Re: News & Discussion: Trams
I agree Rubberman, credit where credit is due, they have done an amazing job working 24/7, in stifling heat and around peak events with very tight deadlines and no room for error.
-
- High Rise Poster!
- Posts: 287
- Joined: Mon Dec 29, 2014 12:01 pm
Re: News & Discussion: Trams
Destos on Flexities still show "West Terrace". Will be interested to see if when the destos are updated if this is changed?Torrens_5022 wrote: ↑Tue Jan 23, 2018 6:19 pmWest Terrace tram stop has been renamed to Royal Adelaide Hospital.
- English Electric
- Sen-Rookie-Sational
- Posts: 24
- Joined: Tue Jan 23, 2018 8:41 pm
Re: News & Discussion: Trams
The West Terrace tram stop has also morphed to Royal Adelaide Hospital on Google Maps, Adelaide Metro's online timetables and in third-party transit apps like myStops.adelaide transport wrote: ↑Tue Jan 23, 2018 8:03 pmDestos on Flexities still show "West Terrace". Will be interested to see if when the destos are updated if this is changed?
I remember in the early days of the tram extensions (to City West then the Entertainment Centre), they seemed to struggle to update the destos in a timely way on the Flexities. Even last week, the Flexities inbound from Glenelg to Victoria Square were showing "Special", while the Citadis were able to display the slightly more helpful "Victoria Sq". If they can't manage to program all the plausible turnback points, you'd think they'd at least have a generic "City" destination.
Be interesting to see if they will enter the two new destinations (plus RAH) into the Flexities in time for the East End / Festival Centre stop openings.
-
- High Rise Poster!
- Posts: 224
- Joined: Sun Feb 26, 2017 5:12 pm
Re: News & Discussion: Trams
Google maps satellite view of Adelaide has been updated. It shows the tramworks pretty much when they were at their busiest.
Re: News & Discussion: Trams
I'm not seeing it. Is there something obvious I'm not doing?Ser Noit of Loit wrote: ↑Tue Jan 23, 2018 9:54 pmGoogle maps satellite view of Adelaide has been updated. It shows the tramworks pretty much when they were at their busiest.
Big infrastructure investments are usually under-valued and & over-criticized while in the planning stage. It's much easier to envision the here and now costs and inconveniences, and far more difficult to imagine fully the eventual benefits.
Re: News & Discussion: Trams
Have you turned off the 3D option?Kasey771 wrote:I'm not seeing it. Is there something obvious I'm not doing?Ser Noit of Loit wrote: ↑Tue Jan 23, 2018 9:54 pmGoogle maps satellite view of Adelaide has been updated. It shows the tramworks pretty much when they were at their busiest.
Re: News & Discussion: Trams
I had the same problem - there's a small "3D on" in the menu that I needed to click, which removed the large "3D" near the zoom in/out buttons. The images are newer with "3D off". Thanks for bringing it to our attention.Norman wrote: ↑Thu Jan 25, 2018 7:42 amHave you turned off the 3D option?Kasey771 wrote:I'm not seeing it. Is there something obvious I'm not doing?Ser Noit of Loit wrote: ↑Tue Jan 23, 2018 9:54 pmGoogle maps satellite view of Adelaide has been updated. It shows the tramworks pretty much when they were at their busiest.
Re: News & Discussion: Trams
More tram stop photos from today outside Ayers House:
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk
Re: News & Discussion: Trams
Haven't been following this closely, and apologies if I missed earlier in the thread, but is there any specific reason they have switched to side platforms for the East end rather than centre platforms as used everywhere else in the CBD? Operationally I'm sure the side platforms are better if 2 opposing trams happen to arrive at the same time, but I think the centre platforms look better as in KWS.
-
- Super Size Scraper Poster!
- Posts: 2006
- Joined: Tue Sep 04, 2007 10:32 pm
- Location: ADL ex DRW, ASP, MGB
Re: News & Discussion: Trams
If you use side platforms (like most tram operators on the planet do), you can run buses on the tram tracks, either as substitutes ror when trams aren't running, or to take buses off the roads.claybro wrote: ↑Thu Jan 25, 2018 3:05 pmHaven't been following this closely, and apologies if I missed earlier in the thread, but is there any specific reason they have switched to side platforms for the East end rather than centre platforms as used everywhere else in the CBD? Operationally I'm sure the side platforms are better if 2 opposing trams happen to arrive at the same time, but I think the centre platforms look better as in KWS.
Thus, when the trams were stopped from Vic Square to the Entertainment Centre, the buses couldn't use the existing tram stops down Port Road. Thus, extra buses down an already crowded Port Road, while the track and tram stops were unused.
Were those stops side entry, not only could trams use the stops, but also other Port Road and Grange Road buses (and their stops) could use the tram lane as a de-facto busway. Faster for tram travellers, less buses on Port Road car lanes. But centre stops.
If the Liberals had any get up and go in them, they'd promise to slash travel times down the Port Road and Grange Road, plus remove most buses from the car and truck lanes by doing this. It would be cheaper than the O-Bahn tunnel , and probably save as much time. That is, if the Liberals had any get up and go in them.
