I'm pretty sure that was in some released plans, not sure where...
[U/C] M2 North-South Motorway
[U/C] Re: M2 North-South Motorway
[U/C] Re: M2 North-South Motorway
Richmond Road works were announced in James Congdon Drive connection section of https://www.t2d.sa.gov.au/planning-desi ... gn-changes.
Some detail appear in the Northern Tunnel Southern Portal map https://www.t2d.sa.gov.au/__data/assets ... v12-A4.pdf.
-
- Legendary Member!
- Posts: 608
- Joined: Fri Mar 13, 2020 5:03 pm
[U/C] Re: M2 North-South Motorway
Images don’t seem to display for me?
Also are you able to copy the article ?
Sent from my iPhone using Tapatalk
-
- Legendary Member!
- Posts: 608
- Joined: Fri Mar 13, 2020 5:03 pm
[U/C] Re: M2 North-South Motorway
Heres the full article, I''ve added the images in a different format at the bottom for you
North-South Corridor project consortium selected as plans tweaked and earlier finish touted
Tweaks have been made to the long-awaited South Rd tunnels project as a major milestone is reached, with hopes it may open sooner than expected. See the new video.
The long-awaited and highly anticipated South Rd tunnels project has been revised again as hopes grow it may be delivered earlier than the expected 2031 completion date.
Prime Minister Anthony Albanese was in Adelaide on Sunday morning with Premier Peter Malinauskas and Transport Minister Tom Koutsantonis announcing an update, including the selection of the construction consortium.
The $15.4bn project will be built by a consortium comprising John Holland, Bouygues Construction, Arcadis Australia, Jacobs and Ventia, who have vowed to come in on budget.
The group has confirmed it will use three tunnel boring machines during construction, instead of the expected two, meaning both the south and north tunnels can be built concurrently.
This has raised hopes the project will be delivered earlier than expected.
“We’ll have three tunnel boring machines operating instead of two – guaranteeing this project will be delivered on time,” Mr Malinauskas said.
“In fact, once the TBMs arrive next summer, we’re hopeful the delivery deadline can be brought forward.”
The consortium has confirmed it will implement enhancements to the project that were not a part of the reference design from December 2022,
including:
A connection free from traffic lights between the motorway and James Congdon Drive, providing seamless access to and from the CBD;
INNOVATIVE tunnel portal arrangements that enable improved and lowered motorway sections with faster construction times and reduced costs;
MORE trees planted to help green the corridor;
IMPROVED tunnel design and shorter cut and cover tunnel sections, which will reduce energy use and costs, and minimise surface impacts to communities next to the motorway;
INNOVATION for the construction of tunnel cross passages for safety, and other systems elements of the tunnels; and
IMPROVED experience for cyclists and pedestrians with universally accessible paths, shared-use paths and active travel corridors, with regular safe east-west connections.
Mr Koutsantonis hailed the selection of the construction consortium in the third quarter of 2024, as they had promised.
“This is a historic day for South Australia, as we now know who will be delivering the largest infrastructure project in our state’s history – and we hope to deliver it earlier than previously anticipated,” he said.
Once finished, the project will allow motorists to avoid 21 existing sets of traffic lights between the River Torrens and Darlington and will complete the non-stop 78km North-South Corridor between Gawler and Old Noarlunga.
Traffic is expected to move between West Hindmarsh and Darlington in as little as nine minutes, shaving up to 40 minutes off peak hour travel times.
About 5500 jobs per year will be created during the main construction, with 90 per cent of labour hours to be undertaken by South Australians.
Ninety per cent of workers are expected to be South Australians. The consortium has committed to a minimum of 6 per cent Indigenous employment on the project, as well as more than 600 jobs for apprentices and trainees, and opportunities for more than 220 long-term unemployed people.
Main construction works will start in 2025, with tunnel boring machine works for the southern tunnels planned to begin in the second half of 2026.
[U/C] Re: M2 North-South Motorway
so they don't start digging for another 2 years assuming they stick to schedule
tired of low IQ hacks
[U/C] Re: M2 North-South Motorway
Hopefully once Torrens to Darlington begins the government will set to work planning the next big infrastructure project so we can retain the skills gained from this project and roll that expertise over to the next project. Likewise with the group that will be grade separating the tram line.
A continuous pipeline of works is the only sensible way to build big infrastructure.
