Re: Crane Counter: CBD 5 | Metro 2 | Total 7

#1651 Post by SRW » Sun Aug 22, 2021 5:54 pm

Crane pieces are on site for Southern Cross.
Keep Adelaide Weird

citywatcher
Legendary Member!
Posts: 870
Joined: Sun Jul 15, 2007 5:51 pm

Re: Crane Counter: CBD 5 | Metro 2 | Total 7

#1652 Post by citywatcher » Sun Aug 22, 2021 6:23 pm

GPO Westin not even SWP yet ?
Parkland Vista can't find a thread for this development.

Sent from my SM-A515F using Tapatalk




Ozbear73
Gold-Member ;)
Posts: 57
Joined: Fri Jun 19, 2020 10:51 am

Re: Crane Counter: CBD 5 | Metro 2 | Total 7

#1653 Post by Ozbear73 » Sun Aug 22, 2021 8:53 pm

Is 135 South Tce/Parkland Vista actually supposed to be the 144 South Tce thread? I’m confused too 🤔

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 5 | Metro 2 | Total 7

#1654 Post by EBG » Sun Aug 22, 2021 10:20 pm

Yes Sorry for the confusion this is supposed to be 144 south Tce. Not much has happened on this site for the last 3 weeks. I go passed it several times a week.
Attachments
20210815_ 144 south tce.jpg

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 5 | Metro 2 | Total 7

#1655 Post by EBG » Tue Aug 24, 2021 4:06 pm

The (first) crane at southern cross site is nearly complete as of lunchtime today 24/8/2021. the crane is quite tall and can be seen from O'Connell St
Attachments
20210824_125805crane KW.jpg

Smithy84
High Rise Poster!
Posts: 124
Joined: Sat Nov 14, 2020 10:18 am

Re: Crane Counter: CBD 7 | Metro 2 | Total 9

#1656 Post by Smithy84 » Wed Aug 25, 2021 6:26 pm

Hammerhead crane at Adelphi Tce, Glenelg is now complete.

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 7 | Metro 2 | Total 9

#1657 Post by EBG » Wed Aug 25, 2021 6:47 pm

A second crane is going up at southern cross site king William st. picture 25/8/2021.
Attachments
20210825_crane.jpg

User avatar
mshagg
Legendary Member!
Posts: 568
Joined: Sun Jan 23, 2011 10:50 pm

Re: Crane Counter: CBD 8 | Metro 3 | Total 11

#1658 Post by mshagg » Mon Aug 30, 2021 7:21 pm

Here's a shot of the 60 KWS luffers from the black stump
Attachments
20210830_124828.jpg

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 8 | Metro 3 | Total 11

#1659 Post by EBG » Sun Sep 05, 2021 9:08 pm

The crane at Adel University came down sometime last week.

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 7 | Metro 3 | Total 10

#1660 Post by EBG » Sat Sep 11, 2021 2:44 pm

Crane going up in Pulteney St today 11/9/2021.
Attachments
20210911_pulteny st 2.jpg

Ozbear73
Gold-Member ;)
Posts: 57
Joined: Fri Jun 19, 2020 10:51 am

Re: Crane Counter: CBD 7 | Metro 3 | Total 10

#1661 Post by Ozbear73 » Tue Sep 14, 2021 5:34 pm

So given the new crane at 270 Pulteney St, should the crane total revert back to 8+3 = 11 cranes?

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 7 | Metro 3 | Total 10

#1662 Post by EBG » Sat Sep 18, 2021 2:31 pm

Finally the crane is being erected at SAHMI 2 on North Tce. Tis must be a record for the time the crane base is installed and the crane being erected 14/11/2020 to 18/9/2021
Attachments
20210918_sahmi2.jpg

Ben
VIP Member
VIP Member
Posts: 7574
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

Re: Crane Counter: CBD 7 | Metro 3 | Total 10

#1663 Post by Ben » Mon Sep 20, 2021 5:23 pm

New cranes expected in the next 1 -2 months.

GPO Westin Hotel
144 South Terrace

Completed 2021
Sofitel Currie Street.........................................32 (117m)
21 - 24 North Terrace............................................8
1 Hurtle Square....................................................9

Completed Metro 2021
Brougham Place ............................................12
Cremorne Plaza, 246 Unley Road......................... 7
Hyde Park place............................................. 7


Location......................................Levels............................Crane

Under Construction/SWP CBD
203 North Terrace...............................................35 (119m).........................1
269 North Terrace...............................................34 (118m).........................1
73 Pirie Street...................................................21...................................2
260 Flinders Street - Vibe Hotel..............................21...................................1
GPO Westin Hotel...............................................16
52-66 King William Street - Southern Cross.................15.................................2
144 South Terrace………………………............................13
SAHMRI 2........................................................12...................................1
266 - 270 Pulteney Street....................................11...................................1

TOTAL CBD CRANES:..................................................................9


Under Construction/SWP METRO
Melbourne Street..........................................8......................................1
Adelphi Waters.............................................7.....................................1
Ramada Hotel - Elizabeth ...............................8


TOTAL METRO CRANES:.......................................................2

TOTAL ADELAIDE CRANES:....................................................11



Commencing September/October

Festival Centre...........................................27 (108m)
51 Pirie Street (Hyatt)..................................24
181 Waymouth Street..................................17
57 Wyatt Street .........................................8


Approved/Proposed Upcoming
75-79 King William Street................................39 (132m)
32 Grote Street............................................35 (127m)
Central Market Arcade...................................35 (124m)
29 Twin Street.............................................38 (124m) (ONH)
64 Currie Street (QT).....................................25 ONH
157 Waymouth Street....................................23 ONH
42-56 Franklin Street.....................................21 ONH
124 Wakefield Street....................................18 ONH
14 Bentham Street........................................18 ONH
2-6 Hutt Street..............................................16

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 9 | Metro 2 | Total 11

#1664 Post by EBG » Wed Sep 22, 2021 9:15 pm

The crane at SAHMRI 2 was completed at about 4.30 today Wed 22/9/2021. This crane has quite a long reach so they may be planning to use just the one crane(?). It all depends on how quickly the building is to be constructed.
Attachments
20210922_SAHMRI 2.jpg

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6423
Joined: Sat Nov 11, 2006 12:14 pm

Re: Crane Counter: CBD 9 | Metro 2 | Total 11

#1665 Post by rev » Fri Sep 24, 2021 11:46 am

Not a construction site but there's a hammerhead crane erected a few streets away from Arndale at what I assume is the yard for Titan cranes.

Surprised its allowed, its virtually surrounded by residential.
What would the height limit be?