Re: Belair/Noarlunga line upgrade reports

#481 Post by Norman » Tue Apr 29, 2008 12:05 pm

As I've said before, the only way there could be a tunnel would be if the system was electified first.

User avatar
SRW
Donating Member
Donating Member
Posts: 3650
Joined: Fri Jun 08, 2007 9:42 pm
Location: Glenelg

Re: Belair/Noarlunga line upgrade reports

#482 Post by SRW » Tue Apr 29, 2008 12:47 pm

urban wrote:While I generally hate transport infrastructure being elevated above ground, it may be the best option here as it might reduce the gradient of the track enough to enable the train to reach Flinders Uni and Medical Centre. This would ensure high levels of commuters in both directions during peak hour.
While I don't have a problem with short lengths of elevated railways (though I dislike road overpasses), overcoming the gradient is why I suggested one here. Tunnelling is just not feasible, practically and cost-wise.
Keep Adelaide Weird

muzzamo
Legendary Member!
Posts: 1029
Joined: Tue Aug 21, 2007 4:44 pm

Re: Belair/Noarlunga line upgrade reports

#483 Post by muzzamo » Tue Apr 29, 2008 1:03 pm


User avatar
AtD
VIP Member
VIP Member
Posts: 4581
Joined: Wed Jul 20, 2005 7:00 pm
Location: Sydney

Re: Belair/Noarlunga line upgrade reports

#484 Post by AtD » Tue Apr 29, 2008 4:15 pm

Norman wrote:As I've said before, the only way there could be a tunnel would be if the system was electified first.
Either that, or the tunnel would require exausht stacks, like Sydney's motorways.

User avatar
Düsseldorfer
High Rise Poster!
Posts: 288
Joined: Sat Sep 15, 2007 3:52 am

Re: Belair/Noarlunga line upgrade reports

#485 Post by Düsseldorfer » Tue Apr 29, 2008 10:30 pm

AtD wrote:
Norman wrote:As I've said before, the only way there could be a tunnel would be if the system was electified first.
Either that, or the tunnel would require exausht stacks, like Sydney's motorways.
Or a system like what is used at Adelaide Railway Station...

User avatar
Wayno
VIP Member
VIP Member
Posts: 5138
Joined: Mon Dec 17, 2007 2:18 pm
Location: Torrens Park

Re: Belair/Noarlunga line upgrade reports

#486 Post by Wayno » Wed Apr 30, 2008 9:07 am

Düsseldorfer wrote:
AtD wrote:
Norman wrote:As I've said before, the only way there could be a tunnel would be if the system was electified first.
Either that, or the tunnel would require exausht stacks, like Sydney's motorways.
Or a system like what is used at Adelaide Railway Station...
surely it could be open cut 90% of the tunnell length? covered at sturt and south rd obviously. all depends where it terminates. For example, would it be acceptable to terminate alongside the new elevated carpark adjacent to the hospital? There could then be a pedestrian tunnell across to the hospital and uni.
Opportunity is missed by most people because it is dressed in overalls and looks like work.

User avatar
Shuz
Banned
Banned
Posts: 2539
Joined: Sat Jun 02, 2007 1:48 pm
Location: Glandore

Re: Belair/Noarlunga line upgrade reports

#487 Post by Shuz » Thu May 01, 2008 1:42 pm

Personally I think pedestrian tunnels are a very serious crime risk. CCTV footage inside wouldn't do much to ease issues that may arise because of the lack of visibility from the outside.

It makes logical sense to implement a viaduct down to the university for several of the reasons mentioned previously. Anyway, who said they had to be ugly? Look what Melbourne does with its transport infrastructure!

User avatar
Omicron
Super Size Scraper Poster!
Posts: 2336
Joined: Mon Oct 15, 2007 2:46 pm

Re: Belair/Noarlunga line upgrade reports

#488 Post by Omicron » Thu May 01, 2008 11:52 pm

Shuz wrote:Personally I think pedestrian tunnels are a very serious crime risk. CCTV footage inside wouldn't do much to ease issues that may arise because of the lack of visibility from the outside.
I agree. The '70s pedestrian underpasses that disappear under so many of our suburban train stations are just awful - one enters narrow, barren underground corridors with a feeling of trepidation, and is met by the overwhelming stench of three thousand people having urinated over every flat surface the night before.

