[COM] 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
User avatar
Spotto
Legendary Member!
Posts: 753
Joined: Wed May 15, 2019 9:05 pm

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#556 Post by Spotto » Tue Nov 21, 2023 6:53 am

When did Telstra switch back to the Blue and Orange?

User avatar
Ursus Maritimus
High Rise Poster!
Posts: 218
Joined: Fri Nov 25, 2022 4:54 pm

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#557 Post by Ursus Maritimus » Tue Nov 21, 2023 1:25 pm

This is what it looks like now, taken a few minutes ago:
Screenshot_20231121_132230_Video Player.jpg

User avatar
Algernon
Super Size Scraper Poster!
Posts: 1629
Joined: Sat Jul 09, 2005 9:46 pm
Location: Moravia

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#558 Post by Algernon » Tue Nov 21, 2023 5:47 pm

Telstra logo looks like when you have high rise council flats and someone dangled a TV satellite over their balcony


User avatar
Ursus Maritimus
High Rise Poster!
Posts: 218
Joined: Fri Nov 25, 2022 4:54 pm

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#560 Post by Ursus Maritimus » Mon Dec 04, 2023 8:52 pm

The NAB branch and Breitling shop have opened.
Screenshot_20231204_205051_Gallery.jpg

A-Town
High Rise Poster!
Posts: 422
Joined: Tue Aug 15, 2017 10:14 am

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#561 Post by A-Town » Mon Dec 04, 2023 11:11 pm

Ursus Maritimus wrote:
Mon Dec 04, 2023 8:52 pm
The NAB branch and Breitling shop have opened.

Screenshot_20231204_205051_Gallery.jpg
Looks good. Do you know when the stores on the eastern side of the building on James Place are set to open?

User avatar
Ursus Maritimus
High Rise Poster!
Posts: 218
Joined: Fri Nov 25, 2022 4:54 pm

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#562 Post by Ursus Maritimus » Tue Dec 12, 2023 4:40 pm

A-Town wrote:
Mon Dec 04, 2023 11:11 pm
Ursus Maritimus wrote:
Mon Dec 04, 2023 8:52 pm
The NAB branch and Breitling shop have opened.

Screenshot_20231204_205051_Gallery.jpg
Looks good. Do you know when the stores on the eastern side of the building on James Place are set to open?
I have no idea sorry - no communications about that or King's Lane eateries.

Vasco
High Rise Poster!
Posts: 140
Joined: Wed Jul 11, 2018 9:02 pm

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#563 Post by Vasco » Tue Dec 12, 2023 10:27 pm

Image

Waymouth St vantage point


Sent from my iPhone using Tapatalk

Eurostar
Legendary Member!
Posts: 954
Joined: Thu Jun 24, 2010 3:44 pm

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#564 Post by Eurostar » Wed Dec 13, 2023 2:15 pm

Vasco wrote:
Tue Dec 12, 2023 10:27 pm
Image

Waymouth St vantage point


Sent from my iPhone using Tapatalk
That top floor would make for a good observation deck or a restaurant/bar space

User avatar
Ursus Maritimus
High Rise Poster!
Posts: 218
Joined: Fri Nov 25, 2022 4:54 pm

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#565 Post by Ursus Maritimus » Sat Dec 30, 2023 10:45 pm

I can't say it looks great from a distance or from a high vantage point - it can look stumpy and the glazing doesn't reflect well. However it really shines literally and figuratively when viewed from ground level and it reflects the sky.

User avatar
Ursus Maritimus
High Rise Poster!
Posts: 218
Joined: Fri Nov 25, 2022 4:54 pm

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#566 Post by Ursus Maritimus » Thu Feb 08, 2024 9:44 pm

For what it's worth, I think fellow Sensational Adelaide members would want to know what happens when energy efficiency is done poorly.

When you request a lift, the wait for one to even arrive can be a minute or more. The afternoon is the worst, when it stops at every floor on the way down, including when it's already full. This makes people miss their public transport and leads to a lot of unnecessary stress and frustration. Two to three minutes may not sound like a lot of time to get out of a building, but it seems like forever when you've been using conventional lifts all your life, and such a trip used to take 45 seconds. I thought technology was supposed to make our lives better, not annoy us when we're just trying to get on with our day.

