The core is constructed ahead of the levels within a frame wall (also called floor jump panels). The frame wall is above the
central core. Within these panels/walls the concrete is poured. Once the concrete walls are poured the floor jump is raised.
The core is constructed ahead of the levels within a frame wall (also called floor jump panels). The frame wall is above the
That's correct, the orange structure that is being assembled to provide a safety screen for the forming/pouring of the floor levels, not the core.
Pikey wrote:That's correct, the orange structure that is being assembled to provide a safety screen for the forming/pouring of the floor levels, not the core.
Also better than any other student building in the neighbourhood.
So would that suggest it happened today? I’m pretty sure it did, but have been away from the city for a week.Pikey wrote:Great shot Andy! Looks like the climbing collar is on the crane too.
14 days since this post and the core is today showing level 8.AndyWelsh wrote:13 days ago the core moved to level 6. Today the core shows level 7.
Sent from my iPhone using Tapatalk
Users browsing this forum: Google [Bot] and 5 guests