[U/C] Re: [U/C] Re: M2 North-South Motorway

#5251 Post by 1NEEDS2POST » Sat Jun 19, 2021 8:05 pm

Spotto wrote:
Wed Jun 16, 2021 6:07 pm
And no, they wouldn't use a single TBM and put both sets of tracks in a single tunnel.
Which is actually being used in the under-construction Barelona metro line 9. Their TBM is 11.95 m in diameter and they will use small metro trains which are 2.71 m wide, while Adelaide metro trains are 3.2 m wide. So it's not unrealistic for TBMs of that size to bore a single twin track tunnel for Adelaide metro.

Image

SBD
Super Size Scraper Poster!
Posts: 2723
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview

[U/C] Re: M2 North-South Motorway

#5252 Post by SBD » Sun Jun 20, 2021 12:45 am

mawsonguy wrote:
Sat Jun 19, 2021 5:12 pm
One issue that I don't believe has been adequately addressed is, how quick you clear the traffic from the exit ramp. Under the proposed design, traffic travelling from the north to the city will exit the tunnel north of Henley Beach Road. That traffic has to merge with the traffic travelling south on the surface road. It then has a short section of surface road before the city bound traffic can turn left onto Henley Beach Road. This section is currently the site of significant congestion. My observation is that a large part of the traffic using the sections currently local traffic.

There is only one very shortly left turn filter lane and you have to stop if traffic is travelling east on Henley Beach Road.Traffic can continue on to Sir Donald Bradman Drive, where the filter lanes before and after the left turn have a reasonable length, but that only continues the congestion. I think some serious consideration needs to be given to managing traffic exiting the tunnel and turning left onto Henley Beach Road.
Coming from the north to the city, we can use Port Road too. I agree that the current bottleneck seems to be at Henley Beach Road, but I have not noticed if this is vehicles coming from the motorway and seeking to turn at HBR. I had assumed it is predominantly traffic seeking to continue straight on, interrupted by east/west traffic causing the lights to be red. This would be solved by grade separation, with or without an interchange.

I think your concern about clearing the ramp is the reason why most of the exits between PRE and Sturt Road are designed to be mid-block. This doesn't seem to be the case for Regency Road, but presumably they start far enough back to be OK.

User avatar
Spotto
Legendary Member!
Posts: 753
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: [U/C] Re: M2 North-South Motorway

#5253 Post by Spotto » Sun Jun 20, 2021 1:57 am

1NEEDS2POST wrote:
Sat Jun 19, 2021 8:05 pm
Spotto wrote:
Wed Jun 16, 2021 6:07 pm
And no, they wouldn't use a single TBM and put both sets of tracks in a single tunnel.
Which is actually being used in the under-construction Barelona metro line 9. Their TBM is 11.95 m in diameter and they will use small metro trains which are 2.71 m wide, while Adelaide metro trains are 3.2 m wide. So it's not unrealistic for TBMs of that size to bore a single twin track tunnel for Adelaide metro.
That’s an interesting approach. But I think even with the couple extra metres that our TBMs would give it would be a very tight fit, if they fit at all. Those metro trains are slightly smaller than our fleet, and they use rigid overhead electrification instead of traditional catenary which seems to allow slightly lower clearance as well. Repurposing a TBM that we already own for this kind of purpose is a fantastic cost saver, but I’m not certain our trains would actually fit. Even a couple of centimetres makes all the difference, as NSW learned when ordering their new intercity train fleet.

marbles
Gold-Member ;)
Posts: 68
Joined: Sun Feb 23, 2020 4:22 pm

[U/C] Re: M2 North-South Motorway

#5254 Post by marbles » Wed Jun 23, 2021 8:34 am

there was a news story on ch9 news last night i missed it, anyone know what was about, in regards to this motorway

croweater888
Sen-Rookie-Sational
Posts: 38
Joined: Tue Mar 05, 2019 6:02 pm

[U/C] Re: M2 North-South Motorway

#5255 Post by croweater888 » Wed Jun 23, 2021 11:20 am

Another $1 Billion has been added to the projects overall budget, taking it to $9.9 billion, to ensure each tunnel has 3x traffic lanes on each side and that there is sufficient space for an emergency vehicle slip lane. I don't know who said it, but these changes were 'to ensure they get it right first time, future proofing the project.'

The media are trying to sensationalise the issue by calling it a cost 'blowout'.

User avatar
[Shuz]
Super Size Scraper Poster!
Posts: 3301
Joined: Sun Apr 10, 2011 5:26 pm

[U/C] Re: M2 North-South Motorway

#5256 Post by [Shuz] » Wed Jun 23, 2021 12:16 pm

$1b is a relatively cheap fix in the grand scheme of things to ensure that this project has sufficient capacity in future. A good call.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.

User avatar
Norman
Donating Member
Donating Member
Posts: 6485
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: M2 North-South Motorway

#5257 Post by Norman » Wed Jun 23, 2021 8:22 pm

DIT has uploaded a video showing how the project has progressed so far and what the next steps are towards final approval.

https://www.youtube.com/watch?v=EGyxXfnX5hk

Bacon
High Rise Poster!
Posts: 119
Joined: Tue Oct 15, 2013 1:17 pm

[U/C] Re: M2 North-South Motorway

#5258 Post by Bacon » Sun Jul 04, 2021 4:42 pm

Regency to Pym is now 80km/h

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6424
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: M2 North-South Motorway

#5259 Post by rev » Wed Jul 07, 2021 7:44 am


South Road twin tunnel entry and exit points revealed, along with properties to be acquired


The southern entry and exit points of the first South Rd tunnel have been revealed in an official map, along with the neighbouring properties marked for acquisition.