They also break down awfully frequently for brand-new units - one goes out of order at least every couple of weeks, adding more minutes to the waits. We were advised that the building managers are working on re-programming the lifts, and flew in Schindler specialists from Sydney.

I'm sure they'll work something out. It's a very in-your-face teething problem in what is otherwise a fantastic place to work. The hot-desking is not an issue - you just plug your Surface Pro into the desk and away you go. The views are beautiful and the air conditioning maintains an absolutely perfect temperature no matter what's happening outside - no hot or cold spots or moments. The moral of the story is not to go overboard with energy efficiency in lifts - it leads to irritated workers.

User avatar
Llessur2002
Super Size Scraper Poster!
Posts: 2137
Joined: Mon Mar 17, 2014 4:59 pm
Location: Inner West

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#567 Post by Llessur2002 » Fri Feb 09, 2024 10:22 am

Ursus Maritimus wrote:
Thu Feb 08, 2024 9:44 pm
For what it's worth, I think fellow Sensational Adelaide members would want to know what happens when energy efficiency is done poorly.

When you request a lift, the wait for one to even arrive can be a minute or more. The afternoon is the worst, when it stops at every floor on the way down, including when it's already full. This makes people miss their public transport and leads to a lot of unnecessary stress and frustration. Two to three minutes may not sound like a lot of time to get out of a building, but it seems like forever when you've been using conventional lifts all your life, and such a trip used to take 45 seconds. I thought technology was supposed to make our lives better, not annoy us when we're just trying to get on with our day.

They also break down awfully frequently for brand-new units - one goes out of order at least every couple of weeks, adding more minutes to the waits. We were advised that the building managers are working on re-programming the lifts, and flew in Schindler specialists from Sydney.

I'm sure they'll work something out. It's a very in-your-face teething problem in what is otherwise a fantastic place to work. The hot-desking is not an issue - you just plug your Surface Pro into the desk and away you go. The views are beautiful and the air conditioning maintains an absolutely perfect temperature no matter what's happening outside - no hot or cold spots or moments. The moral of the story is not to go overboard with energy efficiency in lifts - it leads to irritated workers.
We had a similar problem in an office I previously worked in when the company installed new smart lifts. It caused several weeks of disruption but, as in your case, Otis came back a couple of times to modify their programming and eventually all was good. I'm not sure what level of modelling goes in to smart lift programming but presumably local and building-level intricacies can mean that people movement at peak times can end up being quite different in reality to what was envisaged during planning.

User avatar
Ursus Maritimus
High Rise Poster!
Posts: 218
Joined: Fri Nov 25, 2022 4:54 pm

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#568 Post by Ursus Maritimus » Fri Feb 09, 2024 4:45 pm

Giving the benefit of the doubt, I guess modelling the people movements before the tenants actually move in is an inexact science. It's much better than what it was a few weeks ago. It's just a very annoying thing to deal with day in, day out. Getting to work and getting home to your family are very basic things.

abc
Legendary Member!
Posts: 1221
Joined: Tue Sep 27, 2022 10:35 pm

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#569 Post by abc » Fri Feb 09, 2024 5:11 pm

smart lifts :lol:
tired of low IQ hacks

User avatar
AG
VIP Member
VIP Member
Posts: 2099
Joined: Thu Jul 21, 2005 9:44 am
Location: Adelaide SA

[COM] Re: 52-66 King William Street | 65m | 15 Levels | Southern Cross Arcade

#570 Post by AG » Sat Feb 10, 2024 11:39 pm

One of the biggest problems with smart destination control style lifts is that not everyone taps on to the control panel, which results in the lifts constantly underestimating the demand. Classic case is when a group of coworkers walks back into the building, one person scans to get the lift, and then no one else does. The lift thinks there is only one person waiting when it could be 5 or 6.

Post Reply

Who is online

Users browsing this forum: Bing [Bot] and 4 guests