[U/C] Marion, Cross & Morphett Roads LCR | $400m

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
NTRabbit
High Rise Poster!
Posts: 404
Joined: Fri Dec 28, 2018 10:00 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#76 Post by NTRabbit » Tue Nov 12, 2024 3:52 pm

Works are commencing this Sunday 17/11 on the Morphett Rd level crossing removal, running to "late December", they're saying impacts on everything from Anzac to Bray so I expect they'll be using that whole length as switchable 1 lane each way while they work on the other.

The bike path is being closed from Buttrose St in Glengowrie all the way to Park Tce in Plympton for some reason, but only 7am-5pm, and just for 1 week until 24/11

Not sure exactly what they'll be doing, since I didn't think they were closing the tram line down for the three removals until the second half of 2025

User avatar
Spotto
Legendary Member!
Posts: 814
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#77 Post by Spotto » Tue Nov 12, 2024 5:28 pm

NTRabbit wrote:
Tue Nov 12, 2024 3:52 pm
Works are commencing this Sunday 17/11 on the Morphett Rd level crossing removal, running to "late December", they're saying impacts on everything from Anzac to Bray so I expect they'll be using that whole length as switchable 1 lane each way while they work on the other.

The bike path is being closed from Buttrose St in Glengowrie all the way to Park Tce in Plympton for some reason, but only 7am-5pm, and just for 1 week until 24/11

Not sure exactly what they'll be doing, since I didn't think they were closing the tram line down for the three removals until the second half of 2025
Likely service relocations and enabling works

PD2/20
High Rise Poster!
Posts: 409
Joined: Sun Feb 23, 2014 2:32 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#78 Post by PD2/20 » Mon Nov 18, 2024 4:24 pm

NTRabbit wrote:
Tue Nov 12, 2024 3:52 pm
Works are commencing this Sunday 17/11 on the Morphett Rd level crossing removal, running to "late December", they're saying impacts on everything from Anzac to Bray so I expect they'll be using that whole length as switchable 1 lane each way while they work on the other.

The bike path is being closed from Buttrose St in Glengowrie all the way to Park Tce in Plympton for some reason, but only 7am-5pm, and just for 1 week until 24/11

Not sure exactly what they'll be doing, since I didn't think they were closing the tram line down for the three removals until the second half of 2025
There is an RAA Road Works Notice on Facebook https://www.facebook.com/photo/?fbid=11 ... 3595452621:
Works on the Morphett Road level crossing removal are underway from THIS Sunday [ie 10th November]🚧

The works will affect these roads and intersections:
👉 The intersection of Anzac Highway and Morphett Road
👉 Morphett Road between the level crossing and Bray Street
👉 On Maxwell Terrace between Buttrose Street and Morphett Road
👉 Closure of the Mike Turtur Bikeway between Buttrose Street and Park terrace from 7pm to 5am from 24 November for one week
This indicates overnight closures next week. No sign of activity today.

I wonder if this is work on the 11kV electricity line which runs along Maxwell Tce and between the cycle path and the tram route E of Morphett Rd. A new Stobie pole has been installed just outside the Tram Depot admin building with two sets of underground cables awaiting connection to the overhead line.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2863
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#79 Post by ChillyPhilly » Fri Feb 14, 2025 9:23 am

Can we add the South Road Crossing to this thread and title officially?

The Morphett and Marion/Cross Road LCR, along with South Road, is being handled by the Tram Grade Separation Project (TGSP) Alliance.

Two renders from their site: https://www.tgsp.sa.gov.au/

Image

Also, there is a single connection to the depot in this render below. It seems trams will finish their runs in Glenelg before turning into the depot:

Image

South Road overpass render:

Image
Last edited by ChillyPhilly on Fri Feb 14, 2025 9:23 am, edited 1 time in total.
Our state, our city, our future.

All views expressed on this forum are my own.

