Post
by SBD » Thu Feb 20, 2020 9:03 pm
Goodsy wrote: ↑Thu Feb 20, 2020 5:41 pm
Bacon wrote: ↑Thu Feb 20, 2020 4:32 pm
Can someone please explain the arrangement with service centres in context of the Northern Connector?
Did the Government deem it necessary that at some point along the NC there should be a fuel stop, with the easiest way of achieving this designing the off ramp to go right past the OTR?
or
Did Peregrine pay the Government a lot of money to design the interchange with the OTR in mind?
Probably a whole host of things led to Bolivars design.
The Holiday Park
OTR
Bolivar treatment plant
White Horse Inn
weaving it through the Gordian knot was probably the cheapest option
I think the caravan park meant that it was not feasible to have a southbound offramp link to Bolivar Road. It would be too tight to meet the speed expectation. I suspect the rest of the design follows from that.
Another option might have been to put the main interchange at Hodgson Road (and hence keep the old entrance to the water treatment), but then we would complain that it didn't meet Bolivar Road.
Northbound is interesting. That OTR is not practical to access. After crossing the River Torrens, the Caltex in Wingfield might be signposted from the exit near Regency Road, but isn't visible. The next convenience/fuel outlet on the left is either Dublin (on PWR) or Truro (on Sturt Highway, with a proposal for a new one at Nuriootpa). A new service centre around Waterloo Corner could look attractive to someone in future. The good sites I've noticed interstate and overseas are on a hill next to the highway, but there aren't any natural hills on the west side of the highway until well past Gawler.
-
Goodsy
- Legendary Member!
- Posts: 1107
- Joined: Thu Jul 18, 2013 10:39 am
#1022
Post
by Goodsy » Fri Feb 21, 2020 7:45 pm
SBD wrote: ↑Thu Feb 20, 2020 9:03 pm
Goodsy wrote: ↑Thu Feb 20, 2020 5:41 pm
Bacon wrote: ↑Thu Feb 20, 2020 4:32 pm
Can someone please explain the arrangement with service centres in context of the Northern Connector?
Did the Government deem it necessary that at some point along the NC there should be a fuel stop, with the easiest way of achieving this designing the off ramp to go right past the OTR?
or
Did Peregrine pay the Government a lot of money to design the interchange with the OTR in mind?
Probably a whole host of things led to Bolivars design.
The Holiday Park
OTR
Bolivar treatment plant
White Horse Inn
weaving it through the Gordian knot was probably the cheapest option
I think the caravan park meant that it was not feasible to have a southbound offramp link to Bolivar Road. It would be too tight to meet the speed expectation. I suspect the rest of the design follows from that.
Another option might have been to put the main interchange at Hodgson Road (and hence keep the old entrance to the water treatment), but then we would complain that it didn't meet Bolivar Road.
Northbound is interesting. That OTR is not practical to access. After crossing the River Torrens, the Caltex in Wingfield might be signposted from the exit near Regency Road, but isn't visible. The next convenience/fuel outlet on the left is either Dublin (on PWR) or Truro (on Sturt Highway, with a proposal for a new one at Nuriootpa). A new service centre around Waterloo Corner could look attractive to someone in future. The good sites I've noticed interstate and overseas are on a hill next to the highway, but there aren't any natural hills on the west side of the highway until well past Gawler.
OTR has (or had) plans to build a new station at Two Wells on Middle Beach Road
https://www.plainsproducer.com.au/2018/ ... -bp-servo/
-
SBD
- Super Size Scraper Poster!
- Posts: 2723
- Joined: Thu Apr 03, 2014 3:49 pm
- Location: Blakeview
#1023
Post
by SBD » Sat Feb 22, 2020 12:02 pm
Goodsy wrote: ↑Fri Feb 21, 2020 7:45 pm
SBD wrote: ↑Thu Feb 20, 2020 9:03 pm
Goodsy wrote: ↑Thu Feb 20, 2020 5:41 pm
Probably a whole host of things led to Bolivars design.
The Holiday Park
OTR
Bolivar treatment plant
White Horse Inn
weaving it through the Gordian knot was probably the cheapest option
I think the caravan park meant that it was not feasible to have a southbound offramp link to Bolivar Road. It would be too tight to meet the speed expectation. I suspect the rest of the design follows from that.
Another option might have been to put the main interchange at Hodgson Road (and hence keep the old entrance to the water treatment), but then we would complain that it didn't meet Bolivar Road.
