Construction
- actual building progress is being made
COM: COMpleted
- Tennant ready
[U/C] Tea Tree Plaza Upgrade | $190m
I’m a relative newbie too I always thought it was “on hold.” Not sure what SWP stands for.nath199 wrote:What does ONH stand for? Sorry , newbie here
Sent from my iPhone using Tapatalk
Big infrastructure investments are usually under-valued and & over-criticized while in the planning stage. It's much easier to envision the here and now costs and inconveniences, and far more difficult to imagine fully the eventual benefits.
- monotonehell
- VIP Member
- Posts: 5466
- Joined: Fri Feb 01, 2008 12:10 am
- Location: Adelaide, East End.
- Contact:
[U/C] Re: Tea Tree Plaza Upgrade | $190m
Guys at the top of every development forum is the pinned post "[Read This] - Guide to Navigating the Development Forum" http://sensational-adelaide.com/forum/v ... f=4&t=1881
Exit on the right in the direction of travel.
[U/C] Re: [ONH] Re: Tea Tree Plaza Upgrade | $190m
The thing about announcements is that many users will never see them.monotonehell wrote:Guys at the top of every development forum is the pinned post "[Read This] - Guide to Navigating the Development Forum" http://sensational-adelaide.com/forum/v ... f=4&t=1881
[U/C] Re: Tea Tree Plaza Upgrade | $190m
Cheers guys. Given the progress of this one shouldn't be too long hopefully until we see this U/C with the bigger Plaza/Plus connection project.
I'm following the Scentre Group projects, they're investing $1 billion in their 3 WA centres so seems like they're spending on as many assets as they can to bring them up to scratch to hold their relevance in the market - so hopefully this continues into SA with TTP, Marion and West Lakes in the next few years after nearly 2 decades of delays.
I'm following the Scentre Group projects, they're investing $1 billion in their 3 WA centres so seems like they're spending on as many assets as they can to bring them up to scratch to hold their relevance in the market - so hopefully this continues into SA with TTP, Marion and West Lakes in the next few years after nearly 2 decades of delays.
[U/C] Re: Tea Tree Plaza Upgrade | $190m
I love the number of times I have heard people say "Oh I don't know why they would be doing this work over Christmas." when it's a longer than 12-month project, so regardless of when they start, it would always impact on a Christmas period. Also, they are not adding parking. There may be a few around the new building that come back, but overall they are gone.
[U/C] Re: Tea Tree Plaza Upgrade | $190m
In fact a whole pile of parking is now gone at TTP. In addition to the spots lost for the redevelopment, pretty much the entire O-Bahn side of the car park (beyond the undercover/upper deck parking) is now staff parking.duke wrote: ↑Tue Dec 05, 2017 4:08 pmI love the number of times I have heard people say "Oh I don't know why they would be doing this work over Christmas." when it's a longer than 12-month project, so regardless of when they start, it would always impact on a Christmas period. Also, they are not adding parking. There may be a few around the new building that come back, but overall they are gone.
- The Scooter Guy
- Super Size Scraper Poster!
- Posts: 1666
- Joined: Sat Aug 08, 2009 7:45 pm
- Location: Anywhere!
- Contact:
[U/C] Re: Tea Tree Plaza Upgrade | $190m
I assume Rebel Sport at Tea Tree Plus might be relocating in a few months, hence the older signage.
So with Caffe Bongiorno gone, this could just mean the beginning of the much-anticipated joining of the two big buildings!
So with Caffe Bongiorno gone, this could just mean the beginning of the much-anticipated joining of the two big buildings!
For starters, my avatar is the well-known Adelaide Aquatic Centre insignia from 1989.
https://www.youtube.com/channel/UCWk8YPx2zHziHgvyPy_9fxQ
http://www.flickr.com/photos/ryanthescooterguy/
http://ryansbedroom.tumblr.com/
https://www.youtube.com/channel/UCWk8YPx2zHziHgvyPy_9fxQ
http://www.flickr.com/photos/ryanthescooterguy/
http://ryansbedroom.tumblr.com/
- The Scooter Guy
- Super Size Scraper Poster!
- Posts: 1666
- Joined: Sat Aug 08, 2009 7:45 pm
- Location: Anywhere!
- Contact:
[U/C] Re: Tea Tree Plaza Upgrade | $190m
Noticed them earlier too, assuming they are part of the new cinema expansion.
For starters, my avatar is the well-known Adelaide Aquatic Centre insignia from 1989.
https://www.youtube.com/channel/UCWk8YPx2zHziHgvyPy_9fxQ
http://www.flickr.com/photos/ryanthescooterguy/
http://ryansbedroom.tumblr.com/
https://www.youtube.com/channel/UCWk8YPx2zHziHgvyPy_9fxQ
http://www.flickr.com/photos/ryanthescooterguy/
http://ryansbedroom.tumblr.com/
Who is online
Users browsing this forum: Majestic-12 [Bot] and 2 guests