Re: News & Discussion: Trams
Thanks for the reply rubberman. I do get that side platforms are the preferred operational option, but I guess I am just confused as to why, having committed to centre platforms everywhere else on the extension...suddenly they are back to side loading.rubberman wrote: ↑Thu Jan 25, 2018 3:42 pmIf you use side platforms (like most tram operators on the planet do), you can run buses on the tram tracks, either as substitutes ror when trams aren't running, or to take buses off the roads.claybro wrote: ↑Thu Jan 25, 2018 3:05 pmHaven't been following this closely, and apologies if I missed earlier in the thread, but is there any specific reason they have switched to side platforms for the East end rather than centre platforms as used everywhere else in the CBD? Operationally I'm sure the side platforms are better if 2 opposing trams happen to arrive at the same time, but I think the centre platforms look better as in KWS.
Thus, when the trams were stopped from Vic Square to the Entertainment Centre, the buses couldn't use the existing tram stops down Port Road. Thus, extra buses down an already crowded Port Road, while the track and tram stops were unused.
Were those stops side entry, not only could trams use the stops, but also other Port Road and Grange Road buses (and their stops) could use the tram lane as a de-facto busway. Faster for tram travellers, less buses on Port Road car lanes. But centre stops.
If the Liberals had any get up and go in them, they'd promise to slash travel times down the Port Road and Grange Road, plus remove most buses from the car and truck lanes by doing this. It would be cheaper than the O-Bahn tunnel , and probably save as much time. That is, if the Liberals had any get up and go in them.
As for the Liberals and anything with steel wheels on steel tracks...
-
- Super Size Scraper Poster!
- Posts: 2006
- Joined: Tue Sep 04, 2007 10:32 pm
- Location: ADL ex DRW, ASP, MGB
Re: News & Discussion: Trams
I think the reason for the change is because they are on a learning curve. I don’t say that to be snarky, there's really a huge amount of specialised stuff that differs from buses and trains. For a single line, it's hardly worth the cost of an extra two or three tram technology specialists. However, with the prospect of a new network, the danger is of falling into the clutches of consultants whose only aim is to gold plate everything without knowing enough to offset that in some way.claybro wrote: ↑Thu Jan 25, 2018 5:17 pmThanks for the reply rubberman. I do get that side platforms are the preferred operational option, but I guess I am just confused as to why, having committed to centre platforms everywhere else on the extension...suddenly they are back to side loading.rubberman wrote: ↑Thu Jan 25, 2018 3:42 pmIf you use side platforms (like most tram operators on the planet do), you can run buses on the tram tracks, either as substitutes ror when trams aren't running, or to take buses off the roads.claybro wrote: ↑Thu Jan 25, 2018 3:05 pmHaven't been following this closely, and apologies if I missed earlier in the thread, but is there any specific reason they have switched to side platforms for the East end rather than centre platforms as used everywhere else in the CBD? Operationally I'm sure the side platforms are better if 2 opposing trams happen to arrive at the same time, but I think the centre platforms look better as in KWS.
Thus, when the trams were stopped from Vic Square to the Entertainment Centre, the buses couldn't use the existing tram stops down Port Road. Thus, extra buses down an already crowded Port Road, while the track and tram stops were unused.
Were those stops side entry, not only could trams use the stops, but also other Port Road and Grange Road buses (and their stops) could use the tram lane as a de-facto busway. Faster for tram travellers, less buses on Port Road car lanes. But centre stops.
If the Liberals had any get up and go in them, they'd promise to slash travel times down the Port Road and Grange Road, plus remove most buses from the car and truck lanes by doing this. It would be cheaper than the O-Bahn tunnel , and probably save as much time. That is, if the Liberals had any get up and go in them.
As for the Liberals and anything with steel wheels on steel tracks...
-
- Super Size Scraper Poster!
- Posts: 2006
- Joined: Tue Sep 04, 2007 10:32 pm
- Location: ADL ex DRW, ASP, MGB
Re: News & Discussion: Trams
Just got this in my email:
"...Hello
Due to the forecast of very high daytime temperatures this weekend , the decision has been made to reschedule the Gawler Place intersection works to night time only .
Works are now scheduled for the evenings of Thursday 25 , Saturday 27, Sunday 28 and Monday 29 , with Tuesday 30 allocated as a contingency night if needed. Works will be from 8pm to 6am in this period , with no works occuring either day or night on Friday 26 January 2018.
Please note that during the night works, traffic will be restricted to one lane in each direction along North Terrace ,with a return to two lanes in each direction during the day . Two lanes will remain open in both direction on Friday 26 January both day and night. Right turn traffic movements will not be permitted through the intersection during the work period.
Regards
Stakeholder and Community Engagement Team
For more information on the City Tram Extension Project please visit www.citytramextension.sa.gov.au, call the enquiry line on 1300 030 919 or email [email protected] ...."
"...Hello
Due to the forecast of very high daytime temperatures this weekend , the decision has been made to reschedule the Gawler Place intersection works to night time only .
Works are now scheduled for the evenings of Thursday 25 , Saturday 27, Sunday 28 and Monday 29 , with Tuesday 30 allocated as a contingency night if needed. Works will be from 8pm to 6am in this period , with no works occuring either day or night on Friday 26 January 2018.
Please note that during the night works, traffic will be restricted to one lane in each direction along North Terrace ,with a return to two lanes in each direction during the day . Two lanes will remain open in both direction on Friday 26 January both day and night. Right turn traffic movements will not be permitted through the intersection during the work period.
Regards
Stakeholder and Community Engagement Team
For more information on the City Tram Extension Project please visit www.citytramextension.sa.gov.au, call the enquiry line on 1300 030 919 or email [email protected] ...."