COM: Glenelg Tramline Upgrade
- Bulldozer
- High Rise Poster!
- Posts: 451
- Joined: Wed Apr 11, 2007 11:00 am
- Location: Brisbane (nee Adelaide)
Re: Glenelg Tram Line Upgrade
Do you know if they modified the kerb or adjusted the "saggy" thingo on the trams?
Re: Glenelg Tram Line Upgrade
They took the expensive solution this time. Rather then adjust the lifeguard, they have removed about a metre or two of the median strip. They have already began marking out to a new alignment to suit the H class and should be done in a week or so (at a guess).
- Ho Really
- Super Size Scraper Poster!
- Posts: 2715
- Joined: Sun Aug 27, 2006 3:29 pm
- Location: In your head
Re: Glenelg Tram Line Upgrade
Will409 wrote:They took the expensive solution this time. Rather then adjust the lifeguard, they have removed about a metre or two of the median strip...
Cheers
Confucius say: Dumb man climb tree to get cherry, wise man spread limbs.
Re: Glenelg Tram Line Upgrade
H Types 367 & 351 made the run safely to City-West and back. Clearances measurements were made along the way and they shunted into both sides of City-West.
Bill
Here they are outside Adelaide railway station, headed west
Entering the single track section near Morphett St bridge
In the City-West terminus
In King William St on the way home. Success !
Bill
Here they are outside Adelaide railway station, headed west
Entering the single track section near Morphett St bridge
In the City-West terminus
In King William St on the way home. Success !
- Ho Really
- Super Size Scraper Poster!
- Posts: 2715
- Joined: Sun Aug 27, 2006 3:29 pm
- Location: In your head
Re: Glenelg Tram Line Upgrade
Excellent pics there BillD. Thanks.
Cheers
Cheers
Confucius say: Dumb man climb tree to get cherry, wise man spread limbs.
Re: Glenelg Tram Line Upgrade
Love those pics BillD. I saw this tram on the way home and thought that they might have been doing some more testing. Should have followed it along the track.
Sticking feathers up your butt does not make you a chicken
Re: Glenelg Tram Line Upgrade
its proberly been asked before but why is there that single track section under the morpett street bridge?
Re: Glenelg Tram Line Upgrade
I had a feeling that you would have been on site for this Bill, thanks greatly for the shots. If I had found out on Railpage even half an hour earlier then I did, I would have been there. Once I again, I thankyou greatly.
The reason why the single track section exists is to provide a turning lane to the Convention Centre and also to provide a crossover before the terminus. It was originally thought that the single track section was because of bridge clearances and the track currently goes under the highest part of the bridge.
The reason why the single track section exists is to provide a turning lane to the Convention Centre and also to provide a crossover before the terminus. It was originally thought that the single track section was because of bridge clearances and the track currently goes under the highest part of the bridge.
Re: Glenelg Tram Line Upgrade
Was about to say the same thing, looks very "cosmopolitan", sorry about the wanky word, but it does : ).. that little eatery on rundle mall looks reasonable busy for a thursday night too..That's a fantastic shot of Beehive Corner, by the way.
excellent shots bill!
Re: Glenelg Tram Line Upgrade
Well done Bill and thanks! You certainly know what you're doing with night time photography! Excellent!
cheers,
Rhino
Rhino
Re: Glenelg Tram Line Upgrade
yeh... but too bad theres the tram line barriers and the construction at the opal place.AtD wrote:That's a fantastic shot of Beehive Corner, by the way.
Who is online
Users browsing this forum: Ahrefs [Bot] and 2 guests