[COM] 89-109 Gray Street | 59m | 17 Levels | Student Accom
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
View of the east side from Elizabeth St (2 streets to the east of Gray St. 3/11/18
- Attachments
-
- 20181103_gray st.jpg (292.69 KiB) Viewed 6883 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
More steel added today. Some idea of final height can be judged by 2 steel columns on left hand side of picture 16/11/2018.
- Attachments
-
- 20181116_Gray st.jpg (286.91 KiB) Viewed 6620 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
A view from northern end. Still making good progress.
- Attachments
-
- 20181125_GRAY ST.jpg (171.52 KiB) Viewed 6417 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Update 4/12/2018; View from Waymouth St with both cranes working on Steel work.
- Attachments
-
- 20181204_gray st 1.jpg (332.84 KiB) Viewed 6146 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
You took this about 7.45pm last night right?
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Not quite. it was actually taken today at 16 min 32 sec after 1 pm the shot original is labelled 2018 12 4 13 16.32
Regards EBG.
Regards EBG.
Last edited by EBG on Wed Dec 05, 2018 5:56 am, edited 3 times in total.
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Ah ok, saw someone taking a photo with tripod and everything from around that spot last night as well, assumed it was a poster from here
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Heard a guy on 5AA Radio saying Synergy were pumping their toilets into an open drain. John Blake from "Behind Closed Doors" even made a skit about it. Quite funny.
https://www.facebook.com/1395FIVEaa/vid ... 355115033/
https://www.facebook.com/1395FIVEaa/vid ... 355115033/
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Can't quote the pic from post, but link here:
https://www.sensational-adelaide.com/fo ... 95#p175243
Just me, or have they screwed up something chronic on the patterning of the facade on the top right?
https://www.sensational-adelaide.com/fo ... 95#p175243
Just me, or have they screwed up something chronic on the patterning of the facade on the top right?
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Do you mean the cafe wall illusion effect? https://en.wikipedia.org/wiki/Caf%C3%A9_wall_illusion. It's painful to look at. Or the two windows on top of each other? - which seems like a big stuff up if not corrected ...Algernon wrote: ↑Thu Dec 06, 2018 4:52 amCan't quote the pic from post, but link here:
https://www.sensational-adelaide.com/fo ... 95#p175243
Just me, or have they screwed up something chronic on the patterning of the facade on the top right?
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Word in the industry is this project is a couple of months behind schedule... Crane problems and now on their 4th or 5th site manager!
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Update 11/12/2018 a view from western approach to city . While Borsac claims this project is a couple of months behind they have still made good progress in the last month compare with the picture from 16/11/2018 above.
- Attachments
-
- 20181211_gray st 2.jpg (377.63 KiB) Viewed 5487 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
When I was doing Henley Beach runs on the Adelaide Metro, I probably picked up one person per year at that first stop on Currie St. With that building up the drivers will now get swamped!
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Quite possibly the slowest Multistorey project to be built in Adelaide in recent time, floor cycles are out to 20 day cycles!
Superstructure started March 2018…Was due for completion in December 18 and they still haven’t topped out yet and will miss the 2019 Uni intake…. Ouch for the developer of Student Accommodation.
Builder blames ‘extreme weather conditions’, that hasn’t stopped Adelaidean or Realm which are cruising at 6 to 7 day floor cycles.
231-243 Waymouth Street | 55m | 17lvls | Student Accom - Blue Sky Level 1 to Level 17 took 8 months to top out
228-231 North Terrace | 68m | 21 Levels | Student Accom Urbanest Level 1 to Level 21 took 7 months to top out
Superstructure started March 2018…Was due for completion in December 18 and they still haven’t topped out yet and will miss the 2019 Uni intake…. Ouch for the developer of Student Accommodation.
Builder blames ‘extreme weather conditions’, that hasn’t stopped Adelaidean or Realm which are cruising at 6 to 7 day floor cycles.
231-243 Waymouth Street | 55m | 17lvls | Student Accom - Blue Sky Level 1 to Level 17 took 8 months to top out
228-231 North Terrace | 68m | 21 Levels | Student Accom Urbanest Level 1 to Level 21 took 7 months to top out
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
The project seems to have had quite a bit of crane trouble. I don't know if that related to "extreme weather". This site would be far more exposed to westerly winds than the others you mentioned.JAM wrote: ↑Thu Dec 20, 2018 11:56 amQuite possibly the slowest Multistorey project to be built in Adelaide in recent time, floor cycles are out to 20 day cycles!
Superstructure started March 2018…Was due for completion in December 18 and they still haven’t topped out yet and will miss the 2019 Uni intake…. Ouch for the developer of Student Accommodation.
Builder blames ‘extreme weather conditions’, that hasn’t stopped Adelaidean or Realm which are cruising at 6 to 7 day floor cycles.
231-243 Waymouth Street | 55m | 17lvls | Student Accom - Blue Sky Level 1 to Level 17 took 8 months to top out
228-231 North Terrace | 68m | 21 Levels | Student Accom Urbanest Level 1 to Level 21 took 7 months to top out
Who is online
Users browsing this forum: No registered users and 6 guests