[U/C] 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
Prodical
Legendary Member!
Posts: 603
Joined: Sun May 15, 2016 5:10 pm

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#106 Post by Prodical » Mon Sep 30, 2024 2:29 pm

Piling rig on site :)

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#107 Post by EBG » Wed Oct 02, 2024 12:29 pm

picture of the piling rig, 2/10/2024
Attachments
20241002_north tce.jpg

Prodical
Legendary Member!
Posts: 603
Joined: Sun May 15, 2016 5:10 pm

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#108 Post by Prodical » Mon Oct 21, 2024 12:10 pm

Piling rig has finished. This hotel will be a nice addition to North Tce.
Attachments
hotel 2.jpg
hotel 1.jpg

bigdog69
Sen-Rookie-Sational
Posts: 22
Joined: Tue Jan 21, 2020 4:35 pm

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#109 Post by bigdog69 » Thu Oct 24, 2024 4:19 pm

The site is moving quick. Looking forward to see what the site will look like end of the year. :cheers:

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6421
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#110 Post by rev » Thu Oct 24, 2024 4:33 pm

Great view those balconies on the existing hotels are going to have

Prodical
Legendary Member!
Posts: 603
Joined: Sun May 15, 2016 5:10 pm

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#111 Post by Prodical » Fri Oct 25, 2024 7:54 pm

A couple of photos from today - there are outside stairs on the adjacent building so some better shots of the foundations.

Wondering if the foundation with the 4 columns is for the crane base?
Attachments
hotel 2.jpg
hotel 1.jpg

User avatar
Pikey
VIP Member
VIP Member
Posts: 2492
Joined: Wed Jul 13, 2005 7:41 am
Location: Sitting Down

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#112 Post by Pikey » Sat Oct 26, 2024 6:53 am

I'd say you're correct Prodical, that looks like a crane pad to me!
Walking on over....

| Sensational-Adelaide.com Moderator |

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6421
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#113 Post by rev » Sat Oct 26, 2024 4:06 pm

Is it a bit odd to be putting the crane at the back of the site like that when access to the site is from the front?

User avatar
AG
VIP Member
VIP Member
Posts: 2097
Joined: Thu Jul 21, 2005 9:44 am
Location: Adelaide SA

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#114 Post by AG » Sun Oct 27, 2024 12:17 pm

I don't think that's the crane pad. Looks like a pad footing with starter bars for columns. Crane pad would be near the front of the site.

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#115 Post by EBG » Thu Oct 31, 2024 1:58 pm

crane base (non Favco type) being installed on footpath at front of site today - see crane news.

Prodical
Legendary Member!
Posts: 603
Joined: Sun May 15, 2016 5:10 pm

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#116 Post by Prodical » Mon Nov 11, 2024 5:31 pm

A quick photo from a moving tram...

There have been lots of concrete pours lately for the slab, with a large cube of concrete on the north tec footpath with the crane base enclosed in it.

Wondering if the crane will have to start of high (ie around 16 levels off the ground) so as not to disturb residents in the apartments on either side? The heavy concrete crane base would provide stability until the crane can be anchored to the side of the building as it rises?
Attachments
base 2.jpg
Base 1.jpg

Ben
VIP Member
VIP Member
Posts: 7574
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#117 Post by Ben » Mon Nov 18, 2024 4:56 pm

Crane is scheduled to go up this weekend.

User avatar
Pikey
VIP Member
VIP Member
Posts: 2492
Joined: Wed Jul 13, 2005 7:41 am
Location: Sitting Down

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#118 Post by Pikey » Tue Nov 19, 2024 8:51 am

Prodical wrote:
Mon Nov 11, 2024 5:31 pm
A quick photo from a moving tram...

There have been lots of concrete pours lately for the slab, with a large cube of concrete on the north tec footpath with the crane base enclosed in it.

Wondering if the crane will have to start of high (ie around 16 levels off the ground) so as not to disturb residents in the apartments on either side? The heavy concrete crane base would provide stability until the crane can be anchored to the side of the building as it rises?
I guess it all comes down to the type of crane is use. Originally I would have suggested a hammerhead crane due to flight path proximity, but with the new 27 level Festival Tower that would change OLS rules it could be a luffing crane. Also looking at the base that's in place it more than likely will be an electric crane, my guess similar to the core crane in use on the Central Markets site.
Walking on over....

| Sensational-Adelaide.com Moderator |

User avatar
Pikey
VIP Member
VIP Member
Posts: 2492
Joined: Wed Jul 13, 2005 7:41 am
Location: Sitting Down

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#119 Post by Pikey » Sun Nov 24, 2024 5:34 pm

I drove past this afternoon and the crane is an electric luffing crane. The boom was nearly finished its assembly. No climbing collar yet, but it'll definitely need one.
Walking on over....

| Sensational-Adelaide.com Moderator |

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel

#120 Post by EBG » Mon Nov 25, 2024 10:43 am

Picture from Memorial Drive 5.15pm nearly complete. mobile erecting crane also in picture.
Attachments
20241124_crane 5.15pm.jpg