There's probably not enough traffic to justify the cost of another bridge. A right turn from PWR to the NEXY would require a huge flyover.SBD wrote: ↑Sat Apr 06, 2019 11:45 amI was thinking of traffic originating around the Parafield Gardens, Paralowie, Burton area, and also coming from Cavan and Gepps Cross that would not have come through Wingfield, but would be on Port Wakefield Road not Main North Road.Goodsy wrote: ↑Sat Apr 06, 2019 11:32 amI dont think there is a northbound onramp to get from PWR to the NEXY. Most the current traffic that turns right from PWR to the NEXY would instead already have gotten onto the NC at Wingfield.SBD wrote: ↑Fri Apr 05, 2019 8:58 pm
Once the northern interchange is finished, what will be the way to get from Port Wakefield Road northbound onto the Northern Expressway? Is it going to require turning left at Waterloo Corner Road then onto the NC from there, or will there be a final onramp I have missed seeing?
Is there any benefit in doing that intermediate switch at the southern interchange, rather than finish the complete build of the new north->east ramp and switch to that? That bridge over the NC seems to be getting a fair push of effort too.
[COM] M2 Northern Connector | 15.5km | $867m
[COM] Re: Northern Connector | 14km | $1b
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: Northern Connector | 14km | $1b
AFAIK you are correct. No acces to NEXY from PWR northbound.SBD wrote: ↑Fri Apr 05, 2019 8:58 pmOnce the northern interchange is finished, what will be the way to get from Port Wakefield Road northbound onto the Northern Expressway? Is it going to require turning left at Waterloo Corner Road then onto the NC from there, or will there be a final onramp I have missed seeing?aaronjameslange wrote: ↑Fri Apr 05, 2019 8:28 pmPortable signage at northern interchange stating the NEXY onramp closed from 7pm-7am 10th-12th april IIRC
Probably switching to new temporary onramp before easter weekend
Also at southern interchange looks like they're gearing up to use the new PREXY Eastbound -Superway Southbound onramp as at temporary Superway- Salisbury Highway offramp
This would then allow northbound superway traffic to use the new PREXY bridge so that the old bridge and abutments can be removed to allow PREXY to be widened.
Is there any benefit in doing that intermediate switch at the southern interchange, rather than finish the complete build of the new north->east ramp and switch to that? That bridge over the NC seems to be getting a fair push of effort too.
At the new waterloo corner interchange there are covered up signs saying 'to M2' directing people to use the waterloo corner overpass to access NEXY.
The opposite is also true. Southbound NEXY traffic will be able to exit to PWR at the northern interchange but NOT at the Waterloo corner road intersection.
I agree with you regarding the southern interchange, but the onramp is already bitumised and streetlights are being put up whereas the flyover offramp is still a way off.
-
- Super Size Scraper Poster!
- Posts: 2148
- Joined: Fri Dec 08, 2006 3:10 am
- Location: Christies Beach
[COM] Re: Northern Connector | 14km | $1b
Surely a loop (cloverleaf style) would be sufficient?Goodsy wrote:There's probably not enough traffic to justify the cost of another bridge. A right turn from PWR to the NEXY would require a huge flyover.
Any idea when this road will open?
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.
- Heardy_101
- High Rise Poster!
- Posts: 127
- Joined: Mon Mar 05, 2012 11:26 am
- Contact:
[COM] Re: Northern Connector | 14km | $1b
I find that bizzare to be honest. Why not keep the current onramp from PWR to the NEXY? I thought that interchange was deliberately designed so that there was room for that current slip lane plus the Northern Connector.
I hope this doesn't become another "Trams Can't Turn Right" controversy
I hope this doesn't become another "Trams Can't Turn Right" controversy
www.facebook.com/SARegionalRailAlliance
www.saregionaltrainscampaign.com
www.saregionaltrainscampaign.com
[COM] Re: Northern Connector | 14km | $1b
The current on ramp crosses the future southbound northern connector at grade, so can’t stay as it is. Over the bridge then a loop would be simplest and easiest to retrofit if needed later. Taking the “temporary” on ramp under the southbound carriageway would be best design I think.Heardy_101 wrote: ↑Sat Apr 06, 2019 8:16 pmI find that bizzare to be honest. Why not keep the current onramp from PWR to the NEXY? I thought that interchange was deliberately designed so that there was room for that current slip lane plus the Northern Connector.
I hope this doesn't become another "Trams Can't Turn Right" controversy
[COM] Re: Northern Connector | 14km | $1b
I was thinking of branching off of the northbound PWR and going under the "Northern Connector" label, swinging right as it passed under the southbound carriageway, then rising to join the right side of the northbound carriageway before it passes under the PWR bridge.
