[U/C] M2 North-South Motorway
[U/C] Re: North-South Motorway
Noticed they were testing one of the display screens heading into the trench this morning just past Pym St. This is in addition to many of the speed limit signs flashing at 10 km/h for the workmen.
Looks like they're making good progress surfacing the road too. Reckon we're still good for a September opening?
Looks like they're making good progress surfacing the road too. Reckon we're still good for a September opening?
[U/C] Re: North-South Motorway
Photo of the Sutton Road bridge at Darlington which was posted on the DPTI Facebook page. It shows the excavation of the trench. Still a long way to go.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2744
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: North-South Motorway
These went up on DPTI's LinkedIn page.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: North-South Motorway
What are they doing with the dirt they dig out of the trench? Is it getting taken all the way to the Northern Connector, or is there somewhere closer to take it?
[U/C] Re: North-South Motorway
A new video update of the Darlington project has been posted by the DPTI on its youtube channel:
https://youtu.be/Q4I4scWBSAk
https://youtu.be/Q4I4scWBSAk
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2744
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: North-South Motorway
Good progress has been made with T2T the past week or so.
Firstly, the widening of Taylors Bridge (the one over the Torrens) looks to be almost complete.
Throughout the rest of the project, finishing touches for concrete components are being done (e.g. the concrete on the South Road surface acting as a buffer between traffic and the wall of the trench). Lighting has been installed, along with traffic management cameras.
I dare say we could expect it to be traffic ready in about a month.
Firstly, the widening of Taylors Bridge (the one over the Torrens) looks to be almost complete.
Throughout the rest of the project, finishing touches for concrete components are being done (e.g. the concrete on the South Road surface acting as a buffer between traffic and the wall of the trench). Lighting has been installed, along with traffic management cameras.
I dare say we could expect it to be traffic ready in about a month.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: North-South Motorway
It took a nearly a year longer than expected, but the newly widened side of Taylor Bridge was open to traffic tonight. However the eastern side is now closed (for resurfacing? so probably not for long). When I drove past there seemed to be excavation & leveling work going on over the weekend at the northern end of the T2T - that part still looks more than a month away from finishing to me?ChillyPhilly wrote: ↑Sat Jul 07, 2018 1:00 pmGood progress has been made with T2T the past week or so.
Firstly, the widening of Taylors Bridge (the one over the Torrens) looks to be almost complete.
Throughout the rest of the project, finishing touches for concrete components are being done (e.g. the concrete on the South Road surface acting as a buffer between traffic and the wall of the trench). Lighting has been installed, along with traffic management cameras.
I dare say we could expect it to be traffic ready in about a month.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2744
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: North-South Motorway
Excavation is a pretty quick process, but what takes longer is the service relocation. Most of this is done at the northern end, so it's a matter of tidying it up and finishing it off. Then in comes the final layer of asphalt in September, followed by landscaping and other urban treatments by the end of the year.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: North-South Motorway
The July construction update has been posted on the DPTI website for the Darlington Upgrade...
Website:
https://www.infrastructure.sa.gov.au/ns ... blications
Direct link to the update:
https://www.infrastructure.sa.gov.au/__ ... er_web.pdf
Some pretty good information about how the bridges are being constructed and the upcoming traffic diversions. Would've been awesome if they had some dates for these milestones though.
Website:
https://www.infrastructure.sa.gov.au/ns ... blications
Direct link to the update:
https://www.infrastructure.sa.gov.au/__ ... er_web.pdf
Some pretty good information about how the bridges are being constructed and the upcoming traffic diversions. Would've been awesome if they had some dates for these milestones though.
[U/C] Re: North-South Motorway
The next traffic switch letter was sent out by email yesterday, but I haven't seen it on the website yet.
The weekend of July 28 will see traffic over the first expressway bridge
The weekend of July 28 will see traffic over the first expressway bridge
[U/C] Re: North-South Motorway
The Northbound onramp over the current expressway main entry (opposite McDonalds) is really taking shape.
Also anyone know what this building will be used for? Situated between FMC - McDonalds on that side.
Sent from my iPhone using Tapatalk
Also anyone know what this building will be used for? Situated between FMC - McDonalds on that side.
Sent from my iPhone using Tapatalk
[U/C] Re: [U/C] Re: North-South Motorway
It will house ITS equipment and management for the project.Vasco wrote:The Northbound onramp over the current expressway main entry (opposite McDonalds) is really taking shape.
Also anyone know what this building will be used for? Situated between FMC - McDonalds on that side.
Sent from my iPhone using Tapatalk
[U/C] Re: North-South Motorway
Darlington traffic switch document:
https://www.infrastructure.sa.gov.au/__ ... flyer_.pdf
https://www.infrastructure.sa.gov.au/__ ... flyer_.pdf
[U/C] Re: North-South Motorway
Looking north (towards Pym St) from Torrens Rd over pass. Roadway has no bitumen at this time and side walls are not clad yet.
- Attachments
-
- 20180714_south rd 1.jpg (408.62 KiB) Viewed 4571 times
[U/C] Re: North-South Motorway
Looking south from Torrens Rd over pass . Bitumen stops just next to over pass.
- Attachments
-
- 20180714_south rd 2.jpg (310.08 KiB) Viewed 4570 times