PRO: Marion, Cross & Morphett Roads LCR | $400m

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
NTRabbit
High Rise Poster!
Posts: 388
Joined: Fri Dec 28, 2018 10:00 pm

Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#76 Post by NTRabbit » Tue Nov 12, 2024 3:52 pm

Works are commencing this Sunday 17/11 on the Morphett Rd level crossing removal, running to "late December", they're saying impacts on everything from Anzac to Bray so I expect they'll be using that whole length as switchable 1 lane each way while they work on the other.

The bike path is being closed from Buttrose St in Glengowrie all the way to Park Tce in Plympton for some reason, but only 7am-5pm, and just for 1 week until 24/11

Not sure exactly what they'll be doing, since I didn't think they were closing the tram line down for the three removals until the second half of 2025

User avatar
Spotto
Legendary Member!
Posts: 753
Joined: Wed May 15, 2019 9:05 pm

Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#77 Post by Spotto » Tue Nov 12, 2024 5:28 pm

NTRabbit wrote:
Tue Nov 12, 2024 3:52 pm
Works are commencing this Sunday 17/11 on the Morphett Rd level crossing removal, running to "late December", they're saying impacts on everything from Anzac to Bray so I expect they'll be using that whole length as switchable 1 lane each way while they work on the other.

The bike path is being closed from Buttrose St in Glengowrie all the way to Park Tce in Plympton for some reason, but only 7am-5pm, and just for 1 week until 24/11

Not sure exactly what they'll be doing, since I didn't think they were closing the tram line down for the three removals until the second half of 2025
Likely service relocations and enabling works

PD2/20
High Rise Poster!
Posts: 392
Joined: Sun Feb 23, 2014 2:32 pm

Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#78 Post by PD2/20 » Mon Nov 18, 2024 4:24 pm

NTRabbit wrote:
Tue Nov 12, 2024 3:52 pm
Works are commencing this Sunday 17/11 on the Morphett Rd level crossing removal, running to "late December", they're saying impacts on everything from Anzac to Bray so I expect they'll be using that whole length as switchable 1 lane each way while they work on the other.

The bike path is being closed from Buttrose St in Glengowrie all the way to Park Tce in Plympton for some reason, but only 7am-5pm, and just for 1 week until 24/11

Not sure exactly what they'll be doing, since I didn't think they were closing the tram line down for the three removals until the second half of 2025
There is an RAA Road Works Notice on Facebook https://www.facebook.com/photo/?fbid=11 ... 3595452621:
Works on the Morphett Road level crossing removal are underway from THIS Sunday [ie 10th November]🚧

The works will affect these roads and intersections:
👉 The intersection of Anzac Highway and Morphett Road
👉 Morphett Road between the level crossing and Bray Street
👉 On Maxwell Terrace between Buttrose Street and Morphett Road
👉 Closure of the Mike Turtur Bikeway between Buttrose Street and Park terrace from 7pm to 5am from 24 November for one week
This indicates overnight closures next week. No sign of activity today.

I wonder if this is work on the 11kV electricity line which runs along Maxwell Tce and between the cycle path and the tram route E of Morphett Rd. A new Stobie pole has been installed just outside the Tram Depot admin building with two sets of underground cables awaiting connection to the overhead line.

Post Reply

Who is online

Users browsing this forum: Bing [Bot], Majestic-12 [Bot] and 5 guests