[U/C] Central Market Arcade Redevelopment | 130m | 39 levels
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
Still no action on site. It’s way too early for a Christmas shutdown. Something seems off…
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
they should just lay some asphalt there if the development is stalled
it'd be a great location for a flea market
it'd be a great location for a flea market
tired of low IQ hacks
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
two separate local traders mentioned asbestos was found on site. i guess the logistics of removing that's the focus for now.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: [SWP] Re: Central Market Arcade Redevelopment | 130m | 39 levels
I'm not sure a Christmas shutdown is in anyone's interest after this being an original delay last year.Ben wrote:Still no action on site. It’s way too early for a Christmas shutdown. Something seems off…
I'm losing a bit of optimism for this.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
I have a bad feeling that this one is (at best) stalled.
Talking to a Synergy guy on the site opposite last week, he said the rumour was that multiplex cannot build it for the price - a parallel story to Lot 14 and the indigenous museum.
The IEC building at Lot 14 has also stalled + there are v few new proposals for the CBD coming through the SCAP.
Not good.
Talking to a Synergy guy on the site opposite last week, he said the rumour was that multiplex cannot build it for the price - a parallel story to Lot 14 and the indigenous museum.
The IEC building at Lot 14 has also stalled + there are v few new proposals for the CBD coming through the SCAP.
Not good.
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
This is very worrisome. These are also prime spaces and now empty lots. For the central markets this is a disaster if nothing comes from this latest proposal.
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
The cost of building is astronomical at the moment, so it wouldn't surprise me if the rumours are true.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
I had a chat with Norman about this. We agreed it is possible that some builders are deliberately waiting for the cost of labour/shortages to drop before going ahead.
Short term pain.
Short term pain.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
- notmichaeljfox
- High Rise Poster!
- Posts: 124
- Joined: Sun Apr 17, 2011 5:16 pm
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
Something is happening on site. The trucks said suction.
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
I'd say it's all part of the asbestos removal. I'd also expect some temporary tent/cover structures to be set up too.
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
I can confirm the removal of 60m2 of asbestos (friable) contaminated soil. Works were slated for completion by 17/10/2023 (where the pump truck is). Further contamination was detected of 80m2 of (friable) contaminated soil, works to be undertaken from 19/10 - 30/11/2023. Aint know one going on that site until they are sure that all asbestos removed unless they can isolate different areas.
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
So hopefully this eases everyone's fears of this site and its future!mattblack wrote: ↑Mon Oct 23, 2023 2:03 pmI can confirm the removal of 60m2 of asbestos (friable) contaminated soil. Works were slated for completion by 17/10/2023 (where the pump truck is). Further contamination was detected of 80m2 of (friable) contaminated soil, works to be undertaken from 19/10 - 30/11/2023. Aint know one going on that site until they are sure that all asbestos removed unless they can isolate different areas.
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
mattblack wrote: ↑Mon Oct 23, 2023 2:03 pm
I can confirm the removal of 60m2 of asbestos (friable) contaminated soil. Works were slated for completion by 17/10/2023 (where the pump truck is). Further contamination was detected of 80m2 of (friable) contaminated soil, works to be undertaken from 19/10 - 30/11/2023. Aint know one going on that site until they are sure that all asbestos removed unless they can isolate different areas.
Oh come on, I was enjoying watching people take wild guesses.
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
Sorry, my apologies for ruining people's funrev wrote: ↑Mon Oct 23, 2023 4:09 pmmattblack wrote: ↑Mon Oct 23, 2023 2:03 pm
I can confirm the removal of 60m2 of asbestos (friable) contaminated soil. Works were slated for completion by 17/10/2023 (where the pump truck is). Further contamination was detected of 80m2 of (friable) contaminated soil, works to be undertaken from 19/10 - 30/11/2023. Aint know one going on that site until they are sure that all asbestos removed unless they can isolate different areas.
Oh come on, I was enjoying watching people take wild guesses.
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
what risk mitigation have they done for the general public?mattblack wrote: ↑Mon Oct 23, 2023 9:26 pmSorry, my apologies for ruining people's funrev wrote: ↑Mon Oct 23, 2023 4:09 pmmattblack wrote: ↑Mon Oct 23, 2023 2:03 pm
I can confirm the removal of 60m2 of asbestos (friable) contaminated soil. Works were slated for completion by 17/10/2023 (where the pump truck is). Further contamination was detected of 80m2 of (friable) contaminated soil, works to be undertaken from 19/10 - 30/11/2023. Aint know one going on that site until they are sure that all asbestos removed unless they can isolate different areas.
Oh come on, I was enjoying watching people take wild guesses.
the weather has been dry and windy blowing up all kinds of dust from that site...many people live, shop and work in the area obviously
tired of low IQ hacks
Who is online
Users browsing this forum: abc, Majestic-12 [Bot] and 7 guests