[COM] M2 Northern Connector | 15.5km | $867m
[COM] Re: Northern Connector | 14km | $1b
I went over the Superway last weekend, quite a lot of earthworks going on even at half past eight on a Saturday morning
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: Northern Connector | 14km | $1b
Works have really ramped up (pun intended) around there the past few weeks. The big focus has been the Southern Interchange. Look forward to seeing it done.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
- The Scooter Guy
- Super Size Scraper Poster!
- Posts: 1667
- Joined: Sat Aug 08, 2009 7:45 pm
- Location: Anywhere!
- Contact:
[COM] Re: Northern Connector | 14km | $1b
For starters, my avatar is the well-known Adelaide Aquatic Centre insignia from 1989.
https://www.youtube.com/channel/UCWk8YPx2zHziHgvyPy_9fxQ
http://www.flickr.com/photos/ryanthescooterguy/
http://ryansbedroom.tumblr.com/
https://www.youtube.com/channel/UCWk8YPx2zHziHgvyPy_9fxQ
http://www.flickr.com/photos/ryanthescooterguy/
http://ryansbedroom.tumblr.com/
[COM] Re: Northern Connector | 14km | $1b
Here's how the Northern Connector is looking from the Waterloo Corner overpass.
[COM] Re: Northern Connector | 14km | $1b
Thanks for the photos. The first couple of photos look like a lot of fill will be required to remove the drop-off from the shoulder. Did it look like that will be able to be scraped up in the process of making drainage swales, or is it going to need to be carted in from somewhere else?
[COM] Re: Northern Connector | 14km | $1b
Traffic turning south from Bolivar road onto Port Wakefield road appears to have switched to a new alignment.
Code: Select all
Signature removed
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: Northern Connector | 14km | $1b
Works here speeding up. From mid next week iirc southbound pt wakefield road will be down to 2 lanes from 3. Presumably leftmost lane will be closed to continue bolivar road realignment
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: Northern Connector | 14km | $1b
Some night works this week, getting ready for closure of the temporary sulerway to salisbury highway off ramp and moving to the new flyover offramp. Would be nice if it was 2 lanes but me thinks only 1
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: Northern Connector | 14km | $1b
Some night works this week, getting ready for closure of the temporary superway to salisbury highway off ramp and moving to the new flyover offramp. Would be nice if it was 2 lanes but me thinks only 1
[COM] Re: Northern Connector | 14km | $1b
Will it be the new flyover that opens on Monday morning after the last night of closures?aaronjameslange wrote: ↑Mon Jul 01, 2019 8:07 pmSome night works this week, getting ready for closure of the temporary superway to salisbury highway off ramp and moving to the new flyover offramp. Would be nice if it was 2 lanes but me thinks only 1
[COM] Re: [U/C] Re: Northern Connector | 14km | $1b
I doubt it, the government would be jumping up and down if it wasSBD wrote:Will it be the new flyover that opens on Monday morning after the last night of closures?aaronjameslange wrote: ↑Mon Jul 01, 2019 8:07 pmSome night works this week, getting ready for closure of the temporary superway to salisbury highway off ramp and moving to the new flyover offramp. Would be nice if it was 2 lanes but me thinks only 1
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: [U/C] Re: Northern Connector | 14km | $1b
"Activities: Road temporary South Road Superway offramp to the Salisbury Relocation of safety barriers in preparation of opening the new South Road Superway off Salisbury Highway ."Mr Messy wrote: ↑Mon Jul 01, 2019 8:40 pmI doubt it, the government would be jumping up and down if it wasSBD wrote:Will it be the new flyover that opens on Monday morning after the last night of closures?aaronjameslange wrote: ↑Mon Jul 01, 2019 8:07 pmSome night works this week, getting ready for closure of the temporary superway to salisbury highway off ramp and moving to the new flyover offramp. Would be nice if it was 2 lanes but me thinks only 1
Doesnt say its actually opening