Eurostar wrote: ↑Sat Dec 22, 2018 8:23 pm
In the original plan wasn't there direct access from OTR Bolivar to the Northern Connector Southbound?
That seems to be true in the diagram at
https://infrastructure.sa.gov.au/nsc/no ... hange_maps but it's hard to tell as that diagram doesn't show height differences.
It's hard to tell whether that will still be what is being built. At the moment, Hodgson Road is still the access road into the Bolivar water treatment site, and the new access is not shown on the interchange plan
-
Hooligan
- Legendary Member!
- Posts: 906
- Joined: Tue Jul 28, 2009 8:03 pm
#707
Post
by Hooligan » Fri Dec 28, 2018 6:01 am
There are signs up saying the Port River Expressway will be closed from the 11th of January until the 14th of January.
I can only assume this will be to put the road bridge over the expressway in place.
-
ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
-
Contact:
#708
Post
by ChillyPhilly » Fri Dec 28, 2018 6:42 am
Hooligan wrote:There are signs up saying the Port River Expressway will be closed from the 11th of January until the 14th of January.
I can only assume this will be to put the road bridge over the expressway in place.
Correctamundo.
Our state, our city, our future.
All views expressed on this forum are my own.
-
Bacon
- High Rise Poster!
- Posts: 119
- Joined: Tue Oct 15, 2013 1:17 pm
#710
Post
by Bacon » Sun Jan 13, 2019 9:55 am
I noticed they are reclaiming a heap of land over on the Port Wakefield Rd side of the salt pans, does this have anything to do with the NC project?
-
mawsonguy
- High Rise Poster!
- Posts: 198
- Joined: Fri Dec 20, 2013 8:11 am
#711
Post
by mawsonguy » Sun Jan 13, 2019 12:59 pm
Bacon wrote: ↑Sun Jan 13, 2019 9:55 am
I noticed they are reclaiming a heap of land over on the Port Wakefield Rd side of the salt pans, does this have anything to do with the NC project?
They've been doing it for about 6 months now. Doesn't appear to be any connection to the Northern Connector. They appear to be reclaiming the land by raising it up to the level of the embankments and levelling it. Now idea where they are getting the dirt from.
-
Eurostar
- Legendary Member!
- Posts: 954
- Joined: Thu Jun 24, 2010 3:44 pm
#712
Post
by Eurostar » Sun Jan 13, 2019 1:06 pm
mawsonguy wrote: ↑Sun Jan 13, 2019 12:59 pm
Bacon wrote: ↑Sun Jan 13, 2019 9:55 am
I noticed they are reclaiming a heap of land over on the Port Wakefield Rd side of the salt pans, does this have anything to do with the NC project?
They've been doing it for about 6 months now. Doesn't appear to be any connection to the Northern Connector. They appear to be reclaiming the land by raising it up to the level of the embankments and levelling it. Now idea where they are getting the dirt from.
Getting it ready to sell the land to a land developer maybe, I am sure Lend Lease could make a nice suburb out of it , they did a good job transforming The Levels swamp into a successful suburb
-
mawsonguy
- High Rise Poster!
- Posts: 198
- Joined: Fri Dec 20, 2013 8:11 am
#713
Post
by mawsonguy » Sun Jan 13, 2019 5:30 pm
Eurostar wrote: ↑Sun Jan 13, 2019 1:06 pm
Getting it ready to sell the land to a land developer maybe, I am sure Lend Lease could make a nice suburb out of it , they did a good job transforming The Levels swamp into a successful suburb
It's only a very small part of the land. For reclamation projects it's normally left to the developer (e.g. Delfin\Lend Lease) to reclaim the land as they dig out lakes etc to provide the fill for the building blocks. The conceptual drawings I've seen for the salt pans development show a large lake, connected to the ocean, in the middle.
I suspect that what is happening is that the owner is reclaiming a small section to sell as industrial allotments to provide cashflow until the residential project kicks off. Getting planning approval for a few industrial allotments along Port Wakefield Rd is going to take a lot less time than the approval process for the residential development. Also, the residential market is soft at the moment.
-
Goodsy
- Legendary Member!
- Posts: 1107
- Joined: Thu Jul 18, 2013 10:39 am
#714
Post
by Goodsy » Sun Jan 13, 2019 6:04 pm
mawsonguy wrote: ↑Sun Jan 13, 2019 5:30 pm
Eurostar wrote: ↑Sun Jan 13, 2019 1:06 pm
Getting it ready to sell the land to a land developer maybe, I am sure Lend Lease could make a nice suburb out of it , they did a good job transforming The Levels swamp into a successful suburb
It's only a very small part of the land. For reclamation projects it's normally left to the developer (e.g. Delfin\Lend Lease) to reclaim the land as they dig out lakes etc to provide the fill for the building blocks. The conceptual drawings I've seen for the salt pans development show a large lake, connected to the ocean, in the middle.
