[COM] 89-109 Gray Street | 59m | 17 Levels | Student Accom

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#196 Post by EBG » Sat Nov 03, 2018 3:57 pm

View of the east side from Elizabeth St (2 streets to the east of Gray St. 3/11/18
Attachments
20181103_gray st.jpg
20181103_gray st.jpg (292.69 KiB) Viewed 6888 times

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#197 Post by EBG » Fri Nov 16, 2018 5:29 pm

More steel added today. Some idea of final height can be judged by 2 steel columns on left hand side of picture 16/11/2018.
Attachments
20181116_Gray st.jpg
20181116_Gray st.jpg (286.91 KiB) Viewed 6625 times

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#198 Post by EBG » Sun Nov 25, 2018 5:21 pm

A view from northern end. Still making good progress.
Attachments
20181125_GRAY ST.jpg
20181125_GRAY ST.jpg (171.52 KiB) Viewed 6422 times

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#199 Post by EBG » Tue Dec 04, 2018 2:50 pm

Update 4/12/2018; View from Waymouth St with both cranes working on Steel work.
Attachments
20181204_gray st 1.jpg
20181204_gray st 1.jpg (332.84 KiB) Viewed 6151 times

Nort
Super Size Scraper Poster!
Posts: 2296
Joined: Tue Feb 09, 2010 2:08 pm

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#200 Post by Nort » Tue Dec 04, 2018 4:25 pm

EBG wrote:
Tue Dec 04, 2018 2:50 pm
Update 4/12/2018; View from Waymouth St with both cranes working on Steel work.
You took this about 7.45pm last night right? ;)

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#201 Post by EBG » Tue Dec 04, 2018 9:21 pm

Not quite. it was actually taken today at 16 min 32 sec after 1 pm the shot original is labelled 2018 12 4 13 16.32
Regards EBG.
Last edited by EBG on Wed Dec 05, 2018 5:56 am, edited 3 times in total.

Nort
Super Size Scraper Poster!
Posts: 2296
Joined: Tue Feb 09, 2010 2:08 pm

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#202 Post by Nort » Tue Dec 04, 2018 10:18 pm

EBG wrote:
Tue Dec 04, 2018 9:21 pm
Not quite. it was actually taken today at 16 min 32 sec after 1pm. the original shot is labelled 2018 12 4 131632
regards EBG.
Ah ok, saw someone taking a photo with tripod and everything from around that spot last night as well, assumed it was a poster from here :D

borsac
Sen-Rookie-Sational
Posts: 10
Joined: Wed Oct 24, 2018 10:02 am

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#203 Post by borsac » Wed Dec 05, 2018 3:56 pm

Heard a guy on 5AA Radio saying Synergy were pumping their toilets into an open drain. John Blake from "Behind Closed Doors" even made a skit about it. Quite funny.

https://www.facebook.com/1395FIVEaa/vid ... 355115033/

User avatar
Algernon
Super Size Scraper Poster!
Posts: 1629
Joined: Sat Jul 09, 2005 9:46 pm
Location: Moravia

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#204 Post by Algernon » Thu Dec 06, 2018 4:52 am

Can't quote the pic from post, but link here:

https://www.sensational-adelaide.com/fo ... 95#p175243

Just me, or have they screwed up something chronic on the patterning of the facade on the top right?

Listy
High Rise Poster!
Posts: 195
Joined: Sat Oct 01, 2016 11:07 pm

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#205 Post by Listy » Thu Dec 06, 2018 7:42 am

Algernon wrote:
Thu Dec 06, 2018 4:52 am
Can't quote the pic from post, but link here:

https://www.sensational-adelaide.com/fo ... 95#p175243

Just me, or have they screwed up something chronic on the patterning of the facade on the top right?
Do you mean the cafe wall illusion effect? https://en.wikipedia.org/wiki/Caf%C3%A9_wall_illusion. It's painful to look at. Or the two windows on top of each other? - which seems like a big stuff up if not corrected ...

borsac
Sen-Rookie-Sational
Posts: 10
Joined: Wed Oct 24, 2018 10:02 am

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#206 Post by borsac » Thu Dec 06, 2018 9:06 am

Word in the industry is this project is a couple of months behind schedule... Crane problems and now on their 4th or 5th site manager!

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#207 Post by EBG » Tue Dec 11, 2018 2:48 pm

Update 11/12/2018 a view from western approach to city . While Borsac claims this project is a couple of months behind they have still made good progress in the last month compare with the picture from 16/11/2018 above.
Attachments
20181211_gray st 2.jpg
20181211_gray st 2.jpg (377.63 KiB) Viewed 5492 times

User avatar
Algernon
Super Size Scraper Poster!
Posts: 1629
Joined: Sat Jul 09, 2005 9:46 pm
Location: Moravia

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#208 Post by Algernon » Tue Dec 11, 2018 5:23 pm

When I was doing Henley Beach runs on the Adelaide Metro, I probably picked up one person per year at that first stop on Currie St. With that building up the drivers will now get swamped!

JAM
Sen-Rookie-Sational
Posts: 8
Joined: Mon Jul 09, 2018 3:38 pm

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#209 Post by JAM » Thu Dec 20, 2018 11:56 am

Quite possibly the slowest Multistorey project to be built in Adelaide in recent time, floor cycles are out to 20 day cycles!
Superstructure started March 2018…Was due for completion in December 18 and they still haven’t topped out yet and will miss the 2019 Uni intake…. Ouch for the developer of Student Accommodation.
Builder blames ‘extreme weather conditions’, that hasn’t stopped Adelaidean or Realm which are cruising at 6 to 7 day floor cycles.
231-243 Waymouth Street | 55m | 17lvls | Student Accom - Blue Sky Level 1 to Level 17 took 8 months to top out
228-231 North Terrace | 68m | 21 Levels | Student Accom Urbanest Level 1 to Level 21 took 7 months to top out

SBD
Super Size Scraper Poster!
Posts: 2723
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview

[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom

#210 Post by SBD » Thu Dec 20, 2018 12:22 pm

JAM wrote:
Thu Dec 20, 2018 11:56 am
Quite possibly the slowest Multistorey project to be built in Adelaide in recent time, floor cycles are out to 20 day cycles!
Superstructure started March 2018…Was due for completion in December 18 and they still haven’t topped out yet and will miss the 2019 Uni intake…. Ouch for the developer of Student Accommodation.
Builder blames ‘extreme weather conditions’, that hasn’t stopped Adelaidean or Realm which are cruising at 6 to 7 day floor cycles.
231-243 Waymouth Street | 55m | 17lvls | Student Accom - Blue Sky Level 1 to Level 17 took 8 months to top out
228-231 North Terrace | 68m | 21 Levels | Student Accom Urbanest Level 1 to Level 21 took 7 months to top out
The project seems to have had quite a bit of crane trouble. I don't know if that related to "extreme weather". This site would be far more exposed to westerly winds than the others you mentioned.