Crane Counter: CBD 9 | Metro 6 | Total 15
Re: Crane Counter: CBD 9 | Metro 3 | Total 12
Is the crane count right?
There's the 2 at SAHMRI.
1 at Festival Plaza.
2 at DIT's new HQ on Pirie Street.
2 at Services Australia 65KWS.
1 at the second twin tower project on far end of Flinders Street.
1 next to Vue on KWS in the south end (not sure what the project is though).
1 at Pulteney Street near Calvary Hospital.
Which gives 10 but I feel like I'm missing another one or two?
There's the 2 at SAHMRI.
1 at Festival Plaza.
2 at DIT's new HQ on Pirie Street.
2 at Services Australia 65KWS.
1 at the second twin tower project on far end of Flinders Street.
1 next to Vue on KWS in the south end (not sure what the project is though).
1 at Pulteney Street near Calvary Hospital.
Which gives 10 but I feel like I'm missing another one or two?
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
Re: Crane Counter: CBD 10 | Metro 3 | Total 13
Note after crane 2 was completed on Sunday 6/2/2022 they have shortened the reach of crane 1 so that it can pass in front of the tower part of crane 2. see pictures pic1 after &pic 2 before.
Re: Crane Counter: CBD 10 | Metro 3 | Total 13
Both Pirie street cranes are scheduled to come down this weekend.
-
- High Rise Poster!
- Posts: 293
- Joined: Thu Jul 06, 2017 11:35 am
Re: Crane Counter: CBD 10 | Metro 3 | Total 13
Surprising, theres still a lot of glass paneling that needs to go in on the eastern side
Re: Crane Counter: CBD 10 | Metro 3 | Total 13
The road closure has been updated so maybe you are right they are a bit behind.
First one has been pushed back 2 weeks and the second not till end of March now.
The full road closure of Pirie Street between Gawler Place and Wyatt Street to facilitate the dismantle of two tower cranes on the following dates*:
7:00 am Saturday 26 February to 7:00 pm Sunday 27 February 2022
7:00 am Saturday 26 March to 7:00 pm Sunday 27 March 2022
First one has been pushed back 2 weeks and the second not till end of March now.
The full road closure of Pirie Street between Gawler Place and Wyatt Street to facilitate the dismantle of two tower cranes on the following dates*:
7:00 am Saturday 26 February to 7:00 pm Sunday 27 February 2022
7:00 am Saturday 26 March to 7:00 pm Sunday 27 March 2022
Re: Crane Counter: CBD 11 | Metro 3 | Total 14
There are about 8 crane tower sections stored on the festival plaza site for second crane?
Re: Crane Counter: CBD 11 | Metro 3 | Total 14
From the weekend
Also the lift that takes the crane driver up and down was working - saves a lot of climbing
Also the lift that takes the crane driver up and down was working - saves a lot of climbing