Based purely on distance between stations. Cheltenham should go before Alberton if the stations were rationalised. If it were up to me: Cheltenham, Woodville Park and West Croydon would go. But ideally, all stations would need repositioning along the lines to maximise efficiency (although that's much harder than it sounds). Those stations were put there in a different technological and economic reality.jorcoga wrote: ↑Fri Jun 01, 2018 2:33 amAlberton station is one of two on the line (the other being Bowden) that's state heritage listed (not only that - both sides are specifically and separately listed, god knows why)! There's something of a historic retail strip that runs off the station on both sides but most of the shopfronts have been converted to housing - it's the kind of place that'd be hipster central if it were closer in to the city and if you put some effort in you could get quite a nice little niche strip like Queen Street going. There's a beautiful old theatre that's an IGA now and I'd love to see something less depressing done with the space.Llessur2002 wrote: ↑Fri May 25, 2018 11:09 amAlberton is the first station along the line that I can't see an immediate argument for keeping but I know very little of its patronage, the local area etc.
There's also Mount Carmel College just around the corner which it'd serve as well.
News & Discussion: O-Bahn
Re: News & Discussion: O-Bahn
- 1NEEDS2POST
- High Rise Poster!
- Posts: 498
- Joined: Tue Jun 26, 2018 5:01 pm
Re: News & Discussion: O-Bahn
The new tunnel has opened up more opportunities.
Similar to buses joining the O-Bahn at the interchanges, buses could join just for the new section. Other bus routes from the north-east could join the O-Bahn on the city ring route. For example, buses from Hampstead Rd and North East Rd. Example routes are 202, 203, 206, 208, 271 and 273. At the moment, when heading to the city, they turn right from the ring route into Melbourne St. Then they are stuck in congestion until the city. Rather than doing this, if they continue on the ring route they could use the O-Bahn tunnel to get into the city much faster.
I don't see why as many routes as possible aren't pushed through the O-Bahn tunnel. That way more buses are out of congestion.
Similar to buses joining the O-Bahn at the interchanges, buses could join just for the new section. Other bus routes from the north-east could join the O-Bahn on the city ring route. For example, buses from Hampstead Rd and North East Rd. Example routes are 202, 203, 206, 208, 271 and 273. At the moment, when heading to the city, they turn right from the ring route into Melbourne St. Then they are stuck in congestion until the city. Rather than doing this, if they continue on the ring route they could use the O-Bahn tunnel to get into the city much faster.
I don't see why as many routes as possible aren't pushed through the O-Bahn tunnel. That way more buses are out of congestion.
Re: News & Discussion: O-Bahn
Ok on theory, but major changes would be required to Grenfel street to accomodate all the extra buses. Also, reduced frequency along Melbourne Street would not be beneficial for that strip. Some express services however could warrant this.
Re: News & Discussion: O-Bahn
They also need to be o-bahn enabled buses. Not a huge deal, but it is another logistical and technical requirement to worry about for such a small part of the trip.
-
- High Rise Poster!
- Posts: 447
- Joined: Tue Jul 08, 2014 7:23 pm
Re: News & Discussion: O-Bahn
Here is a bus for the O-bahn.
From https://www.digitaltrends.com/cars/germ ... -long-bus/
From https://www.digitaltrends.com/cars/germ ... -long-bus/
- Attachments
-
- autotram-bus-1200x630-c-ar1.91.jpg (61.21 KiB) Viewed 8580 times
I Follow The Port Adelaide Football Club
https://www.facebook.com/IFollowThePAFC/
https://www.facebook.com/IFollowThePAFC/
Re: News & Discussion: O-Bahn
Pity it doesn't tell us how the middle section steers.I Follow PAFC wrote: ↑Thu Jun 28, 2018 1:03 pmHere is a bus for the O-bahn.
From https://www.digitaltrends.com/cars/germ ... -long-bus/
It's longer than a B-double, with only five axles to supposedly carry more than 250 people. i wonder what road rules and driver licensing might be required here.
I suspect those middle axles will chew through both tyres and road surfaces rather quickly.
-
- High Rise Poster!
