According to the project team, most of the Torrens to Darlington corridor will incorporate a shared-use path, especially along the sections where property acquisition is taking place. I also took some photos of the more detailed design, which is still up for consultation and refinement.
Tonsley Boulevard
Emerson
The tunnel veers away from the Emerson Crossing area. The project team assured me that grade separation is still possible even with the tunnels in place.
Keswick Creek
According to the project team, Keswick Creek will run underneath the road bridge and over the motorway, and will accommodate 1-in-1000-year floods.
Richmond Road
The project team will accommodate the airport's plan for a freight access road extending out from Richmond Road. This intersection will be huge!
Anzac Highway
Talking about big things, there will be 6 lanes on the surface road heading south, 3 turning right to Anzac Highway towards Glenelg and 3 south towards the tunnel entrance and the surface roads. I thought it was overkill, but the traffic modellers disagreed with me.
Tram Stop
I didn't have a chance to ask about the tram stop access, but it looks like the stop may be lengthened?
Anzac Highway Bridge
And finally, it looks like the extra lane along Anzac Highway continues until the old LeCornu site.