Gabriel Polychronis
@G_Polychronis 2 min read July 7, 2021 - 6:00AM

More than 60 homes and businesses will be demolished in phase one of South Australia’s largest infrastructure project, the expansive 4km tunnel dig under South Road.

Work on the two parallel tunnels of the North-South Corridor will start in 2023.

The Advertiser can reveal the southern entry and exit points of the first two parallel tunnels for the final stage of the North-South Corridor, as well as the businesses and homes in the firing line.

In the $9.9bn Torrens to Darlington project’s first major milestone, the Transport Department has released a map of the “southern laydown area” – a launch site for the assembly of two tunnel-boring machines.

The machines will be assembled on the western side of South Road at Clovelly Park, in an area between Selgar Ave and Princes Parade.

Work at the site will start in early 2023 and is expected to take between 12 to 18 months in preparation alone. The area will become a hub of activity with various workshops, sheds and portable offices.

A total of 64 properties must be demolished to make way for the launch site. Among those in the marked area include the Tonsley Hotel, InkInSkin Tattoo Studio and the Clovelly Park Chiropractic Clinic.

Transport Minister Corey Wingard said negotiations had already begun with affected property owners in the area. It is understood all 64 had been contacted.

“When we announced this project, we made a commitment to let the community know as soon as possible when activities would begin in particular locations and which properties were likely to be impacted,” Mr Wingard said.

“By announcing that we’ve started property acquisitions in the southern laydown area, we’re ensuring everyone who has a stake in this project and in the local community is aware of the progress that’s been made and how the next steps will play out.”

The final reference design for the rest of the 10.5km upgrade will be completed later this year.

A total of 390 properties must be acquired for the project.

Slashing travel time by 24 minutes, the Torrens to Darlington project will include two sets of parallel tunnels with three lanes going each way under South Road, as well as a series of surface and lowered motorways.

Construction is expected to generate more than 4500 jobs, making it the biggest infrastructure project in the state’s history.

Due to be completed in 2028, it is the final stage of the 78km non-stop North-South Corridor between Gawler and Old Noarlunga.

Federal Infrastructure Minister Paul Fletcher said revealing the southern tunnel launch site was an “important milestone” for the project.

“Significant work has already been done to progress this project, including hundreds of geotechnical investigations and the design for relocation of important utility services such as water, gas and telecommunications.”
https://www.adelaidenow.com.au/news/sou ... 41ad223fac

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6424
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: M2 North-South Motorway

#5260 Post by rev » Wed Jul 07, 2021 7:46 am


TorrensSA
High Rise Poster!
Posts: 159
Joined: Thu Aug 02, 2018 6:45 am

[U/C] Re: M2 North-South Motorway

#5261 Post by TorrensSA » Wed Jul 07, 2021 9:27 am

Acquiring the Tonsley Hotel is going to cost millions . The Whitman's will be happy they are getting rid of the pokies!

User avatar
Spotto
Legendary Member!
Posts: 753
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: M2 North-South Motorway

#5262 Post by Spotto » Wed Jul 07, 2021 10:43 am

Beyond Bouldering is in the middle of renovating the old Ferrari Formalwear building on the corner of Princes Parade and South Road (at the top edge of the work zone) into their new third location. Looks like they won’t be there for long, if they end up opening at all.

Listy
High Rise Poster!
Posts: 195
Joined: Sat Oct 01, 2016 11:07 pm

[U/C] Re: M2 North-South Motorway

#5263 Post by Listy » Wed Jul 07, 2021 11:36 am

Spotto wrote:
Wed Jul 07, 2021 10:43 am
Beyond Bouldering is in the middle of renovating the old Ferrari Formalwear building on the corner of Princes Parade and South Road (at the top edge of the work zone) into their new third location. Looks like they won’t be there for long, if they end up opening at all.
Quite a few new looking knock-down rebuilds along that stretch of York Tce as well ...

mawsonguy
High Rise Poster!
Posts: 198
Joined: Fri Dec 20, 2013 8:11 am

[U/C] Re: M2 North-South Motorway

#5264 Post by mawsonguy » Wed Jul 07, 2021 12:26 pm

Further details on the Tunnel Laydown Area can be found at https://dit.sa.gov.au/__data/assets/pdf ... 6.7.21.pdf.

It states that "Work at the site will start in early 2023 and will take 12 to 18 months to prepare the site for the arrival of the TBMs" I infer that the tunneling will not start until late 2025.

Nort
Super Size Scraper Poster!
Posts: 2296
Joined: Tue Feb 09, 2010 2:08 pm

[U/C] Re: M2 North-South Motorway

#5265 Post by Nort » Wed Jul 07, 2021 12:50 pm

Listy wrote:
Wed Jul 07, 2021 11:36 am
Spotto wrote:
Wed Jul 07, 2021 10:43 am
Beyond Bouldering is in the middle of renovating the old Ferrari Formalwear building on the corner of Princes Parade and South Road (at the top edge of the work zone) into their new third location. Looks like they won’t be there for long, if they end up opening at all.
Quite a few new looking knock-down rebuilds along that stretch of York Tce as well ...
Unavoidable, but those are the residents I have the most sympathy for. Along the uncompleted sections of South Road it's been clear for years that it would need to be upgraded at some point, so it was reasonable to expect that homes could be acquired at some point. If not for the tunnel entrance though it wouldn't have been expected that houses that far back would ever need to be acquired.