I suspect that what is happening is that the owner is reclaiming a small section to sell as industrial allotments to provide cashflow until the residential project kicks off. Getting planning approval for a few industrial allotments along Port Wakefield Rd is going to take a lot less time than the approval process for the residential development. Also, the residential market is soft at the moment.
If there's going to be an Industrial estate in the Salt Pan development then hopefully the Globe Derby Dr interchange goes ahead
-
Eurostar
- Legendary Member!
- Posts: 954
- Joined: Thu Jun 24, 2010 3:44 pm
#715
Post
by Eurostar » Sun Jan 13, 2019 6:48 pm
mawsonguy wrote: ↑Sun Jan 13, 2019 5:30 pm
Eurostar wrote: ↑Sun Jan 13, 2019 1:06 pm
Getting it ready to sell the land to a land developer maybe, I am sure Lend Lease could make a nice suburb out of it , they did a good job transforming The Levels swamp into a successful suburb
It's only a very small part of the land. For reclamation projects it's normally left to the developer (e.g. Delfin\Lend Lease) to reclaim the land as they dig out lakes etc to provide the fill for the building blocks. The conceptual drawings I've seen for the salt pans development show a large lake, connected to the ocean, in the middle.
I suspect that what is happening is that the owner is reclaiming a small section to sell as industrial allotments to provide cashflow until the residential project kicks off. Getting planning approval for a few industrial allotments along Port Wakefield Rd is going to take a lot less time than the approval process for the residential development. Also, the residential market is soft at the moment.
On second thoughts Lend Lease will most likely continue expanding Blakes Crossing.
-
Goodsy
- Legendary Member!
- Posts: 1107
- Joined: Thu Jul 18, 2013 10:39 am
#716
Post
by Goodsy » Sun Jan 13, 2019 7:04 pm
Eurostar wrote: ↑Sun Jan 13, 2019 6:48 pm
mawsonguy wrote: ↑Sun Jan 13, 2019 5:30 pm
Eurostar wrote: ↑Sun Jan 13, 2019 1:06 pm
Getting it ready to sell the land to a land developer maybe, I am sure Lend Lease could make a nice suburb out of it , they did a good job transforming The Levels swamp into a successful suburb
It's only a very small part of the land. For reclamation projects it's normally left to the developer (e.g. Delfin\Lend Lease) to reclaim the land as they dig out lakes etc to provide the fill for the building blocks. The conceptual drawings I've seen for the salt pans development show a large lake, connected to the ocean, in the middle.
I suspect that what is happening is that the owner is reclaiming a small section to sell as industrial allotments to provide cashflow until the residential project kicks off. Getting planning approval for a few industrial allotments along Port Wakefield Rd is going to take a lot less time than the approval process for the residential development. Also, the residential market is soft at the moment.
On second thoughts Lend Lease will most likely continue expanding Blakes Crossing.
They are expanding is right now, in fact they're using the Northhub to hire people for Blakes Crossing
http://northhub.sa.gov.au/jobtools/jncu ... rchResults
-
mawsonguy
- High Rise Poster!
- Posts: 198
- Joined: Fri Dec 20, 2013 8:11 am
#717
Post
by mawsonguy » Mon Jan 14, 2019 7:57 am
Goodsy wrote: ↑Sun Jan 13, 2019 6:04 pm
If there's going to be an Industrial estate in the Salt Pan development then hopefully the Globe Derby Dr interchange goes ahead
I cannot see that happening until Elder Smith Rd is extended from Salisbury Highway to Port Wakefield Rd and widened to 4 lanes. Whilst that is in the forward 15 year plan there is no sign of it happening any time soon.
-
ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
-
Contact:
#719
Post
by ChillyPhilly » Thu Jan 24, 2019 10:09 pm
Snapped around 6pm.
Our state, our city, our future.
All views expressed on this forum are my own.
-
mawsonguy
- High Rise Poster!
- Posts: 198
- Joined: Fri Dec 20, 2013 8:11 am
#720
Post
by mawsonguy » Mon Jan 28, 2019 11:24 am
I found these photos on a DPTI website which were taken on 12 January 2019. The first is intersting as it clearly shows the alignment through the interchange of the northern connector, northbound to eastbound off ramp and the eastbound to southbound on ramp. The second shows that the northern support of the existing off\on ramp bridge is smack in the middle of the new alignment for the PREXY. That bridge will probably have to be demolished - what a waste of taxpayers money!