[U/C] M2 North-South Motorway
-
- Legendary Member!
- Posts: 1233
- Joined: Thu Jan 24, 2013 1:26 am
[U/C] Re: North-South Motorway
Shotcrete is most effective when used in conjunction with rock or soil anchors. So that’s the area I would be looking at to see if it was adequate & done correctly.
I compare what’s happened to the icing of a cake shearing off from the alcohol soaked sponge.
I compare what’s happened to the icing of a cake shearing off from the alcohol soaked sponge.
[U/C] Re: North-South Motorway
Rev, the conditions you describe are not unusual anywhere in Australia. Months of parched dry weather followed by torrential downpours is common both here in Perth, and in many places on the east coast. It shouldn't render a road project held up for the duration of the rainy season. Fair enough, they may have been caught by a surprise overnight downpour, but surely they had an eye on the forecast prior to the pour. I am not aware of this being an issue on the T2T section, despite 3 years of Adelaide weather both wet and dry to contend with.rev wrote: ↑Wed May 08, 2019 11:54 amYou still in Perth? because you obviously don't know how dry the grounds been until the recent rains.claybro wrote: ↑Wed May 08, 2019 10:45 amSurely this is not being blamed on rain alone? Even the heaviest of showers in Adelaide are comparatively mild with other regions. If a spell of Adelaide showers has rendered this work unsuitable, then surely the method is at fault, not the weather? Also, if the method is generally sound, it should not have to wait until the end of the rain season to complete the work. I would have thought a forecast of a few fine days should suffice.
9.0mm in February 40 year average is 15.9mm
8.2mm in March 40 year average is 27.4mm
5.4mm in April 40 year average is 39.6mm
So far in May we've had 45.4mm over five days of rain, and the average for May is 61.4mm. There's up to 20mm of rain forecast for tomorrow and a further five over the following days.
I'm not suggesting the rains got anything to do with whats happening, but we're talking about months of well below average rainfall, and beyond parched soil.
45 mm of rain might not be a big deal in other parts of Australia, but they don't have the conditions we do either. It's all relative.
-
- High Rise Poster!
- Posts: 299
- Joined: Sat Mar 11, 2006 1:02 am
- Location: Adelaide (Hallett Cove)
[U/C] Re: North-South Motorway
I would say this issue will cause lengthy delays to the project timeline. they won't be opening the trench anytime soon as was originally planned.
[U/C] Re: North-South Motorway
I'm merely responding to your comment about the implied insignificance of the recent rains we've had. I'm not suggesting it caused the problems down south. 45mm of rain over a few days is very significant for a place considered to be the driest state.claybro wrote: ↑Wed May 08, 2019 12:44 pmRev, the conditions you describe are not unusual anywhere in Australia. Months of parched dry weather followed by torrential downpours is common both here in Perth, and in many places on the east coast. It shouldn't render a road project held up for the duration of the rainy season. Fair enough, they may have been caught by a surprise overnight downpour, but surely they had an eye on the forecast prior to the pour. I am not aware of this being an issue on the T2T section, despite 3 years of Adelaide weather both wet and dry to contend with.
[U/C] Re: North-South Motorway
My guess is that the trench cut across an aquifer/spring or porous earth/rock that was dry at the time, so they have used shotcrete without sufficient drainage behind it. The rain has filled the aquifer and water pressure has pushed the cladding off the wall where the water was running out.claybro wrote: ↑Wed May 08, 2019 10:45 amSurely this is not being blamed on rain alone? Even the heaviest of showers in Adelaide are comparatively mild with other regions. If a spell of Adelaide showers has rendered this work unsuitable, then surely the method is at fault, not the weather? Also, if the method is generally sound, it should not have to wait until the end of the rain season to complete the work. I would have thought a forecast of a few fine days should suffice.
I live on the high side of a street, and did not realise I had a water leak in my front garden from a damaged pipe when we moved in, but had noticed there seemed to always be a pool of water near the front door of the house under construction across the street. That house has cut down over a metre to make the pad. When we eventually found and fixed our leak, the water across the road dried up. There was no visible indication that our water was crossing the street, so it must have been moving through the earth/rock and coming out where the excavation had been done for the other house. It demonstrated why you have to have ag-pipe and gravel behind and at the bottom of a retaining wall.
[U/C] Re: North-South Motorway
Just on the news now.
Transport minister says water has gotten in behind the shotcrete and caused soil to move. Landslide basically.
Transport minister says water has gotten in behind the shotcrete and caused soil to move. Landslide basically.
[U/C] Re: North-South Motorway
Another stuff up by the state government, honestly DPTI is full of idiots.
-
- High Rise Poster!
- Posts: 299
- Joined: Sat Mar 11, 2006 1:02 am
- Location: Adelaide (Hallett Cove)
[U/C] Re: North-South Motorway
I'm tipping they'll have to start the entire wall from scratch and use pre cast, any smart people out there suggest what might need to happen?
Sent from my SM-G935F using Tapatalk
Sent from my SM-G935F using Tapatalk
-
- High Rise Poster!
- Posts: 380
- Joined: Mon Dec 14, 2015 7:31 pm
[U/C] Re: North-South Motorway
Isn't that the case for all government departments? So much waste of our money.
Follow me on Flickr
http://www.flickr.com/photos/135625678@N06/
http://www.flickr.com/photos/135625678@N06/
[U/C] Re: North-South Motorway
Looking at the news clip tonight there appeared to be some precast already going over some of the spray on. Wondering if the spay on was just going to hold the bank to the precast covered it. Surprised if it the spray on was to be the permanent fix with out mesh in it.aceman wrote:I'm tipping they'll have to start the entire wall from scratch and use pre cast, any smart people out there suggest what might need to happen?
Sent from my SM-G935F using Tapatalk
Sent from my iPad using Tapatalk
[U/C] Re: North-South Motorway
[U/C] Re: North-South Motorway
I am sorry but I don't accept that argument. DPTI shouldn't be contracting work out to a business that isn't professional.
They will now need to remove all of the shortcrete causing major delays to the project. Royal Adelaide Hospital type
problems all over again.