[U/C] 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Not sure if this means anything...
But there were two Delta trucks in the parking area out front today - Delta do demolition so hopefully TBC.
But there were two Delta trucks in the parking area out front today - Delta do demolition so hopefully TBC.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Synergy have picked this up, walked past earlier today and Delta were inside undertaking demolishing works, this project is definitely live and underway.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Thanks
Great that an Adelaide based construction company has picked this up - and they move quickly
Great that an Adelaide based construction company has picked this up - and they move quickly
- baytram366
- High Rise Poster!
- Posts: 467
- Joined: Tue Oct 16, 2007 4:06 pm
- Contact:
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
I have read conflicting information on this one. Are they keeping the facade of the current building or not?
Baytram 366's Flickr:
www.flickr.com/photos/baytram366
www.flickr.com/photos/baytram366
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
does not seem to be retained from their photo.
Pity - it could have blended in well.
Pity - it could have blended in well.
[U/C] Re: [APP] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
In this application No 22032905 by Hindmarsh, work is described as "Part demolition of existing building (canopy)". There is a separate application No. 22008384 by Doma c/o Future Urban for demolition of the entire building.AG wrote: ↑Sat Oct 01, 2022 12:12 pmProbably a reference to the front facade being kept as part of the new building.citywatcher wrote: ↑Fri Sep 30, 2022 11:12 pmWhy only a partial demolition?Ben wrote:SCAP
Sent from my SM-A515F using Tapatalk
Last edited by PD2/20 on Tue May 07, 2024 1:20 pm, edited 1 time in total.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Maybe the existing facade will be incorporated as part of the first 2 levels? Hard to see in the available photos. This one seems to show the facade included.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Terrific work, looking forward to see the progress of the site!
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
There were lots of people on site yesterday - 20+ and installing barriers and with a bob cat inside. Will get a photo on the weekend but it is definitely underway
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
There were lots of people on site yesterday - 20+ and installing barriers and with a bob cat inside. Will get a photo on the weekend but it is definitely underway
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
The rear 2/3 of the building is almost demolished - will try to get some photos on the weekend.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Walked past yesterday and the front of the building was all tarped/covered up. Still a little sad they couldnt find a way to integrate the existing facade in to the design.
Lets just hope this doesnt get demolished and left empty.
Lets just hope this doesnt get demolished and left empty.
- Llessur2002
- Super Size Scraper Poster!
- Posts: 2137
- Joined: Mon Mar 17, 2014 4:59 pm
- Location: Inner West
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Courtesy of abando_hunters on Instagram.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Can anyone share plans of the proposed development? I can't find them anywhere!
It looked as though they had been intending to save the front facade, even having people jackhammer the facade to a desired height. After a few days of inactivity (probably for engineer consultation) they are back and the whole facade is coming down. I guess it wasn't structurally viable?
It looked as though they had been intending to save the front facade, even having people jackhammer the facade to a desired height. After a few days of inactivity (probably for engineer consultation) they are back and the whole facade is coming down. I guess it wasn't structurally viable?