Jetty Road isn’t included for the grade separation. Extremely low likelihood it would be expanded to include it.SouthAussie94 wrote: ↑Thu Feb 13, 2020 8:41 pmPreliminary works for this are well underway. Service locating, potholing and surveying have been underway for the past week or so.
The scope seems to extend from Warradale station to Jetty Rd Brighton (and potentially further south)
What's the likelihood of Jetty Rd being included in the grade separation?
[CAN] Hove Level Crossing Removal | $171m
[CAN] Re: Brighton Road Grade Separation
[CAN] Re: Brighton Road Grade Separation
We might as well future proof the project and do Jetty Road now. Will be much cheaper than coming back to finish the job 5-10 years down the line. And it’s unlikely but it would be great to see a grade-separated Brighton station relocated closer to Jetty Road for connectivity with the Jetty Road precinct.SouthAussie94 wrote: ↑Thu Feb 13, 2020 8:41 pmPreliminary works for this are well underway. Service locating, potholing and surveying have been underway for the past week or so.
The scope seems to extend from Warradale station to Jetty Rd Brighton (and potentially further south)
What's the likelihood of Jetty Rd being included in the grade separation?
-
- High Rise Poster!
- Posts: 299
- Joined: Sat Mar 11, 2006 1:02 am
- Location: Adelaide (Hallett Cove)
[CAN] Re: Brighton Road Grade Separation
I've noticed all the different coloured markings sprayed everywhere around the line, is there actually a scheduled start for this project?
[CAN] Re: [PRO] Re: Brighton Road Grade Separation
No, we need to wait for a development application to be lodged first. Any works now would be early works, such as moving services and traffic management planning for any detours and diversions.aceman wrote:I've noticed all the different coloured markings sprayed everywhere around the line, is there actually a scheduled start for this project?
[CAN] Re: Brighton Road Grade Separation
According to https://www.dpti.sa.gov.au/infrastructu ... ng_upgrade the contract for the detailed planning study was awarded to PTPA in August 2019, and on completion of the study early (construction) works are expected to begin in 2021/22.
The DPTI webpage has details and links to a fact sheet and the PTPA webpage.
[CAN] [PRO] Re: Hove Level Crossing Removal | $171m
Utility surveys and site investigations will commence tomorrow.
-
- High Rise Poster!
- Posts: 380
- Joined: Mon Dec 14, 2015 7:31 pm
[CAN] Re: Hove Level Crossing Removal | $171m
Surveyors were on site today
Follow me on Flickr
http://www.flickr.com/photos/135625678@N06/
http://www.flickr.com/photos/135625678@N06/
- SouthAussie94
- Legendary Member!
- Posts: 585
- Joined: Tue Mar 27, 2012 10:03 pm
- Location: Southern Suburbs
[CAN] Re: Hove Level Crossing Removal | $171m
They've been on site for the last few weeks undertaking service investigations with a vac truck. Work outside the rail corridor is nearing completion. Night works will start in the next few weeks to investigate services within the rail corridor.
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
- SouthAussie94
- Legendary Member!
- Posts: 585
- Joined: Tue Mar 27, 2012 10:03 pm
- Location: Southern Suburbs
[CAN] Re: Hove Level Crossing Removal | $171m
I've heard from a pretty good source that this will be built as a rail underpass similar to the Oaklands Crossing.
This hasn't been locked in 100% but is almost certain.
This hasn't been locked in 100% but is almost certain.
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
[CAN] Re: Hove Level Crossing Removal | $171m
I'm hoping to see a near-identical design to Oaklands. It would tie them both in as Seaford Line stations and as part of the wider list of level crossing removals. It'd surely be cheaper to recycle the Oaklands design and tweak it than design something completely new as well, right?SouthAussie94 wrote: ↑Tue Jun 16, 2020 10:26 amI've heard from a pretty good source that this will be built as a rail underpass similar to the Oaklands Crossing.
This hasn't been locked in 100% but is almost certain.
[CAN] Re: Hove Level Crossing Removal | $171m
At Oaklands it was possible to excavate the new trench and construct the station and much of the new track by making use of the extensive car park to the south while allowing the rail service to continue operation on the old line. At Hove the rail corridor is bordered by either roadways or residential housing.Spotto wrote: ↑Tue Jun 16, 2020 11:08 amI'm hoping to see a near-identical design to Oaklands. It would tie them both in as Seaford Line stations and as part of the wider list of level crossing removals. It'd surely be cheaper to recycle the Oaklands design and tweak it than design something completely new as well, right?SouthAussie94 wrote: ↑Tue Jun 16, 2020 10:26 amI've heard from a pretty good source that this will be built as a rail underpass similar to the Oaklands Crossing.
This hasn't been locked in 100% but is almost certain.
[CAN] Re: Hove Level Crossing Removal | $171m
It will probably be built more like Bowden Station. Overnight and weekend rail closures for piling works, and then a longer shutdown over a few months to dig out the soil and construct the station.
[CAN] Re: Hove Level Crossing Removal | $171m
I don't mean use the same construction method, because Hove is very different to Oaklands. I mean the final design and architecture should look like Oaklands does.PD2/20 wrote: ↑Tue Jun 16, 2020 3:36 pmAt Oaklands it was possible to excavate the new trench and construct the station and much of the new track by making use of the extensive car park to the south while allowing the rail service to continue operation on the old line. At Hove the rail corridor is bordered by either roadways or residential housing.Spotto wrote: ↑Tue Jun 16, 2020 11:08 amI'm hoping to see a near-identical design to Oaklands. It would tie them both in as Seaford Line stations and as part of the wider list of level crossing removals. It'd surely be cheaper to recycle the Oaklands design and tweak it than design something completely new as well, right?SouthAussie94 wrote: ↑Tue Jun 16, 2020 10:26 amI've heard from a pretty good source that this will be built as a rail underpass similar to the Oaklands Crossing.
This hasn't been locked in 100% but is almost certain.
[CAN] Re: Hove Level Crossing Removal | $171m
But design may be determined in part by construction considerations. At Ovingham road over rail is preferred to minimise rail disruption.Spotto wrote: ↑Tue Jun 16, 2020 4:14 pmI don't mean use the same construction method, because Hove is very different to Oaklands. I mean the final design and architecture should look like Oaklands does.PD2/20 wrote: ↑Tue Jun 16, 2020 3:36 pmAt Oaklands it was possible to excavate the new trench and construct the station and much of the new track by making use of the extensive car park to the south while allowing the rail service to continue operation on the old line. At Hove the rail corridor is bordered by either roadways or residential housing.
[CAN] Re: Hove Level Crossing Removal | $171m
I use this stretch of Brighton Road in my car and the Seaford Line a lot. The time it will take to construct a rail underpass will be really disruptive to my daily commute on the train, but must be the best solution long term. I just don’t know how a road overpass could fit into the landscape here with so little space and so many businesses and residential streets near by with their entrance and exit onto Brighton Road (see image). Has this been achieved elsewhere?
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk
Who is online
Users browsing this forum: Archer and 6 guests