Re: Crane Counter: CBD 13 | Metro 3| Total 16

#1441 Post by EBG » Sat Mar 30, 2019 6:11 pm

The market St crane is nearly complete except for stringing up some cables.at 5 pm Sat 30/3/2019. This crane was previously at the urbanest site in synagogue place.
Attachments
20190330_Market St.jpg
Last edited by EBG on Sat Mar 30, 2019 6:16 pm, edited 1 time in total.

EBG
Super Size Scraper Poster!
Posts: 3142
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 13 | Metro 3| Total 16

#1442 Post by EBG » Sat Mar 30, 2019 6:15 pm

The U2 crane was still at the tower stage at 5 pm Sat 30/3/2019, with the rest of the crane beam assembled in Waymouth St on the ground.
Attachments
20190330_U2 crane 1.jpg
20190330_U2 crane 2.jpg

EBG
Super Size Scraper Poster!
Posts: 3142
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 13 | Metro 3| Total 16

#1443 Post by EBG » Sat Mar 30, 2019 6:20 pm

The Frome St crane has got the climbing frame attached near the top of the tower so it could gain in height very soon. 30/3/2019
Attachments
20190330_Adelaidean.jpg

EBG
Super Size Scraper Poster!
Posts: 3142
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 13 | Metro 3| Total 16

#1444 Post by EBG » Sun Mar 31, 2019 3:36 pm

The U2 crane nearly complete.
Attachments
20190331_u2.jpg

EBG
Super Size Scraper Poster!
Posts: 3142
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 13 | Metro 3| Total 16

#1445 Post by EBG » Sun Mar 31, 2019 3:39 pm

The Frome St crane has definitely gained height. Also the Realm lift core is just visible behind the student tower in Synagogue place. Click on picture for Bigger.
Attachments
20190331_frome st.jpg
Last edited by EBG on Sat Apr 13, 2019 10:37 pm, edited 1 time in total.

User avatar
phenom
High Rise Poster!
Posts: 480
Joined: Wed May 16, 2007 1:12 pm
Location: Adelaide CBD

Re: Crane Counter: CBD 13 | Metro 3| Total 16

#1446 Post by phenom » Sun Mar 31, 2019 4:46 pm

This didn't work as well as I thought it would :roll: but was intended to show the deconstruct of the crane at UCity and the U2 reconstruct.
ucity-u2-craneswap.png

User avatar
phenom
High Rise Poster!
Posts: 480
Joined: Wed May 16, 2007 1:12 pm
Location: Adelaide CBD

Re: Crane Counter: CBD 13 | Metro 3| Total 16

#1447 Post by phenom » Sun Mar 31, 2019 4:48 pm

Also: Market St crane on 31/3/2019
market street crane.jpg

Smithy85
High Rise Poster!
Posts: 274
Joined: Mon Jan 26, 2015 11:31 am

Re: Crane Counter: CBD 13 | Metro 3| Total 16

#1448 Post by Smithy85 » Sun Mar 31, 2019 6:53 pm

We all (me included) keep calling the Waymouth development “U2”. Isn’t it called something else now?

Ben
VIP Member
VIP Member
Posts: 7574
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

Re: Crane Counter: CBD 13 | Metro 3| Total 16

#1449 Post by Ben » Sun Mar 31, 2019 7:31 pm

Smithy85 wrote:
Sun Mar 31, 2019 6:53 pm
We all (me included) keep calling the Waymouth development “U2”. Isn’t it called something else now?
I believe its a hotel but no official press release yet.

EBG
Super Size Scraper Poster!
Posts: 3142
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 14 | Metro 3| Total 17

#1450 Post by EBG » Sun Mar 31, 2019 9:52 pm

U2.2

Jaymz
Legendary Member!
Posts: 1033
Joined: Sat Mar 22, 2014 5:12 pm

Re: Crane Counter: CBD 14 | Metro 3| Total 17

#1451 Post by Jaymz » Sat Apr 06, 2019 8:37 am

While the number of CBD cranes hasn't really increased over the past couple of years, it's still encouraging to at least see them moving to a new project upon completion of a previous development.

When I was living in Adelaide during the mid to late 90's, I recall going for months, even a year or 2 without a single crane on the skyline.

jackfire
Sen-Rookie-Sational
Posts: 13
Joined: Tue Oct 14, 2008 12:23 pm

Re: Crane Counter: CBD 14 | Metro 3| Total 17

#1452 Post by jackfire » Sat Apr 13, 2019 4:31 pm

Crane went up today in the vicinity of 248 South Terrace and student accommodation 89 Gray Street crane coming down.

EBG
Super Size Scraper Poster!
Posts: 3142
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 14 | Metro 3| Total 17

#1453 Post by EBG » Sat Apr 13, 2019 8:08 pm

The Gray St crane is 1/2 down, the tower sections will come down tomorrow. The South Tce crane is in line with Glen Osmond Rd.

EBG
Super Size Scraper Poster!
Posts: 3142
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 14 | Metro 3| Total 17

#1454 Post by EBG » Sat Apr 13, 2019 10:40 pm

This is a small apartment project consisting of Ground floor car park, 6 levels of apartments plus roof top BBQ area.

EBG
Super Size Scraper Poster!
Posts: 3142
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 14 | Metro 3| Total 17

#1455 Post by EBG » Sat Apr 13, 2019 10:59 pm

252 South Tce. There is actually only one Large apartment per floor.