- Posts: 380
- Joined: Mon Dec 14, 2015 7:31 pm
Re: News & Discussion: O-Bahn
It'll be the dreaded Multi-Combination. Dreaded because it takes so long to get.
Follow me on Flickr
http://www.flickr.com/photos/135625678@N06/
http://www.flickr.com/photos/135625678@N06/
- 1NEEDS2POST
- High Rise Poster!
- Posts: 498
- Joined: Tue Jun 26, 2018 5:01 pm
Re: News & Discussion: O-Bahn
You could say that about the other O-Bahn routes. After all, the city end of the original O-Bahn track could have connected with Melbourne St, but they chose not to.
With my proposal, you could have a stop at the end of Melbourne St.
Articulated buses only need a heavy rigid licence. Maybe the same rules will apply with bi-articulated buses? Are there any bi-articulated buses in Australia?OlympusAnt wrote: ↑Thu Jun 28, 2018 5:25 pmIt'll be the dreaded Multi-Combination. Dreaded because it takes so long to get.
-
- High Rise Poster!
- Posts: 380
- Joined: Mon Dec 14, 2015 7:31 pm
Re: News & Discussion: O-Bahn
I thought the licenses were based on the number of pivot points?
Follow me on Flickr
http://www.flickr.com/photos/135625678@N06/
http://www.flickr.com/photos/135625678@N06/
- 1NEEDS2POST
- High Rise Poster!
- Posts: 498
- Joined: Tue Jun 26, 2018 5:01 pm
Re: News & Discussion: O-Bahn
OlympusAnt wrote: ↑Sun Jul 01, 2018 9:50 pmI thought the licenses were based on the number of pivot points?
It doesn't say any thing about a bi-articulated bus, so let's hope it's counted as an articulated bus.http://mylicence.sa.gov.au/my-heavy-vehicle-licence/heavy-rigid-or-heavy-combination wrote: What can I drive on a HR class licence?
A motor vehicle authorised to be driven by a licence of a preceding class.
A motor vehicle (including an articulated bus but not including any other articulated motor vehicle) with 3 or more axles and a GVM greater than 8 t (e.g. any bus (including articulated buses) trucks and tippers).
A motor vehicle included in 2 towing a single trailer (other than a semi-trailer) with a GVM not greater than 9 t, subject to the combination mass limits fixed under the Road Traffic Act 1961.
Re: News & Discussion: O-Bahn
The bus lane along Hackney is already showing grooves from the buses. The pooling from this morning’s rain made it quite obvious.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
Re: News & Discussion: O-Bahn
A stretch of Currie St right next to Leigh Street/Topham Mall was recently resurfaced after some borderline dangerously deep grooves. I feel that the wrong kind of surface is being constructed and/or the final layer is not being given adequate time to 'cure' or 'set'.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
Re: News & Discussion: O-Bahn
There is now a travel time comparison indicator on both Grenfell Street and Park Terrace.
Re: News & Discussion: O-Bahn
Is there an argument to use concrete roads like the Northern Connector given the amount of use on Grenfell now?ChillyPhilly wrote: ↑Fri Aug 03, 2018 10:47 pmA stretch of Currie St right next to Leigh Street/Topham Mall was recently resurfaced after some borderline dangerously deep grooves. I feel that the wrong kind of surface is being constructed and/or the final layer is not being given adequate time to 'cure' or 'set'.
I assume he argument is who is coughing up the cash to do it?
-
- Super Size Scraper Poster!
- Posts: 2029
- Joined: Tue Sep 04, 2007 10:32 pm
- Location: ADL ex DRW, ASP, MGB
Re: News & Discussion: O-Bahn
If we were to go to the expense of reinforced concrete, might as well put a couple of steel rails in there - about 4'-8 1/2" apart.Waewick wrote: ↑Fri Aug 10, 2018 9:43 amIs there an argument to use concrete roads like the Northern Connector given the amount of use on Grenfell now?ChillyPhilly wrote: ↑Fri Aug 03, 2018 10:47 pmA stretch of Currie St right next to Leigh Street/Topham Mall was recently resurfaced after some borderline dangerously deep grooves. I feel that the wrong kind of surface is being constructed and/or the final layer is not being given adequate time to 'cure' or 'set'.
I assume he argument is who is coughing up the cash to do it?