[U/C] Marion, Cross & Morphett Roads LCR | $400m
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
Works are commencing this Sunday 17/11 on the Morphett Rd level crossing removal, running to "late December", they're saying impacts on everything from Anzac to Bray so I expect they'll be using that whole length as switchable 1 lane each way while they work on the other.
The bike path is being closed from Buttrose St in Glengowrie all the way to Park Tce in Plympton for some reason, but only 7am-5pm, and just for 1 week until 24/11
Not sure exactly what they'll be doing, since I didn't think they were closing the tram line down for the three removals until the second half of 2025
The bike path is being closed from Buttrose St in Glengowrie all the way to Park Tce in Plympton for some reason, but only 7am-5pm, and just for 1 week until 24/11
Not sure exactly what they'll be doing, since I didn't think they were closing the tram line down for the three removals until the second half of 2025
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
Likely service relocations and enabling worksNTRabbit wrote: ↑Tue Nov 12, 2024 3:52 pmWorks are commencing this Sunday 17/11 on the Morphett Rd level crossing removal, running to "late December", they're saying impacts on everything from Anzac to Bray so I expect they'll be using that whole length as switchable 1 lane each way while they work on the other.
The bike path is being closed from Buttrose St in Glengowrie all the way to Park Tce in Plympton for some reason, but only 7am-5pm, and just for 1 week until 24/11
Not sure exactly what they'll be doing, since I didn't think they were closing the tram line down for the three removals until the second half of 2025
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
There is an RAA Road Works Notice on Facebook https://www.facebook.com/photo/?fbid=11 ... 3595452621:NTRabbit wrote: ↑Tue Nov 12, 2024 3:52 pmWorks are commencing this Sunday 17/11 on the Morphett Rd level crossing removal, running to "late December", they're saying impacts on everything from Anzac to Bray so I expect they'll be using that whole length as switchable 1 lane each way while they work on the other.
The bike path is being closed from Buttrose St in Glengowrie all the way to Park Tce in Plympton for some reason, but only 7am-5pm, and just for 1 week until 24/11
Not sure exactly what they'll be doing, since I didn't think they were closing the tram line down for the three removals until the second half of 2025
This indicates overnight closures next week. No sign of activity today.Works on the Morphett Road level crossing removal are underway from THIS Sunday [ie 10th November]
The works will affect these roads and intersections:
The intersection of Anzac Highway and Morphett Road
Morphett Road between the level crossing and Bray Street
On Maxwell Terrace between Buttrose Street and Morphett Road
Closure of the Mike Turtur Bikeway between Buttrose Street and Park terrace from 7pm to 5am from 24 November for one week
I wonder if this is work on the 11kV electricity line which runs along Maxwell Tce and between the cycle path and the tram route E of Morphett Rd. A new Stobie pole has been installed just outside the Tram Depot admin building with two sets of underground cables awaiting connection to the overhead line.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2863
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
Can we add the South Road Crossing to this thread and title officially?
The Morphett and Marion/Cross Road LCR, along with South Road, is being handled by the Tram Grade Separation Project (TGSP) Alliance.
Two renders from their site: https://www.tgsp.sa.gov.au/

Also, there is a single connection to the depot in this render below. It seems trams will finish their runs in Glenelg before turning into the depot:

South Road overpass render:

The Morphett and Marion/Cross Road LCR, along with South Road, is being handled by the Tram Grade Separation Project (TGSP) Alliance.
Two renders from their site: https://www.tgsp.sa.gov.au/
Also, there is a single connection to the depot in this render below. It seems trams will finish their runs in Glenelg before turning into the depot:
South Road overpass render:
Last edited by ChillyPhilly on Fri Feb 14, 2025 9:23 am, edited 1 time in total.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
- SouthAussie94
- Legendary Member!
- Posts: 628
- Joined: Tue Mar 27, 2012 10:03 pm
- Location: Southern Suburbs
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
Is that the first render that shows how the tram depot will be accessed?
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
Yes, the trams travel alongside the bridge before switching onto the main tracks. There will be a crossover allowing trams to start from Stop 13 Glengowrie.SouthAussie94 wrote: ↑Fri Feb 14, 2025 9:33 amIs that the first render that shows how the tram depot will be accessed?
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
Is that a completely new over pass bridge for trams just near anzac hwy
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
For the umpteenth time, yes.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
Was “ Marion, Cross & Morphett Roads LCR | $400m” and all the tram crossing talk and photos not clear enough?
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2863
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
For over South Road, yes. The overpass will be rebuilt.EBG wrote:Is that a completely new over pass bridge for trams just near anzac hwy
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
The tram overpass at South Rd, and the tram level crossings Marion, Cross and Morphett Rds are all close to Anzac Hwy. All will be replaced by new overpasses under the scope of the tram overpass project.
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
The South Road overpass will only partially be rebuilt, the existing station and eastern section will stay as-is, but the bridge spans to the west will be replaced with longer spans to accommodate the wider motorway.
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
Thanks Norman,
that is what I thought would be the mmost logical solution.
that is what I thought would be the mmost logical solution.
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
Logical, but I’m a bit surprised they’re not taking the eastern section down too. I thought the repairs they made to the bikeway and cracking concrete were only meant to be until the motorway upgrade where they’d be altering the overpass anyway?
[U/C] Re: PRO: Marion, Cross & Morphett Roads LCR | $400m
I'm pretty sure the broken span was replaced, not repaired. The project team said that they are satisfied with it remaining in place.