Crane Counter: CBD 9 | Metro 6 | Total 15
Re: Crane Counter: CBD 10 | Metro 9 | Total 19
The festival plaza crane could come down in next weekend or two now that most of the external work is complete
Re: Crane Counter: CBD 10 | Metro 9 | Total 19
The crane at the Durham Street site at Glenelg came down yesterday. Down to 18.
Re: Crane Counter: CBD 10 | Metro 8 | Total 18
Crane base being erected over top of lane way on west side of site. 19/8/2023
Re: Crane Counter: CBD 10 | Metro 8 | Total 18
Synergy took over the site only 7 weeks ago today, on July 1st.
Piling completed and the raft foundations being set up + crane base on site.
They are pretty damn good
Piling completed and the raft foundations being set up + crane base on site.
They are pretty damn good
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
Re: Crane Counter: CBD 10 | Metro 8 | Total 18
Not the best photo, but a cool angle.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
- SouthAussie94
- Legendary Member!
- Posts: 585
- Joined: Tue Mar 27, 2012 10:03 pm
- Location: Southern Suburbs
Re: Crane Counter: CBD 10 | Metro 8 | Total 18
Crane Base installed at 120 The Parade, Norwood.
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
Re: Crane Counter: CBD 10 | Metro 8 | Total 18
Pirie street and festival plaza cranes coming down today.
Re: Crane Counter: CBD 10 | Metro 8 | Total 18
So 2 down at Festival Plaza and 185 Pirie Street, but 1 up at Victoria Tower.
-
- Sen-Rookie-Sational
- Posts: 43
- Joined: Mon Jan 30, 2017 2:11 pm
Re: Crane Counter: CBD 9 | Metro 8 | Total 17
Yesterday afternoon with the 400tonner w fly jibb taking her down.
Re: Crane Counter: CBD 10 | Metro 8 | Total 18
Down to 15 now
South Terrace to come down in coming months and the Flinders Crane this weekend. Franklin Street to go up and one in Norwood
Nothing expected to start soon. Hopefully some surprises.
Completed 2023
Festival Plaza Tower............................................29 (115m)
52-66 King William Street - Southern Cross................15
SAHMRI 2........................................................12
Field street.....................................................8
57 Wyatt Street ...............................................8
185 Pirie Street................................................8
Completed Metro 2023
Coles - Norwood...........................................6
Durham Street Glenelg
Queen Elizabeth Hospital redevelopment
Flinders Hospital redevelopment
Location.....................................................Levels............................Crane
Under Construction/SWP CBD/North Adelaide
Central Market Arcade....................................35 (131m)
32 Grote Street...............................................35 (127m)...................................1
42-56 Franklin Street..........................................21
181 Waymouth Street.........................................17...................................1
88 O'connell .....................................................16..................................2
GPO Westin Hotel...............................................16..................................1
353-359 King William Street..................................16
278 South Terrace.............................................8.....................................1
211 Pirie Street...............................................6.....................................1
Former Internode building - Grenfell Street....................................................1
Botanic High...................................................6.....................................1
TOTAL CBD CRANES:............................................................................9
Under Construction/SWP METRO
Mawson Lakes Holiday Inn...............................12....................................1
Quayview at Adelphi Glenelg............................7.....................................1
120 The Parade, Norwood................................7.....................................1
Colley Terrace Glenelg....................................6.....................................1
Burnside Village ..................................................................................2
Bolivar Water Works...............................................................................1
TOTAL METRO CRANES:.........................................................................7
TOTAL ADELAIDE CRANES:.....................................................................16
Commencing Soon
Approved/Proposed Upcoming
254 North Terrace.........................................40 (187m) (VIS)
207-209 Pulteney Street..................................55 (180m) (ONH)
75-79 King William Street................................39 (132m) (ONH)
29 Twin Street.............................................38 (124m) (ONH)
Trinity Church North Terrace............................28
51 Pirie Street (Hyatt)....................................24 ONH
157 Waymouth Street....................................23 ONH
14 Bentham Street........................................18 ONH
154 Angas Street...........................................16 (2024)
2-6 Hutt Street.............................................16 ONH
Metro
Parkline - Kent Town ....................................12
Ramada Hotel - Elizabeth ...............................8
South Terrace to come down in coming months and the Flinders Crane this weekend. Franklin Street to go up and one in Norwood
Nothing expected to start soon. Hopefully some surprises.
Completed 2023
Festival Plaza Tower............................................29 (115m)
52-66 King William Street - Southern Cross................15
SAHMRI 2........................................................12
Field street.....................................................8
57 Wyatt Street ...............................................8
185 Pirie Street................................................8
Completed Metro 2023
Coles - Norwood...........................................6
Durham Street Glenelg
Queen Elizabeth Hospital redevelopment
Flinders Hospital redevelopment
Location.....................................................Levels............................Crane
Under Construction/SWP CBD/North Adelaide
Central Market Arcade....................................35 (131m)
32 Grote Street...............................................35 (127m)...................................1
42-56 Franklin Street..........................................21
181 Waymouth Street.........................................17...................................1
88 O'connell .....................................................16..................................2
GPO Westin Hotel...............................................16..................................1
353-359 King William Street..................................16
278 South Terrace.............................................8.....................................1
211 Pirie Street...............................................6.....................................1
Former Internode building - Grenfell Street....................................................1
Botanic High...................................................6.....................................1
TOTAL CBD CRANES:............................................................................9
Under Construction/SWP METRO
Mawson Lakes Holiday Inn...............................12....................................1
Quayview at Adelphi Glenelg............................7.....................................1
120 The Parade, Norwood................................7.....................................1
Colley Terrace Glenelg....................................6.....................................1
Burnside Village ..................................................................................2
Bolivar Water Works...............................................................................1
TOTAL METRO CRANES:.........................................................................7
TOTAL ADELAIDE CRANES:.....................................................................16
Commencing Soon
Approved/Proposed Upcoming
254 North Terrace.........................................40 (187m) (VIS)
207-209 Pulteney Street..................................55 (180m) (ONH)
75-79 King William Street................................39 (132m) (ONH)
29 Twin Street.............................................38 (124m) (ONH)
Trinity Church North Terrace............................28
51 Pirie Street (Hyatt)....................................24 ONH
157 Waymouth Street....................................23 ONH
14 Bentham Street........................................18 ONH
154 Angas Street...........................................16 (2024)
2-6 Hutt Street.............................................16 ONH
Metro
Parkline - Kent Town ....................................12
Ramada Hotel - Elizabeth ...............................8
- gnrc_louis
- Legendary Member!
- Posts: 981
- Joined: Sat Nov 10, 2018 2:04 pm
- Location: Adelaide
Re: Crane Counter: CBD 9 | Metro 7 | Total 16
Good to see two 100m + developments with SWP. Hopefully we get some progress on 75-79 King William Street and maybe even 29 Twin Street gets refloated.
Re: Crane Counter: CBD 9 | Metro 7 | Total 16
you have not include the hammer head crane at Bolivar sewage works in the suburban total, this has been up for a couple of months.
Who is online
Users browsing this forum: No registered users and 3 guests