[COM] Renaissance Arcade | 132m | 40 Levels | Realm Apartments
-
- High Rise Poster!
- Posts: 121
- Joined: Wed Feb 21, 2018 11:57 am
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
Was a little quite over the long weekend (and extended holiday?)
Big orange thing going in (assuming concrete pump)
Big orange thing going in (assuming concrete pump)
-
- High Rise Poster!
- Posts: 121
- Joined: Wed Feb 21, 2018 11:57 am
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
Yup, that's a concrete pump. Putzmeister I think. Wouldn't be surprised if there's two of these for this project.
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
Just looking back on your last post. Looks to me like been quite busy, the form work has been removed from around the vertical on the r/h/s, the form work around the area that is facing into the arcade has been removed, the rear deck has dried and they have loaded all the stuff for the next floor on it, there is a good portion of the 2nd floor completed at the front. I'm only guessing as no expert but once the concrete pumps are in the slider would be getting close to moving. "whatstheirname" it might not be too long before you lose your birdseye view and we will all suffer as a result.whatstheirname wrote: ↑Thu Oct 04, 2018 12:55 pmWas a little quite over the long weekend (and extended holiday?)
Big orange thing going in (assuming concrete pump)
Construction46.jpg
Construction47.jpg
-
- High Rise Poster!
- Posts: 121
- Joined: Wed Feb 21, 2018 11:57 am
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
Hey normh... we are all dreading the day we lose our view... we want to move offices to another work site when this occurs
-
- High Rise Poster!
- Posts: 121
- Joined: Wed Feb 21, 2018 11:57 am
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
There was a fair bit of stuff going on today
-
- High Rise Poster!
- Posts: 121
- Joined: Wed Feb 21, 2018 11:57 am
-
- High Rise Poster!
- Posts: 121
- Joined: Wed Feb 21, 2018 11:57 am
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
may be you could rent the top floor of the Realm I reckon they have only sold 1 of the 2 penthouses - stand to be corrected. It only went for $5.2mil?? so the other one is available, should be a nice view from up there.whatstheirname wrote: ↑Thu Oct 04, 2018 2:22 pmHey normh... we are all dreading the day we lose our view... we want to move offices to another work site when this occurs
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
I was at the Realm site yesterday day and saw a line of concrete trucks on Pulteney, they were feeding a concrete pump in porters lane and pumping into the core. I would think the slider will move soon. I couldn’t see much from the ground and couldn’t find a way into the student building to get a view. Best I could do was Wilson car park. Photos you can see the concrete pump arm. The other one is just for interest with the Adelaidean crane behind.
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
Dwell looks disgusting. Poor residents with that view.
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
When I was looking at the crane, I was unable to see a "climbing" section. Does this mean the crane is already at max height? something over 132m. I could count what looked like 12 sections, including the yellow base section, if each section is 6m then it has a way to go, if each section is 12m then it is probably already at the correct height. does anyone have any ideas?
cheers
PS it doesn't look tall enough but may be I need to crane ( ) my neck a bit more.
cheers
PS it doesn't look tall enough but may be I need to crane ( ) my neck a bit more.
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
This crane would be lucky to be at 25% of its final height! A climbing collar can be added later. It's got a long way to go.normh wrote: ↑Sun Oct 07, 2018 5:08 pmWhen I was looking at the crane, I was unable to see a "climbing" section. Does this mean the crane is already at max height? something over 132m. I could count what looked like 12 sections, including the yellow base section, if each section is 6m then it has a way to go, if each section is 12m then it is probably already at the correct height. does anyone have any ideas?
cheers
PS it doesn't look tall enough but may be I need to crane ( ) my neck a bit more.
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
The crane was reported as 69 metres, the tallest freestanding crane of its type in March:Pikey wrote: ↑Sun Oct 07, 2018 5:52 pmThis crane would be lucky to be at 25% of its final height! A climbing collar can be added later. It's got a long way to go.normh wrote: ↑Sun Oct 07, 2018 5:08 pmWhen I was looking at the crane, I was unable to see a "climbing" section. Does this mean the crane is already at max height? something over 132m. I could count what looked like 12 sections, including the yellow base section, if each section is 6m then it has a way to go, if each section is 12m then it is probably already at the correct height. does anyone have any ideas?
cheers
PS it doesn't look tall enough but may be I need to crane ( ) my neck a bit more.
The Advertiser wrote:Builders of the $200 million Realm Adelaide, which will become Adelaide’s second tallest building when complete, have installed a 69m-tall crane on the Austin St site, behind Pulteney Street’s Mansions Apartments.
Realm Adelaide claim the structure, erected over two days, is the tallest freestanding multi-storey crane in Australia, capable of lifting up to 11 tonnes and is expected to being operating after Easter.
[COM] Re: Renaissance Arcade | 132m | 40 Levels | Realm Apartments
Thanks for that guys, only 1/2 the height (approx) of the ultimate building. wow that really helps me picture just how significant and the impact from the street this building will have to the view from North Tce, Pulteney street and the mall.SBD wrote: ↑Sun Oct 07, 2018 10:09 pmThe crane was reported as 69 metres, the tallest freestanding crane of its type in March:Pikey wrote: ↑Sun Oct 07, 2018 5:52 pmThis crane would be lucky to be at 25% of its final height! A climbing collar can be added later. It's got a long way to go.normh wrote: ↑Sun Oct 07, 2018 5:08 pmWhen I was looking at the crane, I was unable to see a "climbing" section. Does this mean the crane is already at max height? something over 132m. I could count what looked like 12 sections, including the yellow base section, if each section is 6m then it has a way to go, if each section is 12m then it is probably already at the correct height. does anyone have any ideas?
cheers
PS it doesn't look tall enough but may be I need to crane ( ) my neck a bit more.The Advertiser wrote:Builders of the $200 million Realm Adelaide, which will become Adelaide’s second tallest building when complete, have installed a 69m-tall crane on the Austin St site, behind Pulteney Street’s Mansions Apartments.
Realm Adelaide claim the structure, erected over two days, is the tallest freestanding multi-storey crane in Australia, capable of lifting up to 11 tonnes and is expected to being operating after Easter.
Who is online
Users browsing this forum: Ahrefs [Bot] and 3 guests