A continuous pipeline of works is the only sensible way to build big infrastructure.
[U/C] Re: M2 North-South Motorway
Agreed. If this will be done by 2030, we should be planning now for the city rail tunnel to start from about the same time if not earlier. Complete it by 2036 for the state's bicentennial.Spotto wrote: ↑Sun Aug 11, 2024 6:38 pmHopefully once Torrens to Darlington begins the government will set to work planning the next big infrastructure project so we can retain the skills gained from this project and roll that expertise over to the next project. Likewise with the group that will be grade separating the tram line.
A continuous pipeline of works is the only sensible way to build big infrastructure.
Keep Adelaide Weird
[U/C] Re: M2 North-South Motorway
Was about to post the same thing, with 3 TBM's they should start looking at rail infrastructure next.SRW wrote: ↑Sun Aug 11, 2024 6:59 pmAgreed. If this will be done by 2030, we should be planning now for the city rail tunnel to start from about the same time if not earlier. Complete it by 2036 for the state's bicentennial.Spotto wrote: ↑Sun Aug 11, 2024 6:38 pmHopefully once Torrens to Darlington begins the government will set to work planning the next big infrastructure project so we can retain the skills gained from this project and roll that expertise over to the next project. Likewise with the group that will be grade separating the tram line.
A continuous pipeline of works is the only sensible way to build big infrastructure.
[U/C] Re: M2 North-South Motorway
Not an expert by any means, however my understanding is that the TBMs get buried on site as is too complex/costly to remove / reuse and have been designed for a specific purpose?rev wrote:Was about to post the same thing, with 3 TBM's they should start looking at rail infrastructure next.SRW wrote: ↑Sun Aug 11, 2024 6:59 pmAgreed. If this will be done by 2030, we should be planning now for the city rail tunnel to start from about the same time if not earlier. Complete it by 2036 for the state's bicentennial.Spotto wrote: ↑Sun Aug 11, 2024 6:38 pmHopefully once Torrens to Darlington begins the government will set to work planning the next big infrastructure project so we can retain the skills gained from this project and roll that expertise over to the next project. Likewise with the group that will be grade separating the tram line.
A continuous pipeline of works is the only sensible way to build big infrastructure.
Sent from my iPhone using Tapatalk
[U/C] Re: M2 North-South Motorway
Or SE Freeway link to NS Motorway?rev wrote:Was about to post the same thing, with 3 TBM's they should start looking at rail infrastructure next.SRW wrote: ↑Sun Aug 11, 2024 6:59 pmAgreed. If this will be done by 2030, we should be planning now for the city rail tunnel to start from about the same time if not earlier. Complete it by 2036 for the state's bicentennial.Spotto wrote: ↑Sun Aug 11, 2024 6:38 pmHopefully once Torrens to Darlington begins the government will set to work planning the next big infrastructure project so we can retain the skills gained from this project and roll that expertise over to the next project. Likewise with the group that will be grade separating the tram line.
A continuous pipeline of works is the only sensible way to build big infrastructure.
- SouthAussie94
- Legendary Member!
- Posts: 585
- Joined: Tue Mar 27, 2012 10:03 pm
- Location: Southern Suburbs
[U/C] Re: M2 North-South Motorway
3x TBMs, 4x tunnels. So at least one of the TBMs will be reused?Vasco wrote: ↑Sun Aug 11, 2024 7:37 pmNot an expert by any means, however my understanding is that the TBMs get buried on site as is too complex/costly to remove / reuse and have been designed for a specific purpose?rev wrote:Was about to post the same thing, with 3 TBM's they should start looking at rail infrastructure next.
Sent from my iPhone using Tapatalk
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
[U/C] Re: M2 North-South Motorway
Yes again not an expert, however that is built for the same project and being used in a very close proximity.SouthAussie94 wrote:3x TBMs, 4x tunnels. So at least one of the TBMs will be reused?Vasco wrote: ↑Sun Aug 11, 2024 7:37 pmNot an expert by any means, however my understanding is that the TBMs get buried on site as is too complex/costly to remove / reuse and have been designed for a specific purpose?rev wrote: Was about to post the same thing, with 3 TBM's they should start looking at rail infrastructure next.
Sent from my iPhone using Tapatalk
Nevertheless happy to hear from anyone with experience in the field or if someone wants to query this with DIT direct.
Sent from my iPhone using Tapatalk