Crane Counter: CBD 9 | Metro 6 | Total 15

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 12 | Metro 9 | Total 21

#1861 Post by EBG » Mon May 01, 2023 10:06 pm

Picture (1 May 23) of the 2 cranes at 88 O'Connell st. the new crane is on the left.
Attachments
20230501_o connell st.jpg

crawf
Donating Member
Donating Member
Posts: 5521
Joined: Thu Feb 16, 2006 7:49 pm
Location: Adelaide

Re: Crane Counter: CBD 12 | Metro 9 | Total 21

#1862 Post by crawf » Tue May 02, 2023 12:13 am

EBG wrote:
Mon May 01, 2023 10:06 pm
Picture (1 May 23) of the 2 cranes at 88 O'Connell st. the new crane is on the left.
Never thought I'd see this day....

Prodical
Legendary Member!
Posts: 603
Joined: Sun May 15, 2016 5:10 pm

Re: Crane Counter: CBD 12 | Metro 9 | Total 21

#1863 Post by Prodical » Sat May 13, 2023 4:36 pm

One of the SAHMRI cranes came down today :(
Attachments
sahmri.jpg

Capbld
Sen-Rookie-Sational
Posts: 36
Joined: Tue Jul 30, 2019 8:44 am

Re: Crane Counter: CBD 11 | Metro 9 | Total 20

#1864 Post by Capbld » Sun May 14, 2023 10:04 am

Crane went up at Lyell Mc Yesterday

luffingjib
Sen-Rookie-Sational
Posts: 44
Joined: Thu Dec 19, 2019 9:57 am

Re: Crane Counter: CBD 11 | Metro 9 | Total 20

#1865 Post by luffingjib » Sun May 14, 2023 10:08 am

Burnside crane 2 base was poured on Friday


Sent from my iPhone using Tapatalk

SBD
Super Size Scraper Poster!
Posts: 2723
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview

Re: Crane Counter: CBD 11 | Metro 9 | Total 20

#1866 Post by SBD » Mon May 15, 2023 8:59 am

Capbld wrote:
Sun May 14, 2023 10:04 am
Crane went up at Lyell Mc Yesterday
What is the current construction there?

Capbld
Sen-Rookie-Sational
Posts: 36
Joined: Tue Jul 30, 2019 8:44 am

Re: Crane Counter: CBD 11 | Metro 10 | Total 21

#1867 Post by Capbld » Mon May 15, 2023 9:14 am


SBD
Super Size Scraper Poster!
Posts: 2723
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview

Re: Crane Counter: CBD 11 | Metro 10 | Total 21

#1868 Post by SBD » Mon May 15, 2023 12:27 pm

Capbld wrote:
Mon May 15, 2023 9:14 am
Its a new 48 bed department

https://www.premier.sa.gov.au/media-rel ... sis-chairs
Thanks.

That says the new wards will be on level 3 of building A that was built as a cold shell ten years ago. It seems odd that a tower crane is required for what sounds like it is essentially an internal fitout.

urban
Legendary Member!
Posts: 610
Joined: Thu Apr 12, 2007 10:59 am
Location: City of Unley

Re: Crane Counter: CBD 11 | Metro 10 | Total 21

#1869 Post by urban » Thu May 18, 2023 12:53 pm

SBD wrote:
Mon May 15, 2023 12:27 pm
Capbld wrote:
Mon May 15, 2023 9:14 am
Its a new 48 bed department

https://www.premier.sa.gov.au/media-rel ... sis-chairs
Thanks.

That says the new wards will be on level 3 of building A that was built as a cold shell ten years ago. It seems odd that a tower crane is required for what sounds like it is essentially an internal fitout.
This is a level 3 extension to the existing building - new external walls and roof. Only 2 floors were built but there is a helipad above.

https://www.google.com.au/maps/@-34.749 ... 384!8i8192

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 11 | Metro 10 | Total 21

#1870 Post by EBG » Sat May 27, 2023 9:48 pm

back to 20 cranes-The southern crane (closest to North Tce) came down today at the festival plaza tower, only some tower sections remain at 5 pm Saturday 27/5/2023.
Attachments
20230527_festival plaza 1.jpg
20230527_festival plaza 2.jpg
Last edited by EBG on Sat May 27, 2023 9:58 pm, edited 1 time in total.

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 11 | Metro 10 | Total 21

#1871 Post by EBG » Sat May 27, 2023 9:53 pm

Could be back up to 21 cranes soon - picture of crane base for project on corner of Frome St and Pirie St (excuse blue shade cloth in picture.
Attachments
20230527_frome st.jpg

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 11 | Metro 10 | Total 21

#1872 Post by EBG » Sat May 27, 2023 10:02 pm

Finally got a picture of the crane at lyelle McEwin hospital at Elizabeth
Attachments
20230527_Elizabeth.jpg

Capbld
Sen-Rookie-Sational
Posts: 36
Joined: Tue Jul 30, 2019 8:44 am

Re: Crane Counter: CBD 11 | Metro 10 | Total 21

#1873 Post by Capbld » Sun May 28, 2023 10:58 am

One crane coming down at TQEH today.

luffingjib
Sen-Rookie-Sational
Posts: 44
Joined: Thu Dec 19, 2019 9:57 am

Re: Crane Counter: CBD 11 | Metro 10 | Total 21

#1874 Post by luffingjib » Sun May 28, 2023 11:15 am

Burnside crane 2 next weekend


Sent from my iPhone using Tapatalk

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

Re: Crane Counter: CBD 10 | Metro 9 | Total 19

#1875 Post by EBG » Fri Jun 02, 2023 11:45 am

tower crane sections for Burnside Village second crane going up this morning.