#226 Post by Listy » Tue Sep 07, 2021 1:36 pm

Been a while since I posted a photo of the site, but here's what it looks like today. Not a lot of visual progress over the last couple of months although the bunker is fully excavated now. If I had to guess, it looks like the current focus for the last few weeks has been making sure the walls are all sealed up - either to prevent groundwater getting in, or liquid waste seeping out into the groundwater once the facility is operational (or both).

Image

RichyRichc
Sen-Rookie-Sational
Posts: 11
Joined: Thu Oct 01, 2020 8:40 am

[COM] Re: SAHMRI Stage 2

#227 Post by RichyRichc » Tue Sep 07, 2021 1:54 pm

citywatcher wrote:
Mon Sep 06, 2021 11:29 pm
Crane base has been in for months
Very slow going
2025 completion date and started early 2020

Sent from my SM-A515F using Tapatalk
I read that the building will be complete in 2023 August with people moved in on the upper floors but the equipment in the bunker basement takes until to 2025 to get operational and tested before patients can use it.

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: SAHMRI Stage 2

#228 Post by EBG » Wed Sep 08, 2021 9:55 pm

The crane base has been there since 14/11/2020. i thought the crane would have been installed before last Christmas.

Smithy84
High Rise Poster!
Posts: 123
Joined: Sat Nov 14, 2020 10:18 am

[COM] Re: SAHMRI Stage 2

#229 Post by Smithy84 » Thu Sep 09, 2021 11:50 am

Smithy84 wrote:
Fri Feb 26, 2021 5:34 pm
Post from the EPA on LinkedIn suggests that remediation of the site will be complete by November 2021, with construction of the building to follow.
Post above from February this year re timeframe/progress. Thanks

citywatcher
Legendary Member!
Posts: 870
Joined: Sun Jul 15, 2007 5:51 pm

[COM] Re: SAHMRI Stage 2

#230 Post by citywatcher » Thu Sep 09, 2021 12:12 pm

I think they found issues they weren't expecting

Sent from my SM-A515F using Tapatalk


CBD05
Sen-Rookie-Sational
Posts: 25
Joined: Thu Apr 08, 2021 1:11 pm

[COM] Re: SAHMRI Stage 2

#231 Post by CBD05 » Fri Sep 10, 2021 5:50 am

citywatcher wrote:
Thu Sep 09, 2021 12:12 pm
I think they found issues they weren't expecting

Sent from my SM-A515F using Tapatalk
Really? What makes you say that citywatcher?

RichyRichc
Sen-Rookie-Sational
Posts: 11
Joined: Thu Oct 01, 2020 8:40 am

[COM] Re: SAHMRI Stage 2

#232 Post by RichyRichc » Sat Sep 11, 2021 9:00 am

EBG wrote:
Wed Sep 08, 2021 9:55 pm
The crane base has been there since 14/11/2020. i thought the crane would have been installed before last Christmas.
That would be an expensive undertaking to have the crane and crew there for such a long time and not being utilised as they mainly have been digging. That crane base and associated piles / footing probably had to go in the same time as the wall piling so the rig didn’t need to come back. Now it’s probably a waiting game for it to go up in line with the reinforcement starting. There must be a 2nd crane or mobiles will be used as I can’t see a single crane in that location servicing the whole building.
citywatcher wrote:
Thu Sep 09, 2021 12:12 pm
I think they found issues they weren't expecting

Sent from my SM-A515F using Tapatalk
I think all the remediation is now complete, why else would the entire site be capped with concrete? That mothball smell is gone too

CBD05
Sen-Rookie-Sational
Posts: 25
Joined: Thu Apr 08, 2021 1:11 pm

[COM] Re: SAHMRI Stage 2

#233 Post by CBD05 » Mon Sep 13, 2021 11:15 am

A friend of mine will be working there soon.
He got inducted recently. Apparently the remediation was completed in April nearly 5 months ahead of schedule!

RichyRichc
Sen-Rookie-Sational
Posts: 11
Joined: Thu Oct 01, 2020 8:40 am

[COM] Re: SAHMRI Stage 2

#234 Post by RichyRichc » Thu Sep 16, 2021 1:00 pm

Tower Crane installation started this afternoon

Listy
High Rise Poster!
Posts: 195
Joined: Sat Oct 01, 2016 11:07 pm

[COM] Re: SAHMRI Stage 2

#235 Post by Listy » Thu Sep 16, 2021 1:01 pm

Crane!

Image

citywatcher
Legendary Member!
Posts: 870
Joined: Sun Jul 15, 2007 5:51 pm

[COM] Re: SAHMRI Stage 2

#236 Post by citywatcher » Thu Sep 16, 2021 1:28 pm

Good news !

Sent from my SM-A515F using Tapatalk


Smithy84
High Rise Poster!
Posts: 123
Joined: Sat Nov 14, 2020 10:18 am

[COM] Re: SAHMRI Stage 2

#237 Post by Smithy84 » Thu Sep 16, 2021 6:42 pm

Will we end up with 2 cranes here? Big site

Listy
High Rise Poster!
Posts: 195
Joined: Sat Oct 01, 2016 11:07 pm

[COM] Re: SAHMRI Stage 2

#238 Post by Listy » Thu Sep 16, 2021 10:32 pm

Smithy84 wrote:
Thu Sep 16, 2021 6:42 pm
Will we end up with 2 cranes here? Big site
The support crane lowered one of the tower segments down into the worksite late in the afternoon. Not sure if they are going to use it to start building a second tower or they were out of time today & are just storing it overnight down there.

CBD05
Sen-Rookie-Sational
Posts: 25
Joined: Thu Apr 08, 2021 1:11 pm

[COM] Re: SAHMRI Stage 2

#239 Post by CBD05 » Fri Sep 17, 2021 1:47 pm

That's the counterweight jib mate

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: SAHMRI Stage 2

#240 Post by EBG » Sat Sep 18, 2021 2:34 pm

see crane news page.