That's the union for ya.SouthAussie94 wrote: ↑Fri Aug 12, 2022 2:30 pmProbably the rain!A-Town wrote: ↑Fri Aug 12, 2022 1:24 pmNo one was on site at all today. Something is definitely wrong.SouthAussie94 wrote: ↑Thu Aug 11, 2022 11:20 amThere have been issues with some of the subcontractors on this site. Insolvency issues...
Could be a reason for the slow pace of things.
[COM] 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
-
- Legendary Member!
- Posts: 870
- Joined: Sun Jul 15, 2007 5:51 pm
[COM] Re: [U/C] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
Well if contractors ain't been paid why is that the unions fault ?rev wrote:That's the union for ya.
Sent from my SM-A515F using Tapatalk
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
Update from today. Proof this is still progressing.... slowly
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
A difficult site to get ant photos
The lift core has started and the concrete distributor boom installed last week.
The lift core has started and the concrete distributor boom installed last week.
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Westin Hotel
Yep, I feel especially sorry for the restaurant Eleven bordering this property. A high-end establishment that opened just before demolition started. They must be absolutely spewing at the slow progress on this site. It would've no doubt affected their business.
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
From what I can gather there's significant work going into the GPO as well which isn't as visible as other parts of the construction. Once these are stabilised and sured up, more of the new super structure will commence.
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
This isn't quite your typical construction site. Given the proximity of excavation and construction to an existing heritage building, I imagine extra care and checks are in place to ensure that there isn't any accidental undermining and compromising of the existing heritage building.
Once the core and floor slabs pass ground level, it should be a lot quicker going forward.
Once the core and floor slabs pass ground level, it should be a lot quicker going forward.
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
The slabs are at ground level now.
-
- Sen-Rookie-Sational
- Posts: 8
- Joined: Fri Oct 21, 2022 3:27 pm
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
Just came across this forum/thread so thought I'd be able to help with updates.
They've only just extended the concrete distribution boom on a tower and now setting up the raising/moveable decking over the lift shafts.
Being a handyman I'm not familiar with major construction, but it appears that the formwork below the decking will raise up after each shaft level walls are poured.
The grey steel framework under the deck is supported on adjustable jacks.
At the bottom of the picture you can just see some white roofing. That is prefab sections that I an assuming will form a roof over the deck.
Cheers
They've only just extended the concrete distribution boom on a tower and now setting up the raising/moveable decking over the lift shafts.
Being a handyman I'm not familiar with major construction, but it appears that the formwork below the decking will raise up after each shaft level walls are poured.
The grey steel framework under the deck is supported on adjustable jacks.
At the bottom of the picture you can just see some white roofing. That is prefab sections that I an assuming will form a roof over the deck.
Cheers
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2780
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
Welcome! Cheers for the photo - you're in a great spot for this one.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
Looks like the jumpform for the core is being installed.
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
Not much to see from the ground level just yet.
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
There are more columns being framed and poured and it is finally out of the ground. With the heritage buildings adjacent and the compact site, it has probably taken a lot longer than a normal build.
Will be good to have a Marriott in town
Will be good to have a Marriott in town