It's possible that would introduce too steep a gradient somewhere between an under and over. It might well turn out to be fine with entrances at Bolivar Road and Waterloo Corner Road that aren't far from PWR, and Heaslip Road is also an option.
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: Northern Connector | 14km | $1b
New temporary on ramp at northern interchange in operation today. Vegetation already being removed from the PWR bridge embankment south of the bridge, where the new NC southbound onramp will go
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: Northern Connector | 14km | $1b
The new Motorway to Salisbury Highway offramp is currently being bitumised.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[COM] Re: Northern Connector | 14km | $1b
I wonder when traffic will switch to the new off ramp so the old one can be demolished?ChillyPhilly wrote: ↑Tue Apr 30, 2019 11:26 amThe new Motorway to Salisbury Highway offramp is currently being bitumised.
Code: Select all
Signature removed
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: Northern Connector | 14km | $1b
Monday 5amHooligan wrote: ↑Tue Apr 30, 2019 6:21 pmI wonder when traffic will switch to the new off ramp so the old one can be demolished?ChillyPhilly wrote: ↑Tue Apr 30, 2019 11:26 amThe new Motorway to Salisbury Highway offramp is currently being bitumised.
From the website
– temporary off-ramp closure and detour, and ramp change
As part of the Northern Connector Project, the South Road Superway off-ramp to Salisbury Highway will be closed for five nights (weather permitting) as follows:
Between 7pm and 5am each night between the evening of Monday 29 April and the morning of Friday 3 May
From 6pm Sunday 5 May to 5am Monday 6 May.
Access to the Salisbury Highway will be maintained via a detour to the Hanson Road interchange (refer to map here).
Following these works, from 5am Monday 6 May, the new temporary South Road Superway off-ramp to Salisbury Highway will be opened, maintaining access for northbound traffic travelling on the South Road Superway (refer to map here).
This temporary off-ramp is required to facilitate the construction staging of the Southern Interchange which, when complete, will provide access to the Northern Connector, Port River Expressway, South Road Superway and the Salisbury Highway.
Speed and lane restrictions will apply in the vicinity of the works, including the South Road Superway. Signage and traffic management will be in place to advise motorists of changed conditions. Please follow directional signage.
Thank you for your patience while these important works are undertaken.
[COM] Re: Northern Connector | 14km | $1b
aaronjameslange wrote: ↑Tue Apr 30, 2019 10:00 pmMonday 5amHooligan wrote: ↑Tue Apr 30, 2019 6:21 pmI wonder when traffic will switch to the new off ramp so the old one can be demolished?ChillyPhilly wrote: ↑Tue Apr 30, 2019 11:26 amThe new Motorway to Salisbury Highway offramp is currently being bitumised.
From the websiteI sorta gathered this week's works were for a switch to the temporary off ramp, but that didn't look like it'd be ready to go by Monday. Having said that, work on the temporary off ramp has moved along quite quickly.– temporary off-ramp closure and detour, and ramp change
As part of the Northern Connector Project, the South Road Superway off-ramp to Salisbury Highway will be closed for five nights (weather permitting) as follows:
Between 7pm and 5am each night between the evening of Monday 29 April and the morning of Friday 3 May
From 6pm Sunday 5 May to 5am Monday 6 May.
Access to the Salisbury Highway will be maintained via a detour to the Hanson Road interchange (refer to map here).
Following these works, from 5am Monday 6 May, the new temporary South Road Superway off-ramp to Salisbury Highway will be opened, maintaining access for northbound traffic travelling on the South Road Superway (refer to map here).
This temporary off-ramp is required to facilitate the construction staging of the Southern Interchange which, when complete, will provide access to the Northern Connector, Port River Expressway, South Road Superway and the Salisbury Highway.
Speed and lane restrictions will apply in the vicinity of the works, including the South Road Superway. Signage and traffic management will be in place to advise motorists of changed conditions. Please follow directional signage.
Thank you for your patience while these important works are undertaken.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: Northern Connector | 14km | $1b
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[COM] Re: Northern Connector | 14km | $1b
Nice photo from the DPTI website showing the Southern Interchange after the opening of the temporary northbound off ramp to Salisbury Highway.
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: Northern Connector | 14km | $1b
Old bridge being demolished weekend of 24-27th may. Prexy closed in both directionsHooligan wrote: ↑Tue Apr 30, 2019 6:21 pmI wonder when traffic will switch to the new off ramp so the old one can be demolished?ChillyPhilly wrote: ↑Tue Apr 30, 2019 11:26 amThe new Motorway to Salisbury Highway offramp is currently being bitumised.