User avatar
SouthAussie94
Legendary Member!
Posts: 628
Joined: Tue Mar 27, 2012 10:03 pm
Location: Southern Suburbs

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#80 Post by SouthAussie94 » Fri Feb 14, 2025 9:33 am

Is that the first render that shows how the tram depot will be accessed?
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"

Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation

User avatar
Norman
Donating Member
Donating Member
Posts: 6514
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#81 Post by Norman » Fri Feb 14, 2025 10:03 am

SouthAussie94 wrote:
Fri Feb 14, 2025 9:33 am
Is that the first render that shows how the tram depot will be accessed?
Yes, the trams travel alongside the bridge before switching onto the main tracks. There will be a crossover allowing trams to start from Stop 13 Glengowrie.

EBG
Super Size Scraper Poster!
Posts: 3216
Joined: Fri Jul 12, 2013 10:49 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#82 Post by EBG » Fri Feb 21, 2025 3:29 pm

Is that a completely new over pass bridge for trams just near anzac hwy

User avatar
[Shuz]
Super Size Scraper Poster!
Posts: 3358
Joined: Sun Apr 10, 2011 5:26 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#83 Post by [Shuz] » Fri Feb 21, 2025 4:36 pm

For the umpteenth time, yes.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.

User avatar
Spotto
Legendary Member!
Posts: 814
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#84 Post by Spotto » Fri Feb 21, 2025 4:38 pm

EBG wrote:
Fri Feb 21, 2025 3:29 pm
Is that a completely new over pass bridge for trams just near anzac hwy
Was “ Marion, Cross & Morphett Roads LCR | $400m” and all the tram crossing talk and photos not clear enough?

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2863
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#85 Post by ChillyPhilly » Fri Feb 21, 2025 5:28 pm

EBG wrote:Is that a completely new over pass bridge for trams just near anzac hwy
For over South Road, yes. The overpass will be rebuilt.
Our state, our city, our future.

All views expressed on this forum are my own.

PD2/20
High Rise Poster!
Posts: 409
Joined: Sun Feb 23, 2014 2:32 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#86 Post by PD2/20 » Fri Feb 21, 2025 7:13 pm

EBG wrote:
Fri Feb 21, 2025 3:29 pm
Is that a completely new over pass bridge for trams just near anzac hwy
The tram overpass at South Rd, and the tram level crossings Marion, Cross and Morphett Rds are all close to Anzac Hwy. All will be replaced by new overpasses under the scope of the tram overpass project.

User avatar
Norman
Donating Member
Donating Member
Posts: 6514
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#87 Post by Norman » Sat Feb 22, 2025 11:21 am

The South Road overpass will only partially be rebuilt, the existing station and eastern section will stay as-is, but the bridge spans to the west will be replaced with longer spans to accommodate the wider motorway.

EBG
Super Size Scraper Poster!
Posts: 3216
Joined: Fri Jul 12, 2013 10:49 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#88 Post by EBG » Sun Feb 23, 2025 3:47 pm

Thanks Norman,
that is what I thought would be the mmost logical solution.

User avatar
Spotto
Legendary Member!
Posts: 814
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#89 Post by Spotto » Sun Feb 23, 2025 4:47 pm

Norman wrote:
Sat Feb 22, 2025 11:21 am
The South Road overpass will only partially be rebuilt, the existing station and eastern section will stay as-is, but the bridge spans to the west will be replaced with longer spans to accommodate the wider motorway.
Logical, but I’m a bit surprised they’re not taking the eastern section down too. I thought the repairs they made to the bikeway and cracking concrete were only meant to be until the motorway upgrade where they’d be altering the overpass anyway?

User avatar
Norman
Donating Member
Donating Member
Posts: 6514
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m

#90 Post by Norman » Mon Feb 24, 2025 12:59 am

Spotto wrote:
Sun Feb 23, 2025 4:47 pm
Norman wrote:
Sat Feb 22, 2025 11:21 am
The South Road overpass will only partially be rebuilt, the existing station and eastern section will stay as-is, but the bridge spans to the west will be replaced with longer spans to accommodate the wider motorway.
Logical, but I’m a bit surprised they’re not taking the eastern section down too. I thought the repairs they made to the bikeway and cracking concrete were only meant to be until the motorway upgrade where they’d be altering the overpass anyway?
I'm pretty sure the broken span was replaced, not repaired. The project team said that they are satisfied with it remaining in place.