Never underestimate the appeal of natural light and openness.

Somebody
High Rise Poster!
Posts: 252
Joined: Fri May 02, 2008 6:06 pm
Location: Australia (East Coast)

Re: Belair/Noarlunga line upgrade reports

#489 Post by Somebody » Fri May 02, 2008 6:34 pm

Will409 wrote:Let's just say that even when Mitsubishi was still operating, you could count the number of people using the train with one hand.
I always thought that Tonsley itself generated most patronage on the line, not Clovelly Park (Mitsubishi), or Mitchell Park.

Of course the last time I went to Tonsley was about a year ago, and the last time I was in Adelaide was also in 2007, so anything I say should be taken with a few grains of salt :lol: :lol:

Wasn't it only in 2004 when Tonsley started to run off-peak? I was told that by a member of another forum.
The Gold Coast - Australia's centre for insipid, tacky & boring.

User avatar
Norman
Donating Member
Donating Member
Posts: 6488
Joined: Sun Mar 25, 2007 1:06 pm

Re: Belair/Noarlunga line upgrade reports

#490 Post by Norman » Sat May 03, 2008 8:34 am

No, it's been running longer than that. Here's the 2003 timetable for the Noarlunga line:

http://web.archive.org/web/200308020514 ... ttable.pdf

ozisnowman
High Rise Poster!
Posts: 354
Joined: Wed Jun 06, 2007 12:34 pm

Re: Electrification and Resleepering of TransAdelaide Network

#491 Post by ozisnowman » Fri Jun 06, 2008 9:38 am

Good to see most of Adelaide's train network is to be resleepered and electrified. Hope they standardise the line
in the process. Also it is very short sighted in not standarising and electrifying the Belair line and extending it
to at least Mount Barker. Keeping 12 diesel trains for the Belair line will become a maintenance nightmare.

User avatar
Mr.Frodo
Donating Member
Donating Member
Posts: 21
Joined: Thu Nov 01, 2007 7:23 pm
Location: City / One Tree Hill

Re: Electrification and Resleepering of TransAdelaide Network

#492 Post by Mr.Frodo » Fri Jun 06, 2008 9:52 am

Hold on, the haven't said they will never electrify the Belair line, they just haven't announced it in this budget. From the DTEI paper : "The Federal Government has committed $3m on a study into the future of the Hills Freight Rail line, which runs alongside the Belair passenger line through the Adelaide Hills. No decision will be made on electrifying the Belair line until that work is completed."


"Why is the Belair line not being electrified? The Belair rail line is a very important part of the train network and we are committed to its continued use. However, electrification of the Belair line requires further engineering and operational analysis. There are two tunnels and the interstate rail line is very close. The Federal Government has also just started
a study into the future of that line. It is worth noting the Belair line will have much better services anyway. The re-sleepered track will make the journey faster and there will be more railcars available once the new electric trains are available."

User avatar
rhino
Super Size Scraper Poster!
Posts: 3090
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

Re: Electrification and Resleepering of TransAdelaide Network

#493 Post by rhino » Fri Jun 06, 2008 10:01 am

ozisnowman wrote: Also it is very short sighted in not standarising and electrifying the Belair line and extending it
to at least Mount Barker
.
Oh for Pete's sake! How many times do we have to hear this crap?

Also, if you actually read the report, standardisation is part of it. It's gonna be damn hard to run a hybrid tram-train on a standard gauge tram track and a broad gauge train track isn't it? :roll:
cheers,
Rhino

muzzamo
Legendary Member!
Posts: 1029
Joined: Tue Aug 21, 2007 4:44 pm

Re: Electrification and Resleepering of TransAdelaide Network

#494 Post by muzzamo » Fri Jun 06, 2008 10:17 am

congrats we have now dug up an old thread and have the same topic running on three threads now

crawf
Donating Member
Donating Member
Posts: 5527
Joined: Thu Feb 16, 2006 7:49 pm
Location: Adelaide

Re: Electrification and Resleepering of TransAdelaide Network

#495 Post by crawf » Fri Jun 06, 2008 10:36 am

Mount Barker to City

Via Freeway/Glen Osmond Road - 34km (incl 40min express bus ride)
Via Railway Line - around 55km (over a hour train ride)

Enough said