[COM] 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Work on the footings has started on the southern end. there is a small set down area for service core/lift core. The tops of the piles are visible and there is a part buried sludge tank( with the 3 manhole covers)
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Update 5/6/2021 they are doing the foundations in stages, but no sign of any crane base yet.
-
- Legendary Member!
- Posts: 870
- Joined: Sun Jul 15, 2007 5:51 pm
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Might not have a set crane ?
Sent from my SM-A515F using Tapatalk
Sent from my SM-A515F using Tapatalk
-
- Super Size Scraper Poster!
- Posts: 2633
- Joined: Tue Mar 05, 2013 4:41 pm
- Location: Adelaide CBD, SA
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
The first precast walls for this were installed today, looks as though this won't have a fixed crane. I'm not sure why a lot of these smaller developments are opting against fixed cranes... It seems to drag out the construction period significantly and it also involves blocking off entire laneways or streets...
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
My guess is it all comes down to cost and unfortunately they don't care much for the inconvenience it causes to locals or traffic flow. The problem must come down to it being approved in this form.Patrick_27 wrote: ↑Thu Jul 01, 2021 6:35 pmThe first precast walls for this were installed today, looks as though this won't have a fixed crane. I'm not sure why a lot of these smaller developments are opting against fixed cranes... It seems to drag out the construction period significantly and it also involves blocking off entire laneways or streets...
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Yes it appears that they are not having a tower crane? A view of the precast wall panels from the rear (Gunson St). Picture Saturday 3/7/2021
- gnrc_louis
- Legendary Member!
- Posts: 993
- Joined: Sat Nov 10, 2018 2:04 pm
- Location: Adelaide
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Thanks for the pictures. Looking forward to this going up - this part of the city is starting to gain reasonable density. Now need for the nearby open-air car-park on Pulteney Street to get developed, the Paladio apartments site to get a new proposal and for the Tribe Hotel to go ahead.
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Update 10/7/2021, this project is to have a steel frame.
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Up date from 14/8/2021. Concrete precast wall panels up to level 3 at rear.
-
- Super Size Scraper Poster!
- Posts: 2633
- Joined: Tue Mar 05, 2013 4:41 pm
- Location: Adelaide CBD, SA
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Even more work done on this site since this picture was taken, will try and get a few more pictures today.
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Update 5/9/2021 some pictures from this weekend showing both front and rear views Note brownish /gold panels on the office part of the building.
-
- Super Size Scraper Poster!
- Posts: 2633
- Joined: Tue Mar 05, 2013 4:41 pm
- Location: Adelaide CBD, SA
-
- Legendary Member!
- Posts: 870
- Joined: Sun Jul 15, 2007 5:51 pm
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Strange build
First few floors by mobile then a fixed crane
What would be the reason for this? Has it been done before in Adelaide?
Sent from my SM-A515F using Tapatalk
First few floors by mobile then a fixed crane
What would be the reason for this? Has it been done before in Adelaide?
Sent from my SM-A515F using Tapatalk
[COM] Re: 266 - 270 Pulteney Street | 44m | 11 Levels | Mixed Use
Another (later) view from today 11/9/2021. Note the tower sections taper 1/2 way up.
Who is online
Users browsing this forum: Google [Bot], Google Adsense [Bot] and 8 guests