[COM] SAHMRI Stage 2

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
CBD05
Sen-Rookie-Sational
Posts: 25
Joined: Thu Apr 08, 2021 1:11 pm

[COM] Re: SAHMRI Stage 2

#256 Post by CBD05 » Mon Jan 31, 2022 1:08 pm

EBG wrote:
Sun Jan 30, 2022 10:10 pm
The second crane was due to be completed last week (22-23/1/2022) but was called off due to bad weather. then nothing was done this week end (29-30/1/2022) so may be next weekend
Actually the crane that was being used to assemble the tower had a breakdown

Prodical
Legendary Member!
Posts: 603
Joined: Sun May 15, 2016 5:10 pm

[COM] Re: SAHMRI Stage 2

#257 Post by Prodical » Mon Feb 21, 2022 8:56 pm

Taken on weekend - the lift core at street level
Attachments
S3.jpg
S4.jpg
S1.jpg

citywatcher
Legendary Member!
Posts: 870
Joined: Sun Jul 15, 2007 5:51 pm

[COM] Re: SAHMRI Stage 2

#258 Post by citywatcher » Mon Feb 21, 2022 9:19 pm

Have all the basement pours been done ?

Sent from my SM-A515F using Tapatalk


CBD05
Sen-Rookie-Sational
Posts: 25
Joined: Thu Apr 08, 2021 1:11 pm

[COM] Re: SAHMRI Stage 2

#259 Post by CBD05 » Tue Feb 22, 2022 2:00 pm

citywatcher wrote:
Mon Feb 21, 2022 9:19 pm
Have all the basement pours been done ?

Sent from my SM-A515F using Tapatalk
No the bunker still has to come up to ground level.

See the jumpform has completed its first jump. And it looks like a second concrete pump is being installed today

RichyRichc
Sen-Rookie-Sational
Posts: 11
Joined: Thu Oct 01, 2020 8:40 am

[COM] Re: SAHMRI Stage 2

#260 Post by RichyRichc » Thu Feb 24, 2022 4:08 pm

Here's some photos provided by a friend who got to do a site walk earlier this week.
The basement pours are all completed, They have nearly poured all of L00 slab except to the North West corner at the street level

Looking from North Tce level down into the bunker against SAHMRI. You can really see how thick those walls are. What would the giant brace be for in the bottom right of the picture?
3 - Copy.JPG

Solid steel in the Bunker wall
4 - Copy.JPG
Looking back up at North Tce. This is from L00 and the precast one side of the formwork to the patient room bunkers
1 - Copy.JPG

RichyRichc
Sen-Rookie-Sational
Posts: 11
Joined: Thu Oct 01, 2020 8:40 am

[COM] Re: SAHMRI Stage 2

#261 Post by RichyRichc » Thu Feb 24, 2022 4:23 pm

Here are a few more
Another shot of the giant bracing
2 - Copy.JPG
Looking back inside the wall to the Southern corner where the braces are and alot of pipes.
6 - Copy.JPG
Inside a wall and at the precast bracing holding it together until the concrete is poured.
7 - Copy.JPG

User avatar
AG
VIP Member
VIP Member
Posts: 2098
Joined: Thu Jul 21, 2005 9:44 am
Location: Adelaide SA

[COM] Re: SAHMRI Stage 2

#262 Post by AG » Thu Feb 24, 2022 5:13 pm

Those big red braces are temporary propping to the site retaining walls to ensure their stability until the building's floor slabs are completed and take over that role.

Prodical
Legendary Member!
Posts: 603
Joined: Sun May 15, 2016 5:10 pm

[COM] Re: SAHMRI Stage 2

#263 Post by Prodical » Thu Mar 03, 2022 1:54 pm

From last night - finally coming out of the ground after 2 years :)
Attachments
SAHMRI.jpg

Listy
High Rise Poster!
Posts: 195
Joined: Sat Oct 01, 2016 11:07 pm

[COM] Re: SAHMRI Stage 2

#264 Post by Listy » Thu Mar 31, 2022 9:58 am

Taken a couple of days ago - the 'first' floor is being poured (ie the upper basement floor). Can't really see whats happening at the back around the bunker anymore, but I think the bunkers concrete shell is now mostly complete.

Image

Prodical
Legendary Member!
Posts: 603
Joined: Sun May 15, 2016 5:10 pm

[COM] Re: SAHMRI Stage 2

#265 Post by Prodical » Fri Apr 15, 2022 7:58 pm

After 2 years working on the site the SAHMRI is finally coming out of the ground - looks to have been a complex job and hopefully the remaining floors will move faster from now.
Attachments
Sam 3.jpg
Sam 2.jpg
Sam 1.jpg

Prodical
Legendary Member!
Posts: 603
Joined: Sun May 15, 2016 5:10 pm

[COM] Re: SAHMRI Stage 2

#266 Post by Prodical » Fri Apr 15, 2022 7:59 pm

couple more from today
Attachments
Sam 5.jpg
Sam 4.jpg

Prodical
Legendary Member!
Posts: 603
Joined: Sun May 15, 2016 5:10 pm

[COM] Re: SAHMRI Stage 2

#267 Post by Prodical » Tue May 10, 2022 8:01 pm

Taking a long time for the next core rise and to get the floors to ground level. Must be a pretty complex basement area to construct.
Attachments
SAMRI 2.jpg

CBD05
Sen-Rookie-Sational
Posts: 25
Joined: Thu Apr 08, 2021 1:11 pm

[COM] Re: SAHMRI Stage 2

#268 Post by CBD05 » Wed May 11, 2022 5:49 am

Probably doesn't help that they're building it sideways

HiTouch
Legendary Member!
Posts: 787
Joined: Thu Feb 13, 2014 10:40 pm

[COM] Re: SAHMRI Stage 2

#269 Post by HiTouch » Wed May 11, 2022 9:36 am

CBD05 wrote:
Wed May 11, 2022 5:49 am
Probably doesn't help that they're building it sideways
I can't be too sure but I think it's the way the camera is held that is making the building look sideways.

Listy
High Rise Poster!
Posts: 195
Joined: Sat Oct 01, 2016 11:07 pm

[COM] Re: SAHMRI Stage 2

#270 Post by Listy » Wed May 11, 2022 11:31 am

The floor for the 'upper' basement level is pretty much done, and a second lift box is now going up. Everyone seemed to take about 3 weeks off around Easter, so that might explain the slowdown. Will the synchrotron be getting dropped into the bunker soon I wonder?

Image

Post Reply

Who is online

Users browsing this forum: Jamminmelo15 and 7 guests