Northbound is interesting. That OTR is not practical to access. After crossing the River Torrens, the Caltex in Wingfield might be signposted from the exit near Regency Road, but isn't visible. The next convenience/fuel outlet on the left is either Dublin (on PWR) or Truro (on Sturt Highway, with a proposal for a new one at Nuriootpa). A new service centre around Waterloo Corner could look attractive to someone in future. The good sites I've noticed interstate and overseas are on a hill next to the highway, but there aren't any natural hills on the west side of the highway until well past Gawler.
OTR has (or had) plans to build a new station at Two Wells on Middle Beach Road
https://www.plainsproducer.com.au/2018/ ... -bp-servo/
That article says OTR was going to renovate its existing outlet in Two Wells township, and someone else had approval to build on the corner of Middle Beach Road.
The OTR redevelopment sounds like what they have gradually been doing to most of the country BP service stations they bought as a job lot a few years ago. They are being converted from old-fashioned service stations to modern convenience stores. X-Convenience and AM/PM are pretty much the same business model too.
Google Streetview shows that the Middle Beach Road site was sold in 2014, and had a sign up about the proposed service station in 2017 and 2018, but no sign at all (or development) in the 2019 photo. If it was proposed by the manager of the Port Wakefield BP, he obviously saw the opportunity for a facility on that side of the highway in that area. I wonder what has happened to the proposal now.
Looking at Google overhead view, I wonder if there is a potential development site next to the Northern Connector south of Symes Road, just before the decision point to use Northern Expressway or Port Wakefield Road.
-
marbles
- Gold-Member ;)
- Posts: 68
- Joined: Sun Feb 23, 2020 4:22 pm
#1024
Post
by marbles » Sun Mar 01, 2020 8:59 am
hello march!! we must be close to an opening surely?
-
Hooligan
- Legendary Member!
- Posts: 906
- Joined: Tue Jul 28, 2009 8:03 pm
#1025
Post
by Hooligan » Sun Mar 01, 2020 7:47 pm
marbles wrote: ↑Sun Mar 01, 2020 8:59 am
hello march!! we must be close to an opening surely?
NEXY is closed tomorrow to resurface the southbound lanes onto the NC. This must be the last step surely?
-
ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
-
Contact:
#1026
Post
by ChillyPhilly » Sun Mar 01, 2020 8:32 pm
Hooligan wrote:marbles wrote: ↑Sun Mar 01, 2020 8:59 am
hello march!! we must be close to an opening surely?
NEXY is closed tomorrow to resurface the southbound lanes onto the NC. This must be the last step surely?
It'd be great if Salisbury Highway was resurfaced between the Motorway/NC and Port Wakefield Road. The surface is appalling.
Our state, our city, our future.
All views expressed on this forum are my own.
-
SBD
- Super Size Scraper Poster!
- Posts: 2723
- Joined: Thu Apr 03, 2014 3:49 pm
- Location: Blakeview
#1027
Post
by SBD » Sun Mar 01, 2020 9:58 pm
ChillyPhilly wrote: ↑Sun Mar 01, 2020 8:32 pm
Hooligan wrote:marbles wrote: ↑Sun Mar 01, 2020 8:59 am
hello march!! we must be close to an opening surely?
NEXY is closed tomorrow to resurface the southbound lanes onto the NC. This must be the last step surely?
It'd be great if Salisbury Highway was resurfaced between the Motorway/NC and Port Wakefield Road. The surface is appalling.
Imagine the noise of the whingers if that was closed for major works (I expect it needs to be dug deeper than just adding a topcoat) at the same time as all the Northern Connector roadworks. The road will be much less busy once the new road opens, so much less outcry to fix it. MacIntyre Road Road is just as bad, and getting fixed in nightworks now. Hopefully they will move on to Salisbury Highway next.
-
bits
- Legendary Member!
- Posts: 831
- Joined: Sun Oct 26, 2014 9:24 pm
#1028
Post
by bits » Tue Mar 03, 2020 2:40 am
McIntyre Road has always had significant problems. It gets cut back and new bitumen every few years to relevel it. The same work will likely be due again by 2023.
Clearly the road has structural problems but no one has done better than continued patch work to relevel.
-
Brucetiki
- Legendary Member!
- Posts: 995
- Joined: Tue Apr 17, 2012 6:20 pm
#1029
Post
by Brucetiki » Tue Mar 03, 2020 11:29 am
bits wrote: ↑Tue Mar 03, 2020 2:40 am
McIntyre Road has always had significant problems. It gets cut back and new bitumen every few years to relevel it. The same work will likely be due again by 2023.
Clearly the road has structural problems but no one has done better than continued patch work to relevel.
The soil around that area is notoriously bad. Would that play a role in McIntyre Rd's surface issues?
-
Hooligan
- Legendary Member!
- Posts: 906
- Joined: Tue Jul 28, 2009 8:03 pm
#1030
Post
by Hooligan » Tue Mar 03, 2020 1:56 pm
More night closures tonight and tomorrow night on the superway for barrier and gantry installation. Northbound closure tonight and southbound closure tomorrow night.
-
SBD
- Super Size Scraper Poster!
- Posts: 2723
- Joined: Thu Apr 03, 2014 3:49 pm
- Location: Blakeview
#1031
Post
by SBD » Tue Mar 03, 2020 2:41 pm
Brucetiki wrote: ↑Tue Mar 03, 2020 11:29 am
bits wrote: ↑Tue Mar 03, 2020 2:40 am
McIntyre Road has always had significant problems. It gets cut back and new bitumen every few years to relevel it. The same work will likely be due again by 2023.
Clearly the road has structural problems but no one has done better than continued patch work to relevel.
The soil around that area is notoriously bad. Would that play a role in McIntyre Rd's surface issues?
Probably. It needs to be dug out much deeper and have a solid base built in - perhaps now we have experience building concrete roads that might be a solution.
-
Eurostar
- Legendary Member!
- Posts: 954
- Joined: Thu Jun 24, 2010 3:44 pm
#1032
Post
by Eurostar » Tue Mar 03, 2020 8:06 pm
SBD wrote: ↑Tue Mar 03, 2020 2:41 pm
Brucetiki wrote: ↑Tue Mar 03, 2020 11:29 am
bits wrote: ↑Tue Mar 03, 2020 2:40 am
McIntyre Road has always had significant problems. It gets cut back and new bitumen every few years to relevel it. The same work will likely be due again by 2023.
Clearly the road has structural problems but no one has done better than continued patch work to relevel.
I'm not sure if connected or not but Womma Road in between Andrews Road and Argent Road had roadworks today, looks like new gutters
The soil around that area is notoriously bad. Would that play a role in McIntyre Rd's surface issues?
Probably. It needs to be dug out much deeper and have a solid base built in - perhaps now we have experience building concrete roads that might be a solution.
-
alexczarn
- Gold-Member ;)
- Posts: 92
- Joined: Tue Nov 26, 2013 11:13 am
#1033
Post
by alexczarn » Tue Mar 03, 2020 8:07 pm
Hooligan wrote: ↑Sun Mar 01, 2020 7:47 pm
marbles wrote: ↑Sun Mar 01, 2020 8:59 am
hello march!! we must be close to an opening surely?
NEXY is closed tomorrow to resurface the southbound lanes onto the NC. This must be the last step surely?
Opens this Saturday.
-
Hooligan
- Legendary Member!
- Posts: 906
- Joined: Tue Jul 28, 2009 8:03 pm
#1034
Post
by Hooligan » Tue Mar 03, 2020 8:11 pm
alexczarn wrote: ↑Tue Mar 03, 2020 8:07 pm
Hooligan wrote: ↑Sun Mar 01, 2020 7:47 pm
marbles wrote: ↑Sun Mar 01, 2020 8:59 am
hello march!! we must be close to an opening surely?
NEXY is closed tomorrow to resurface the southbound lanes onto the NC. This must be the last step surely?
Opens this Saturday.
Serious? Thats fantastic. I can't wait to stop driving down Port Wakefield road.
-
alexczarn
- Gold-Member ;)
- Posts: 92
- Joined: Tue Nov 26, 2013 11:13 am
#1035
Post
by alexczarn » Tue Mar 03, 2020 10:11 pm
Hooligan wrote: ↑Tue Mar 03, 2020 8:11 pm
alexczarn wrote: ↑Tue Mar 03, 2020 8:07 pm
Hooligan wrote: ↑Sun Mar 01, 2020 7:47 pm
NEXY is closed tomorrow to resurface the southbound lanes onto the NC. This must be the last step surely?
Opens this Saturday.
Serious? Thats fantastic. I can't wait to stop driving down Port Wakefield road.
I'll be roadtripping for a suss.
Who is online
Users browsing this forum: No registered users and 0 guests